Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
3 Cards in this Set
- Front
- Back
BSOP 330 Master Planning Week 5 Master Scheduling Time Fences Discussion Question 1 Answer
|
Download answer at https://www.examtutorials.com/course/bsop-330-master-planning-week-5-master-scheduling-time-fences-discussion-question-1-answer/
<b>Master Scheduling Time Fences (graded) </b><b>Based on our discussion of master schedule time fences, why are they (or why are'nt they) so important in maintaining a stable master schedule? Hint: additional information on this subject can be found at <a href="http://www.apics.org">www.apics.org</a> </b><b>Which one of the time fences is the longest?</b><b><span style="text-decoration: underline;">What's the downside of using time fences, or is there any?</span></b><b>What is the MPS? What is it used for?</b><b>Master production schedule (what is to be made and when). A timetable that specifies what is to be made and when.</b><b>What feeds the MPS? </b><b>Why is it important to have a carefully developed production plan?</b><b>What is Master Production Schedule or MPS? </b><b><span style="text-decoration: underline;">What happens if the booking time fence is violated?</span></b><b><span style="text-decoration: underline;">What functions of a company affect an MRP system? Explain how?</span></b><b><span style="text-decoration: underline;">How does lot sizing fit into a MRP system?</span></b> https://www.examtutorials.com/course/bsop-330-master-planning-week-5-master-scheduling-time-fences-discussion-question-1-answer/ |
|
About ExamTutorials?
|
Examtutorials.com is a commerical website helps the students in assignment solutions.
|
|
Why you choose Examtutorials.com?
|
High Quality, Fresh Online Study and more
|