• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/39

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

39 Cards in this Set

  • Front
  • Back
Who distributes flying Hrs before the beginning of the fiscal Yr
Lead Command
What the the long-range plan begin with
Annual allocation of flying Hrs
What are some operational requirements for the long range plan
-flying days per month
-Annual Muns requirement
-Req flying Hrs/sorties in monthly increments
When is the quarterly planning held
NLT 14 days before the affected quarter
Who co-chairs the quarterly planning meeting
OG/CC and MXG/CC
What is the quarterly planning meeting for
Support future needs
What factors are considered when planning support for mission Req
-Weather conditions
-A/C availability
-Personnel capabilities
Who is responsible for generating the quarterly plan
PS&D
How is the quarterly plan defined
With the monthly plan
When are TCIs Req to be accomplished
On or before the due date
How is attrition defined
The reduction of sorties and Hrs due to certain factors
What can cause attrition
Air abort, Ground abort, weather, etc
What is attrition rate
Monthly projected % of attrition
What is attrition based on
Historical data
Who develops attrition rate
Analysis
Why should PS&D assure that attrition rate is reasonable
It directly affects the maintenance effort and capabilities
The attrition rate applies to
Primary missions
What formula is used to calculate scheduled missions
Contract missions + attrition rate
When should all problems be solved regarding monthly plan
Before the monthly meeting
What does the weekly planning refine
The monthly plan
What is used as a guide for the weekly plan
The monthly and quarterly
Who assigns tail #'s to the daily flying schedule
PS&D
Who is required to sign the Weekly Maintenance Plan
OG/CC, MXG/CC and Wing/CC
Who is responsible for controlling deviations
Operations and Maintenance
Which is the purpose of the Operational Event Subsystem
To plan execute and evaluate unit utilization
The ____stage is used to input initial data
Mission recording
What screen and TRIC is used for mission recording
341/OEL
What phase provides the ability for periodic reports of units mission flown
Analysis phase
What is the operational event load screen and TRIC
29
In the 2nd stage, what screen/TRIC is used for the operational time update
355 OUU (mission accomplishment)
726/SEA is used for
Shop equipment operations inquiry
Which screen/TRIC will give you the only background report
362/AUR
When a discrepency is found, who will input it into IMDS
Whomever finds it
Who creates work orders
-PS&D, ProSup, Debrief, Dock Chief, Specialist, etc
Who decides who will attend the planning meeting
MXG/CD
Which form is used to make changes to the daily schedule
AF Form 2407
which type of change must be done by 1600 on the prior Friday
Pen and Ink
Weight factor points are provided by whom
Lead Command
Computing the maintenance scheduling effectiveness rate (MSE) is the
40