• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/5

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

5 Cards in this Set

  • Front
  • Back
1. What are the 3 methods of accomplishment of work orders and give a brief description of each?
*In-House: a work order accomplshed by using our CE rescources (labor, material and equipment) MOST COMMON TYPE of work order.
*Contract: work orders that are accomplished by provate business, corporations, and firms NOT associated with the government. (ex. constructing new roads, constructing new buildings, and providing custodial services.)
*Self-Help: work orders that enable an organization to use its own manpower to accomlish their own CE type work requirements. They can sometimes use their own donated materials, as long as CE approves them. NO SELF HELP DSWs
*
2. List the different work order indicators and give a brief description of each In-House Work Order.
*In-service(A): work order is authorized with AFF 327 and is accomplished with CE resources (manpower, materials)
*Direct Scheduled Work(J): Work accomlished with CE resources, requiring little to no planning.
*Other In-Service(W): work accomplished with CE manpower chargeable to Air Force Account Codes 49000-other services, 60000-Demolition of real property, any 10XXX AF account code. (doesnt include maintenance, repair or minor construction)
*In-House/Contract(X): this indicator is used to show that a work order is accomplished with both in-house and contract support, including service contract.
3. List the different work order indicators and give a brief description of each CWON.
Material Only(M): Used to accumulate material only costs. This can be for a single purchase or for multiple over-the-counter issues at the self-help store. (no labor charged to this work order)
*Plant Operations, Services, and RWP(O): These collection work orders are used to collect costs associated with plant operations, and services i.e entemology and the recurring work program (RWP) (main one i wil use in a recurring work program)
*Purchase Utilities(U): Used to accumulate the cost of purchasing fuel, power, water, etc or the cost of a contractor providing the utility.((no labor))
4. List the different work order indicators and give a brief description of each Contract.
Contract Project(C): this type of woirk order applies to all maintenance, repair and construction accomplished by contract without any CE support(straight contract, no CE)
*Rental Contract(R): Use to identify rental of real property or equipments(we dont have the equip on base)
*Services Contract(S): Used to identify services contract i.e electric motor rewinding contract or waste disposal contract
5. What is the work order indicator for a Self-Help work order?
"Y"