• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/100

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

100 Cards in this Set

  • Front
  • Back
What is the single source for Air Force planning and support of combat forces in a time of
war?
Air Force War and Mobilization Plan, Volume 1=0
What team is the first to arrive at a deployed location?
Advance echelon (ADVON).
The first aircraft squadron arrives at a bare base as a part of the
initial Force.e}
During a contingency, what gives you a break down of all material that must be moved to the
forward location??
Unit type code (UTC).±
Which document lists all deployment tasking requirements for a particular contingency,
exercise, or deployment?
Deployment requirements manning document (DRMD).
What personnel system is used to generate a departure report?4{A
Manpower and Personnel Module – Base Level (MANPER–B)
What product is used by deployed commanders to identify deficiencies in unit type code
(UTC) capabilities?ment?
Processing discrepancy report.
Specific unit type codes (UTC) that are normally eligible for deployment given a certain set
of deployment conditions and assuming full readiness are considered
available to deploy.ON).
Where is unit type code (UTC) substitution rules outlined?0d74a2
AFI 10–403, Deployment Planning and Execution
How many engineering and operations equipment/vehicle unit type codes (UTC) are there?ge
14
How many members are on an engineer augmentation team?n?
1-6
Which product summarizes a unit’s wartime tasks and requirements?
Designed operational capability (DOC) statement
Who ensures all Prime BEEF team members are organized, trained, and equipped to
perform their contingency roles and all equipment is on-hand and ready to deploy?
Prime BEEF manager
The status of resource and training system (SORTS) is?n?
automated reporting system that function as the central registry of all operational units for the
armed forces and certain foreign organizations
The degree to which a unit meets standards within the three measured resource areas and an
overall unit assessment is indicated by a five-point scale calleded?
C-levels
When must a Prime BEEF courier carry an authorization letter that identifies the individual
and describes the cargo they are escorting?
The cargo is classified.
Which document consolidates Prime BEEF equipment and supply requirements?mage/gi
Equipment and supplies listing (ESL).
Which deployment database contains the logistics details of each unit type code (UTC) and
provides model load and packing lists for each cargo increment/pallet?
Logistics force (LOGFOR
Which mobility bag contains extreme cold weather equipment?d74a2
B
What factor is the most important to reduce confusion when building pallets for an exercise
or actual deployment?=
Practice
Where are cargo container keys kept?"5pÇ
With the cargoe
What is not considered war reserve material (WRM)? is?n?
Subsistence items
Who is the functional expert for their respective area and is essential to the WRM program?
war?
Unit war reserve material (WRM) managers
What kind of order does the Secretary of Defense (SecDef) approve and transmit to the
supported commander and Joint Planning and Execution Community (JPEC) announcing the
selected course of action (COA)?
Alert.6
Which logistics module (LOGMOD) report, created through the Schedule module, shows
suffix items within an item assigned to an increment?
Packing list.ue}
Where is cargo weighed, measured, and the cargo documentation validated?
Personnel deployment function (PDFnagers
Who is notified immediately when cargo becomes frustrated?
Deployment control center (DCC).
What are all the Air Force incident management system (AFIMS) phases of incident
management?
Prevention, preparedness, response, recovery and mitigation&?B‚¿
What type of command would be established if off base agencies responded on base??ts=0
Unified command}
What type of command would be established if multiple incident commanders are managing
several incidents across the installation??
Area command.nd}
What are the primary special staff positions within the incident commanders staff (ICS)?
Public information officer, safety officer, and liaison officer2
What positions comprise the incident commander’s staff (ICS) general staff?eas??
Operations, logistics, planning, and finance and administration section chiefs.i
What three functions support the incident control center (ICC) command and control
structure?.
CAT, EOC, and UCCs
What communication centers make up the emergency communication center (ECC)?as??
Fire, security force, and medical dispatch centers.ts=0?
The emergency operations center (EOC) is comprised of how many emergency support
functions (ESF)??ts=00
15
Checkpoints are defined when creating checklists toith
enable anyone with the ability to follow through the checklist.2
What step in creating a checklist identifies the main categories?
Classify and sort the checkpoints
What is the primary means of communication when contacting personnel on leave???
Telephone.:true}
What must be emphasized when preparing comm-out procedures?d74a2
Early notification of key personnel.
Who commands CEs unit control center (UCC)?int?.
Base civil engineer.FOR
Who is responsible for periodically inventorying unit control center (UCC) equipment and
supplies?ts=00
Operations management apprentice.el.
Who establishes and maintains the events log?t?.
Operations managers.FOR
What sequence is involved when updating unit control center (UCC) status boards?
Update the events log, record the damage on a status board, and report the information to the
emergency operations center (EOC).
What information is included on a damage status board?
Work priorityue}
When changes are made to the status boards, you are required to report them to the(ICS)?
emergency operations center (EOC).l.
Who dispatches and monitors the progress of airfield damage repair (ADR) teams??
