• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/17

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

17 Cards in this Set

  • Front
  • Back
1. What do plans help us do?
RESPOND TO CRISIS!!
-they help us focus our efforts so we do the right things quickly and the most important things first.
2. What are the products of planning?
PLANS
OPERATING INSTRUCTIONS
CHECKLISTS
3. Why are civil engineers so involved in base advance planning?
They have a significant role in construction and base recovery.
4. Who is usually the focal point for CE-related contingency planning?
EMERGENCY MANAGEMENT FLIGHT
5. Why and how are major commands planning requirements different?
Major command planning requirements are not identical since the commands have different missions and geographical areas of responsibility.
6. What role does the BCE play in Base Planning?
Often tasked to develope separate civil engineer annexes or appendices to base plan.
7. What do CE contingency Response Plans in overseas theaters include in addition to standard response quidance?
(BRAAT) Base Recovery After Attack.
8. When listing the support provided to and from others, how are routine chores handled, and how are not so common tasks handled?
base support plan
9. For what situations might civil engineers be called upon to conduct a force beddown?
force beddown preceding war, beddown supporting military operations other than war (MOOTW), and beddown sheltering disaster victims, evacuees or refugees.
10. What are the 4 stages of military beddown operations?
INITIAL
INTERMEDIATE
FOLLOW-ON
SUSTAINMENT
11. During the initial phase of a beddown operation, what is the goal?
essential facilities and systems are set up to support sustained aircraft operations.
12. When do efforts to expand protective measures, such as CCD, hardening, and passive defense measures begin to increase?
As incoming forces arrive and have a place to live and work
13. What is the focus of civil engineers during the sustainment phase of a force beddown?
Civil engineers maintain the facilities and operate the utility systems
14. Although Civil Engineers preplan for many possible situations, what is expected when no plan exists for a beddown operation?
They must be able to develope requirements, sort out beddown priorities to get the critical efforts started quickly-- sometimes before all details are known, and then site, layout and erect or modify the facilities and utility systems.
15. Summarize the purpose of having civil engineers on an ADVON team.
they prepare for the arrival of the main deployment force.
*develope beddown details
*know commanders priorities
*locate vehicles and supplies
_________________________
Do a site layout, put up shelters, provide limited utility support
16.What are the 5 major steps to force protection planning?
DETERMINE ASSETS TO BE PROTECTED
DEFINE THREATS AND ATTACK PROBABILITIES
DETERMINE LEVELS OF PROTECTION FOR ASSETS
IDENTIFY CONSTRAINTS
DESIGN PROTECTIVE SYSTEMS TO COUNTER THREATS.
17. List and briefly describe the 3 types of assets to be protected.
.