94 Cards in this Set

  • Front
  • Back
write ________ ________ ___ instructions to clarify who does what
subcontract general bid
write ________ _____ _________
subcontract trade instructions
require the subcontractors to submit their bids on a standard __________ _______ _____
subcontractor proposal form
request a _________ form from the subs
pre-qualification
require a ___ ________ form to be submitted
bid breakdown
place a ____ _____ on bid submittals
time limit
subcontract bid instructions- include all costs for:
fees
meters
permits
any wording on the plans, specs, or other bid documents referring to material to be furnished by General contractor, tenant's general contractor, tenants contractor, should be interpreted to mean:

"by __________ responsible for the type of work involved"
subcontractor
guarantee all materials and workmanship for at least _____ from the time of ________
1 year
completion
material / equipment:

where __ ______ is stated, you will be allowed to substitute, providing you are able to prove to the owner or their agent that the selection is of equal quality, capacity, and design to that specified
or equal
who is bound to all labor agreements
subcontractor
by submission of the bid you acknowledge that you are familiar with ___ ____ and should your investigations contradict that then you will not be relieved from _______ the work as shown or required
the site
completing
any proposed substitution must have the approval of
the owner's representative
if allowances are indicated in the specs then should you include them in your bid?
yes, with amount included
material or equipment that has not been paid for is a
pre-ordered item
should you include the cost of pre-ordered items in your bid
yes
should you include the cost of materials furnished by other people
yes
cutting, framing, and patching of all required openings must be done by the
subcontractor
the exception to the cutting, framing, and patching done by the subcontractor is...
drywall contractors must cut and frame all necessary openings in drywall CEILINGS
who is the only person that may perform work that will penetrate the roof
developer's roofing contractor
who is required to clean the premises once a day
subcontractors performing work
if equipment, materials, or supplies are furnished by others, it will be the responsibility of the _________ who installs the items to clean up and dispose of debris
subcontractor
should costs for unloading be included
yes
should costs for excavating necessary to install any under slab mechanical or electrical material be included?
yes
subs are required to attend the ________ meeting to approve the master schedule and attend all _______ meetings
preconstruction
planning
each _________ must submit a material status report _______
subcontractor
monthly
renewal certificates shall be submitted at least __ days prior to ________
4 days
expiration
all subs must file an insurance certificate for comprehensive general liability and automobile liability insurance in the amount specified in the contract docs prior to ________ _____
commencing work
all subs must submit workers compensation guaranteed prior to
commencing work
shop drawings and product data must be submitted to the
general contractor
the subcontract agreement is completed after the signing by the
owner and GC
the subcontract agreement is prepared by the
GC
the subcontract agreement is sent to the
Subcontractor
the subcontract signed agreement between the parties is called the
meeting of the minds
after the contractor has received a owner/contractor agreement, they will notify the subcontractor using a
notice of award
after the signing of the subcontract agreement the sub must submit
insurance certificates
what forms are needed to organize the subcontractors bids (5)
bid instructions
bid breakdown
bid comparison
trade instructions
agreement
the subcontract general bid instructions clarify who
does what
what clarifies who furnishes and or installs specific materials, equipment, fees, and services
subcontract general bid instructions
examples of who does what (what is done)
cleanup
unloading
excavation
demolition
etc.
subcontract general bid instructions or AIA general conditions:

bonds, permits, fees
liscensed to complete work
items furnished by others
labor agreements
cleanup
unloading
proposal form
subcontract general bid instructions
subcontract general bid instructions or AIA general conditions:

party responsibilities
claims procedures
change procedures
safety procedures
submittal procedures
termination procedures
AIA
subcontract bid breakdown and proposal form:

price breakdown by systems or
location
subcontract bid breakdown and proposal form:

total price in
numbers and written
subcontract bid breakdown and proposal form:

prevailing wages table by ______ and ____
county and date
subcontractor agreement parties
contractor
subcontractor
owner
A/E
subcontract agreement:

stated name and document along with how many criteria?
4
subcontract agreement:

scope description- addresses how many content areas
5
general bid inclusions
specific trade activities
systems or locations
complete and operational
accepted by the owner

these are the what
5 content areas
CRSI, ACI, NEC, ASTM, OSHA, must be contained in the
subcontractor agreement
procurement process:

prepare _____ list
want
procurement process:

request ____ _________
price quotations
procurement process:

write _____ ____
purchase order
procurement process:

_______ materials
expedite
procurement process:

_______ shipment of materials
arrange
procurement process:

check ______ list
packing
the want list is sent from the _______ ________ to ________
construction dept
purchasing
the request for price quotations is from the ________
contractor
the purchase order is from the _______ to the _______
contractor
vendor
who expedites the materials
contractors purchasing dept
"arrange shipment of materials" is from the _______ to the _______
vendor
jobsite
"check packing list" is from
contractors field personnel
the billing document from the supplier requesting payment for materials
invoice
the vendor is only responsible for loading the order on the shippers vehicle at the factory (shipping term)
FOB factory
means that the vendor is responsible for loading your order on the shipper's vehicle at the sales location and ownership transfers from the supplier to the buyer at the sales location (shipping term)
FOB suppliers sales
the shipping document is known as
bill of lading
contractual agreement between the shipper and a common carrier to move the material from location A to location B for a specified price (shipping term)
bill of lading
if the shipping terms are FOB factory, the bill of lading is between the common carrier and the
buyer
if the shipping terms are FOB jobsite, the bill of lading is between the common carrier and the
supplier
CIF
cost plus insurance and freight
shipping term COD
cost on delivery
accounting term ROG
receipt of goods
accounting term:

this means that a 1% discount can be deducted from the purchase order amount if the contractor pays within 10 days or receipt of goods ROG. The full payment is due in 30 days
1/10 NET 30
accounting term:

this means a 1% discount can be deducted from the purchase order amount if the contractor pays before the eleventh of the month following receipt of goods (ROG). The full payment is due thereafter
1/10 EOM
EOM
eleventh of the month
accounting term:

this means a 1% discount can be deducted if payment is made within 10 days of the invoice date. The full payment is due in 30 days
1/10 PROX 30
accounting term:

_______ receives the original to confirm the order prices, quantities and terms
vendor
accounting term:

________ ______ keeps a copy for reference and purchase order numbers used
purchasing agent
accounting term:

________ will receive a copy if they had requested materials using a purchase requisition. The purchase order would be sent to confirm the orders had been placed
originator
accounting term:

accounts payable will receive a copy to compare quantities, items and unit prices with the invoice before making payment
accounting
accounting term:

________ will receive a copy to compare the quantities and items shipped
receiving
accounting term:

________ receives a copy for following up orders to ensure that the correct documentation and materials arrive according to the scheduled delivery dates
expediting
purchase order or purchase order change?

0921
purchase order
purchase order or purchase order change?

0921-04
purchase order change
the process of following up on materials and vendor submittals to ensure that the proper materials and quantities are in compliance with the specifications and they arrive as scheduled. The person performing this function is sometimes called an expiditor.
expediting materials
the amount of time required by vendors to deliver materials to the jobsite. When determining the amount of time required to deliver materials, the following steps must be reviewed to determine the amount of ________ required for an item
leadtime
a want list is also called a
purchase requisition
requisitions are used for
controlling materials internally
what law does a purchase order fall under
Uniform commercial code
UCC
uniform commercial code
the process of following up on materials and submittals
expediting
FOB factory - ________ responsibility after loaded at factory
contractors
FOB sales office - _________ responsibility after loaded at retailers
contractors
FOB jobsite - _______ responsibility until after unloaded at site
vendors