Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
21 Cards in this Set
- Front
- Back
Equipment and Supplies Needed
|
-Basic Set up -Aesthetic Setup -Ruuber Dam Setup
-Saliva Ejector -HVE -Air Water Syringe -Slow Speed -Acrylric Burrs, Discs, and Mandrels -Highspeed -Broaches, Files, and Reamers -Endodontic Spoon Excavator, Spreader, and Condensor -Woodson, Articulating Paper, Floss -Irrigating Syringe/Solution -Bead Sterilizer, Butane Torch, or other heat source - Meication -Temp. Filling Material -Endodontic Ruler and Stops - Xray film Lead Apron. |
|
Proceedure Step 1
|
-Pass Mirror and Explorer (and 2X2 to wipe off explorer)
-Pass aesthetic syringe - Rinse Mouth |
|
Proceedure Step 2
|
-Place rubber dam on affected tooth
-Inform patient of the purpose of the rubber dam |
|
Proceedure Step 3
|
-While dentist performs tasks, keep area of the tooth free of debris and stay out of line of vision
|
|
Proceedure Step 4
|
-While dentist uses slow speed, the assistant may quickly rinse the mouth
|
|
Proceedure Step 5
|
-Dentist may want to use spoon excavator or explorer to locate the pulp chamber and canal openings
|
|
Proceedure Step 6
|
-Pass barbed broach. dentist may want to use several
|
|
Proceedure Step 7
|
-Pass #10 or #15 reamer with stopper, expose a radiograph for the dentist to see.
|
|
Proceedure Step 8
|
-Pass additional files until proper width and length of the canal is achieved, then record it on to the patients chart.
|
|
Proceedure Step 9
|
-Pass irrigating syringe/solution, keep HVE very close to the tooth so the solution does not splash the patient or dental dam
|
|
Proceedure Step 10
|
-Pass paper point with locking cotton pliers until canal(s) are completely dry
|
|
Proceedure Step 11
|
-Pass small cotton pellet containing medication
|
|
Proceedure Step 12
|
-Select master gutta percha using a radiograph to determine
|
|
Proceedure Step 13
|
-Mix sealer for the gutta percha point, so dentist can place it in canal
|
|
Proceedure Step 14
|
-Pass endodontic spreader, and necessary gutta percha points and continue until canal(s) is full
|
|
Proceedure Step 15
|
- Pass condensor and prepares the torch , the dentist holds 2x2 gauze, and hold HVE close to the tooth
|
|
Proceedure Step 16
|
Gauze and HVE
|
|
Proceedure Step 17
|
- Prepare temp. filling, pass woodson, pass damp cotton tip applicator
|
|
Proceedure Step 18
|
-Use HVE and air water syringe ro ensure the rubber dam is rinsed and free of debris, remove the rubber dam, and rinse patients mouth
|
|
Proceedure Step 19
|
-Dry tooth, pass articulating paper
|
|
Proceedure Step 20
|
-Expose final radiograph, and explain the post op instructions to the patient
|