• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/4

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

4 Cards in this Set

  • Front
  • Back

1. The " balanced " cantilever construction method involves cantilevering segments outward from a fixed point on alternate sides

Segments, outward, fixed point, alternate sides

2. Usually used for long span bridges where temporary supports are not practical

Long span, temporary supports not feasible

3. End spans are typically erected on false work and joined to cantilevered units using closure pours

End spans, false work, joined, closure pours

4. Post tensioned steel must be designed to resist cantilever action under construction, during construction and once the bridge is operational.

Post tensioned steel, resist cantilever action, under, during, after