• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/3

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

3 Cards in this Set

  • Front
  • Back
Who assumed the function of Water Supply and what are their starting steps for a Standard FDC Connection?
Third Engine
1. Supplementing sprinkler
2. Standpipe
3. Establish water supply
4. Determine Fire pump readiness
-First Step in any high-rise water supply is FIND FDC's.
-If they have seperate FDC's(sprinkler/standpipe), supply 1 line to each.

HRTM 17, (1), (2), (3)
4 Ways to Determine System Pressure?
1. CAD (premise hazard section)
2. FDC Sign
3. Nameplate, plus incoming supply pressure.
4. Rule of Thumb:
150 psi upto 10 floors, +5 psi each floor over 10.

Over 225 psi, use threaded 3"
Under 225 psi, stortz will work

HRTM 17, (4), (5)
Tandem Pumping
Use Lobby Control engine (4th) and lay out 5" to a hydrant. Tandem pump maintains 100psi while attack pump maintains FDC required pressure. Operators work to balance rpm's and maintain some type of flow to manage pump temperatures.

HRTM 19, (14-19)