Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
3 Cards in this Set
- Front
- Back
To buy this assignment, copy and paste below link in your browser:
http://www.homeworkfortune.com/BUS-519-Assign-3-Risk-Workshop-Risk-Register-Flayton-Electron-BUS519-07.htm OR Visit: www.homeworkfortune.com |
BUS 519 Week 6 Assignment 3 Risk Work shop and Risk Register (Flayton Electronics Case)
Write an eight to ten (8-10) pages paper Risk Workshop and Risk Register Component paper in which you: 1. Identify the required pre-workshop activities. 2. Prepare a risk workshop agenda based on Figure B-8, Sample Agenda for a First Risk Assessment / Two – Day Risk Workshop (Appendix B of the Hillson and Simon text). Include suggested time intervals for each activity and justify why each agenda item is relevant for this case. 3. Determine the top five (5) threats in a risk register following Figure B-11, Sample Simplified Risk Register Format (Appendix B of the Hillson and Simon text). Include information from the case for each threat. |
|
To buy this assignment, copy and paste below link in your browser:
http://www.homeworkfortune.com/BUS-519-Assign-3-Risk-Workshop-Risk-Register-Flayton-Electron-BUS519-07.htm OR Visit: www.homeworkfortune.com |
4. Justify the assignment of probability and impacts for each threat identified in criterion number 3 of this assignment.
5. Document the top three (3) opportunities in a risk register following Figure B-11, Sample Simplified Risk Register Format (Appendix B of the Hillson and Simon text). Include information from the case for each opportunity. 6. Justify the assignment of probability and impacts for each opportunity identified in criterion number 5 of this assignment. |
|
To buy this assignment, copy and paste below link in your browser:
http://www.homeworkfortune.com/BUS-519-Assign-3-Risk-Workshop-Risk-Register-Flayton-Electron-BUS519-07.htm OR Visit: www.homeworkfortune.com |
7. Use at least two (2) quality resources in this assignment.
Note: Wikipedia and similar Websites do not qualify as quality resources. Your assignment must follow these formatting requirements: • Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides. • Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length. |