Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
20 Cards in this Set
- Front
- Back
What is the definition of product scope? |
The requirements related to the product of the project |
|
What is the definition of project scope? |
The work the project will do to deliver the product of the project |
|
What is the process of scope management? |
Plan Scope Management |
|
What is the definition of scope management? |
Defining what work is required and then making sure all of that work, and only that work, is included in the project |
|
What are the key outputs of the Plan Scope Management process? |
Scope management plan |
|
What are the key outputs of the Collect Requirements process? |
Requirements documentation |
|
What is the key output of the Define Scope process? |
Project scope statement |
|
What are the key outputs of the Create WBS process? |
Work breakdown structure (WBS) |
|
What are the key outputs of the Validate Scope process? |
Work performance information |
|
What are the key outputs of the Control Scope process? |
Work performance information |
|
Name several requirements-gathering techniques |
Reviewing historical records |
|
What is the value of a requirements traceability matrix? |
Helps link requirements to objectives |
|
What is a project scope statement? |
A description of the project deliverables and the work required to create those deliverables |
|
Product analysis is part of which scope management process? |
Define Scope |
|
When is a work breakdown structure (WBS) created, and what is it used for? |
Created during project planning by the team and used to define or decompose the project into smaller, more manageable pieces
|
|
What is decomposition? |
Subdividing the major deliverables into smaller, more manageable components |
|
What is a WBS dictionary? |
A description of the work to be done for each work package |
|
How are work packages different from activities? |
Activities are generated from each work package |
|
What is the Validate Scope process? |
The process of gaining formal acceptance
|
|
What makes up the scope baseline? |
Project scope statement
WBS
|