• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/19

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

19 Cards in this Set

  • Front
  • Back

What is the NCF instruction for 3M?

COMNECC 4790.1B

Who has overall responsibility for the 3M program?

Co

Who is the 3M manager?

Xo

What is the PB4M?

Planning boards for maintenance. It provides the CEO and XO critical information on the readiness of a units equipment and overall management of the 3M system

Who is the chair for the PB4M?

Xo

Who is required to participate in the PB4M meeting?

Maintenance managers, department heads, 3MC.

Who is the functional manager of the 3M system for a command?

3MC

What nec should a 3MC have?

9517

How often should 3MC conduct an automated shore interface or ASI?

Every 10 to 14 days or when the record count exceeds 2000

True or false


SKED database should be backed up monthly to an external hard drive or equivalent external device to allow a command to completely restore their files?

True

What is the timeframe that 3MC has to screen and forward all approved TFBR following a department head approval?

Within 4 working days

What qualification for a PQS must a 3MA have?

305

A department head or detachment officer in charge must ensure what personnel are fully qualified for assigned positions?

Department three and air, division officer/leading chief petty officer, workcenter supervisor, and maintenance personnel

The department head/detachment officer in charge must review and give recommendation on TFBR within___days of submission

4

What personnel are required to do a 3 AM self-assessment?

3MC, Dept head, (divo and LCPO assist the Dept head)

What are line outs applied to?

MIPS, LOEPs, and procedural steps

Who prepares line outs for the DIVO/LCPO approval?

Work center supervisor

Who monitors the workcenter personnel on the completion of planned and correct of maintenance?

Workcenter supervisor

What SKED version are we currently in?

3.2