Study your flashcards anywhere!

Download the official Cram app for free >

  • Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

How to study your flashcards.

Right/Left arrow keys: Navigate between flashcards.right arrow keyleft arrow key

Up/Down arrow keys: Flip the card between the front and back.down keyup key

H key: Show hint (3rd side).h key

A key: Read text to speech.a key

image

Play button

image

Play button

image

Progress

1/5

Click to flip

5 Cards in this Set

  • Front
  • Back
Acceptance Criteria
Those criteria, including performance requirements ans essential conditions, which must be met before project deliverables are accepted.
Acquire Project Team
THe process of obtaining the human resources needed to complete the project.
Activity Attributes [Output/Input]
Multiple attributes associated with each schedule activity that can be included within the activity list. Activity attributes include activity codes, predecessor activities, successor activities, logical relationships, leads and lags, resource requirements, imposed dates, constraints and assumptions.
Activity Code
One or more numerical or text values that identify characteristics of the work or in some way catagorize the schedule activity that allows filtering and ordering of activities within some reports.
Activity Description (AD)
A