Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
6 Cards in this Set
- Front
- Back
Measures cost per unit after completion of job |
Job order costing system |
|
Measures unit cost at the end of a period |
Process costing system |
|
The number of units that could have been started and completed given the cost incurred during a period |
Equivalent unit of production |
|
Combines units and costs across two periods in computing equipment units |
Weighted average method |
|
An important managerial accounting report for a process costing system |
Process cost summary |
|
The rate use to apply factory overhead cost to the goods manufactured. |
Predetermined factory overhead rate |