• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/30

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

30 Cards in this Set

  • Front
  • Back
Whose responsibility is it to revoke SE Operator's License when unsafe operator habits or behavioral traits are reported?
The Maintenance Officer
What form is used to document a pre-operational inspection and how long is it kept?
4790/52 and 30 Days.
What are the two basic functions of the A/M42M-2A light cart?

Provides portable light for night time

operation and portable auxiliary electric power at any time.

(True or False) You are authorized to tow the light cart with the light mast raised?
False.

What is the pre-operational checklist for the light cart?

NA 19-600-301-6-1 A/M42A-2A

During operation of the portable floodlight, what is the safe working distance to prevent personal injury and/or damage to equipment?
Ten Feet
How should you position the light cart with respect to the aircraft it is used on?

Park the unit so that if it moves inadvertently, it won't hit the aircraft.

The light cart tow bar is stowed in what position?

Latched and locked.

What type of lights are used in the A/M42M-2A light cart assembly?
Metal Halide, Quartz Incandescent.
(True of False) The floodlights can be removed from the portable A/M42M-2A unit.
True.
What type of engine does the A/M42M-2 light cart have?
Diesel Engine.
The portable flood light cart's tires are properly inflated at ______ .
45 PSI
(True of False) PPE is required to perform the A/M42M-2A pre-operational inspection.
True.
(True or False) Pre-operational checklist maintenance requirements shall be accomplished prior to the first operation of the day/or prior to each use.?
True.
When performing a pre-operational inspection, what is checked on instruments and light lamps?
This is not something checked on a pre-operational inspection.
What type of oil is used in the engine of the portable floodlight?
MIL-L-2104.
After using lamps and prior to stowing them in the brackets, you must allow the lamps to ________ _________to prevent any injury to personnel.
Cool Down.
The A/M42M-2A should never operate the _____ in an enclosed space.

Engine/Generator

(True of False) The Mast on the A/M42M-2A may be extended or rotated when necessary.
True.
How many people are required for the installation of the floodlight?
Two
Preoperational inspections must be documented on what form______
OPNAV FORM 4790/52
What should be considered when selecting the level of preservation for SE?
Physical Condition, Disposition, and Length of time to be inactive.
(True or False) Preoperational checklist maintenance requirement shall be accomplished on any S.E. gear prior to the first operation of the day and/or before each use.
TRUE
How long should 4790/52 cards be retained for?
30 Days
What publication is the S.E. Basic Handling and Safety Manual
NA 00-80T-96
In what publication would you find S.E. Cleaning, Preservation, Corrosion Control
NA 17-1-125
Whose responsibility is it to revoke SE Operator's License when unsafe operator habits or behavioral traits are reported?
The Maintenance Officer
In what publication can you find the Startup procedures for the A/M42M-2A light cart?
NA 19-10-505 WP 005 00, PG 6.8
What is the NAVAIR 19-600-301-6-2?
Periodic Maintenance Requirements Checklist for the Light Cart
Who is the S.E. Training Licensing Program Manager
Assistant Maintenance Officer