• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/35

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

35 Cards in this Set

  • Front
  • Back

NAVMED 6470/14 (9-2002)

Radiological Equipment Survey Request Form

BUMEDINST 6470.22A

Navy Radiological Systems Performance Evaluation Program
Purpose of BUMEDINST 6470.22A
to provide guidance on the radiological safety management of all imaging systems in Navy medicine.

What ageny must x-ray equipment used in Federal facilities meet guidelines for?

Federal Drug Administration

Navy Enviornmental Health Center

NAVENVHLTHCEN

who approves and maintains a list of shielding designers qualified to design structural radiation shielding

NAVENVHLTHCEN
NAVMEDLOGCOM
Navy Medical Logistics Command

Who notifes commands who are recieivng new equipment or repairs within 10 working days of new contract

NAVMEDLOGCOM
Who ensure that new systems are evaluated within 30 days
commanding officer

Dental x-ray equipment is evaluated how often?

36 months
Qualified surveyors notify CO of each evaluated system within what time frame
30 working days
Who will notify commands receiving awarded contracts of new and replacement radiological equipment
NAVMEDLOGCOM
Notification to commands of awarded radiological equipment contract will that place in how many days
10 working days
All installation of radiological equipment must be evaluated in how many days
30 days
Ensure all radiological equipment(mobile or fixed) ASHORE be evaluated how often
annually
Ensure all radiological equipment(mobile or fixed) OTHER THAN SHORE be evaluated how often
24 months
"DENTAL" (mobile and fixed) radiological equipment will be evaluated how often
36 months

Maintain all systems evaluations reports for how long

3 years

Who will notify commands receiving awarded contracts of new and replacement radiological equipment
NAVMEDLOGCOM
Notification to commands of awarded radiological equipment contract will that place in how many days
10 working days
All installation of radiological equipment must be evaluated in how many days
30 days
Ensure all radiological equipment(mobile or fixed) ASHORE be evaluated how often
annually
Ensure all radiological equipment(mobile or fixed) OTHER THAN SHORE be evaluated how often
24 months
"DENTAL" (mobile and fixed) radiological equipment will be evaluated how often
36 months
Maintain all systems evaluations reports for how long
3 years
BUMEDINST 6470.22A
Navy Radiological System Evaluation Program
Purpose?
provide guidance on the radiological safety management of all imagining systems in Navy medicine.
NAVMEDLOGCOM will notify facilities receiving new and replacement systems of prospective installation within?
10 working days of the equipment contract award.
All radiological systems shall be evaluated within?
30 days of installation and after major repairs.
Newly installed systems shall be evaluated when?
Prior to initial clinical use.
Medical x–ray units (fixed or mobile) ashore and on hospital ships are evaluated?
Annually
All fixed x–ray units afloat are evaluated?
Bi–annually. (24 months)
Dental (fixed and portable) units are evaluated?
36 – months.
How long are evaluation reports maintained?
3 years
How long are the structural radiation shielding designs kept?

For the lifetime of the facility.