Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
3 Cards in this Set
- Front
- Back
Who assumed the function of Water Supply and what are their starting steps for a Standard FDC Connection?
|
Third Engine
1. Supplementing sprinkler 2. Standpipe 3. Establish water supply 4. Determine Fire pump readiness -First Step in any high-rise water supply is FIND FDC's. -If they have seperate FDC's(sprinkler/standpipe), supply 1 line to each. HRTM 17, (1), (2), (3) |
|
4 Ways to Determine System Pressure?
|
1. CAD (premise hazard section)
2. FDC Sign 3. Nameplate, plus incoming supply pressure. 4. Rule of Thumb: 150 psi upto 10 floors, +5 psi each floor over 10. Over 225 psi, use threaded 3" Under 225 psi, stortz will work HRTM 17, (4), (5) |
|
Tandem Pumping
|
Use Lobby Control engine (4th) and lay out 5" to a hydrant. Tandem pump maintains 100psi while attack pump maintains FDC required pressure. Operators work to balance rpm's and maintain some type of flow to manage pump temperatures.
HRTM 19, (14-19) |