8 Cards in this Set

  • Front
  • Back
the overlapping accomplishment of Design, Procurement, and Construction activities to complete a project faster
fast tracking
the shortening of the project schedule along the critical path using the activities on the critical path with the least cost. No activity can be crashed to a zero duration
crashing
the shifting of activities within the schedule using the free floats times available
resource leveling
the total amount of time required to receive approved materials on the jobsite
leadtime
lead time report consists of: (3)
bid time
prepared shop drawings on time
shipment
the time required by the vendor to prepare inquiry and mail bid
bid time
the time required after receipt of contract to prepare and mail shop drawings
prepare shop drawings time
the time from receipt of complete drawing approvals plus the time needed to fabricate the item
shipment