• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/3

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

3 Cards in this Set

  • Front
  • Back
BSOP-330 Week 5 Homework Problems Mater Production Schedule Problem 1, 2 and 3
Download answer at https://www.examtutorials.com/course/bsop-330-week-5-homework-problems-mater-production-schedule-problem-1-2-and-3/
<div><strong>BSOP330 Master Planning, Week 5, Problem 1</strong>MASTER PRODUCTION SCHEDULEMAKE-TO-STOCKBeginning PAB prior to week number one is 500.If the forecast is larger than the book orders, complete the MPS using the forecast demand. If the booked orders is larger than the forecast complete the MPS using the booked ordersLead-time for MPS releases is one week.All MPS releases must be in lot sizes of 250 units.Period order coverage is one period.1. Complete the MPS due line and the MPS released line.2. Complete the PAB line.3. Complete the ATP line.<strong>BSOP Master Planning, Week 5 Assignment, Problem Two</strong><strong>Make-to-Stock MPS</strong>GIVENS FOR THE MPS PROBLEM:1. Beginning on-hand inventory prior to week one is 200 units.2. If the forecast is larger than the book orders, complete the MPS using the forecast demand. If the booked orders is larger than the forecast complete the MPS using the booked orders3. Lead-time for MPS planned orders is one week.4. All MPS releases must be in lot sizes of 200 or multiples of 200.REQUIRED:Complete the MPS due and MPS planned lines.Calculate the new projected on-hand inventory line.Calculate the ATP line for the entire MPS.<strong>BSOP330 Master Planning, Week 5, Problem 3</strong><strong>Forecast Disaggregation</strong>Product Family BlendersModel NumberPercent of the Annual ForecastB-10010.00%B-2007.00%B-30025.00%B-40030.00&B-50012.00%B-60016.00%Total100.00%Note: the total percentage must equal exactly 100%.If the aggregate forecast for the family of blenders for the month of September is 5,000 units, complete the chart below.</div>
https://www.examtutorials.com/course/bsop-330-week-5-homework-problems-mater-production-schedule-problem-1-2-and-3/
About ExamTutorials?
Examtutorials.com is a commerical website helps the students in assignment solutions.
Why you choose Examtutorials.com?
High Quality, Fresh Online Study and more