Unit control center (UCC).u
How is airfield damage repair (ADR) status reported to make it difficult for the enemy to
determine what is going on?e?
Using checklist itemsOR
How are the craftsmen dispatched to perform expedient repairs?a2
By work priority
Who normally coordinates contingency operation support with appropriate agencies?e(ICS)?
The emergency operations center
Normally, when are situation reports (SITREPS) due?rd?
At shift change}
What should be eliminated from situation reports (SITREP)?0d74a2
Unwanted or frivolous information.l.
How is a situation report (SITREP) used?
Make decisionse}
What bare base priority tasking deals with preparing petroleum oil and lubricants (POL)
sites?
3
Which publication provides a list of Civil Engineer (CE) team structures?
AFPAM 10–219, Vol. 5, attachment 19.
Which publication provides a list of labor hour estimates by Air Force specialty (AFS) for
common beddown tasks?g on?e?
AFPAM 10–219, Vol. 5, attachment 20.
How many hours should your daily schedule cover when performing force beddown??
24
What can be produced from the final base engineer survey toolkit (BEST) product?
Tent city map
Which GEO program helps deployment planners to make “GO or NO GO” decisions?uct?
Contingency aircraft parking planner (CAPP).R
What is the first thing you must do when you prepare to erect a TEMPER tent?uct?
Select a site.e}
What is assembled first on the tent extendible modular personnel (TEMPER) tent?
Tent frame.
How many frame sections must be assembled before the tent fabric is ready to be installed?ites?
Five.)6
What should you do to keep the tent sidewalls from being caught in the frame joints when
raising the tent sides?g on?e?
Roll the sidewalls up.d.
How many people does it take to pull the cover of the small shelter system (SSS) up over
the frame?s=00
Four.)6
Guy ropes are installed on the small shelter system (SSS) if wind conditions are overly.
40 miles per hour
Whose responsibility is it to track the status and whereabouts of every civil engineer?.
Operations managers
Which deployed personnel accountability tool provides a list of people and the teams they
are assigned to?
Duty rostertrue}
Which deployed personnel accountability tool can be used to recall key personnel?ineer?.
Standby rostere}
Along with the primary deployed property custodian, at least how many alternate property
custodians must be designated?
Oneˆ)6
What action should take place once an unexploded ordinance (UXO) has been found?
Marked and reported to the proper authority
What are the dimensions for a minimum operating strip for fighter aircraft?ound?
50’ by 5000true}
The two damage reference systems commonly used in the Air Force are the Crash Grid
System and thee?s=00
pavement reference marking system
What plotting symbol symbolizes a crater
A circle
The four types of decontamination are immediate, operational, thorough, and
reconstitutione}
How many mission-oriented protective postures (MOPP) levels are there?=0
5
What work method is geared toward making a building safe for occupancy and providing
minimal protection from elements
Expedient repair.
What method of expedient repair provides structural integrity to weakened areas?
Shoring
What method of expedient repair is used to protect people or equipment from the elements??ites?
Patching.":true}
What publication deals with the restoration of water systems?4a2
AFPAM 10–219, Vol. 3.OR
Normally, silikal polymer is used forter
spall repair.ue}
Who is the land mobile radio (LMR) focal point?.
Unit net manager.
What kind of radio frequency propagates more easily via sky and direct wave because
obstacles easily absorb them?erate?
Higher frequency wavesR
Where would you normally receive radio frequencies from when deployed overseas??
Host nationtrue}
What does “Message Follows” refer to in land mobile radio (LMR) common statements?ts=0
Prepare for a long message.
To navigate to a location using a global positioning system (GPS) unit, what must the user
enter into the GPS?
A waypointntrue}
How many sets of batteries does the defense advance global positioning system receiver
(DAGR) require to fully operate?
2
What type of real-time map formats does the GeoXT utilize?0d74a2
Raster and vector
What methods can you use to update the emergency operations center (EOC) on base
recovery actions?ts=00
Telephone, messenger, or computer
In which phase of bare base employment are water points established?ts=0
Beddown.
Who should be informed of deployed contract needs?with
Contingency contracting officer (CCO).
Which functional areas are usually delegated SF Form 44 authority?
CE and transportation.R
When should the customer complaint method of contract surveillance be used?PWS)?
Whenever nonconformance can be validated by customer complaints2
Who conducts quality assurance evaluator (QAE) Phase I training?
AETC mobile instructord.
Statements of work must be prepared in accordance with
AF Instruction 63ƒ{124, Performance-Based Services Acquisition.2
When performing job analysis for a statement of work, why is it important to keep
directives to a minimum?=00?
The Air Force is only concerned with the results of the service.
Who can make changes to the terms of an active performance work statement (PWS)?
Contracting officer.ord.
Who is responsible for funding US civilian employees evacuated or relocated during
emergency conditions?ts=00?
Losing command.}
What is used to maintain balances for AF Form 4009s during a contingency?
Manual spreadsheets.ord.
What must an SF 1449, Solicitation/Contract/Order for Commercial Items have in the
“Ordered By” block before it can be certified?0
Contracting representative’s original signature.
What is provided by an after action report?ture.
Final results.e}
Which function of contingency recovery involves making a list of broken, damaged, or
missing parts?
Re-palletizing.}