• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/24

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

24 Cards in this Set

  • Front
  • Back

Competitive Bidding

Popular with owners; usually results in lowest construction cost

Value-based selection

Bidding that considers more than just the lowest cost; factors other aspects such as quality, schedule, contractor personnel

Negotiation

Owner works out final contract price with one contractor

AIA Document B101

Standard Form of Agreement Between Owner and Architect

Basis of Pre-qualification

- financial qualification


- personnel


- experience


- references


- size of firm


- bonding capability


- any special qualities that make them particularly suited for the project under consideration

Proprietary specifications

Most restrictive; require the use of a specific manufacturer's product

AIA Document A701

Instructions to Bidders

Instructions to Bidders and inclusions

AIA Document A701; bidder's representations; bidding documents info; interpretation or correction of bidding documents; substitutions; addenda; bidding procedures; modification or withdrawal of bid; consideration of bids; post-bid info; performance and payment bonds

AIA Document A305

Contractor's Qualification Statement

Contractor's Qualification Statement (AIA)

AIA Document A305

Performance Bond

A statement by a surety company that obligates complete construction of the project in the event that the contractor defaults on his or her obligations; paid by owner; included in construction cost amount

Labor and Material Payment Bonds

Protects owners from subs who might file liens if the GC defaults

AIA Document B132

Standard Form of Agreement Between Owner and Architect, CM as Adviser Ed.

Standard Form of Agreement Between Owner and Contractor, CM as Adviser Ed.

AIA Document A132

General Conditions of the Contract for Construction, CM as Adviser Ed.

AIA Document A232

Standard Form of Agreement Between Owner and Architect, CM as Constructor Ed.

AIA Document B133

General Conditions for the Contract for Construction (AIA)

AIA Document A201

Standard Form of Agreement Between Design-Builder and Architect (AIA)

AIA Document B143

Standard Form of Agreement Between Owner and Architect for IPD (AIA)

AIA Document B195

General Conditions of the Contract for IPD (AIA)

AIA Document A295

Buyout (IPD)

Process of selecting suppliers and finalizing prices from any remaining subs and vendors that are not part of the IPD process

Contractor's Qualification Statement (AIA)

AIA Document A305

AIA Document A133

Standard Form of Agreement Between Owner and CM as Constructor

Earned Value Management (Earned Value Analysis)

Used to determine SOV; attempts to predict both the time and money (or percentage of overall budget) that is required to complete certain tasks