• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/1

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

1 Cards in this Set

  • Front
  • Back
ExamTutorials.comhttp://www.examtutorials.comBSOP 330 Master Planning Week 6 Material Requirements Planning Discussion Question 1 Answerhttp://www.examtutorials.com/course/bsop-330-master-planning-week-6-material-requirementsplanning-discussion-question-1-answer/ Author : bminMaterial Requirements Planning (graded) What exactly is material requirements planning (MRP)? Why is MRP referred to as a dependent demand scheduling system? Once a material requirement plan (MRP) has been established, what other managerial application might be found for the technique? What is a BOM? What are some the common BOMs, and how are they different? What feeds the MPS? What is finite capacity scheduling (FCS) http://www.examtutorials.com/course/bsop-330-master-planning-week-6-material-requirementsplanning-discussion-question-1-answer/1/1Powered by TCPDF (www.tcpdf.org)
ExamTutorials.comhttp://www.examtutorials.comBSOP 330 Master Planning Week 6 Material Requirements Planning Discussion Question 1 Answerhttp://www.examtutorials.com/course/bsop-330-master-planning-week-6-material-requirementsplanning-discussion-question-1-answer/ Author : bminMaterial Requirements Planning (graded) What exactly is material requirements planning (MRP)? Why is MRP referred to as a dependent demand scheduling system? Once a material requirement plan (MRP) has been established, what other managerial application might be found for the technique? What is a BOM? What are some the common BOMs, and how are they different? What feeds the MPS? What is finite capacity scheduling (FCS) http://www.examtutorials.com/course/bsop-330-master-planning-week-6-material-requirementsplanning-discussion-question-1-answer/1/1Powered by TCPDF (www.tcpdf.org)