• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/72

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

72 Cards in this Set

  • Front
  • Back
The equipment inventory reporting system justifies and defends the program, budget, and...
USAF plan.
Errors in inventory reporting can result in the loss of...
Supplies, manpower authorizations, and funding.
Under the inventory reporting concept, all aerospace vehicles in the Air Force must be accounted for as long as they are assigned and possessed by the Air Force,...
ANG or AF reserve unit.
What type of reporting is the distribution or allocation of aerospace vehicles by HQ USAF and MAJCOMs to AF installations based on the mission of the command?
Assignment reporting.
Who assigns and distributes aerospace vehicles throughout the Air Force?
HQ USAF.
Who handles the distribution of aerospace vehicles within a command?
MAJCOM AVDO.
What concept of AFI 21-103 reporting is based on exception reporting?
Status.
What data is considered the number of sorties/hours flown, and the types of missions that are being flown?
Utilization.
Unless otherwise reported, the status of all aircraft is considered to be...
FMC.
Which maintenance status code is used when an aircraft cannot fly due to uncleared maintenance and supply conditions?
NMCB.
What maintenance status code indicates an aircraft is capable of flying at least one but not all of its assigned missions?
PMC.
Who is responsible for the AVUM function?
Aviation resource manager.
In order to generate reconciliation reports, who is responsible to provide reports to the AVUM and AVDO daily?
MDSA.
Which MAJCOM becomes the initial possessing activity for new production aircraft?
AFMC.
When field teams are performing depot-level maintenance or modifications, who gains possession?
AFMC.
Do not schedule aircraft for PDM that are programmed to be dropped from the active inventory within how many years?
2.
What function is responsible for the coordination of AFTO Form 103 with the MOF PS&D and QA before the form is submitted to the MAJCOM.
Unit AVDO.
The AFTO Form 103 will be initiated how many days in advance of the scheduled depot date to allow for command review and certification.
55.
What routine is used to load the basic equipment identification information for part and serial numbered items?
SEL.
Which routine would you use to report status updates, maintain inventory history, and update status history for unit assigned equipment.
STU.
Which routine provides information concerning the status of assigned equipment?
EST.
Depending on the input format used, which routine provides a list of all equipment assigned to the unit, or work center, which is loaded for a specific equipment designator, specific part number, or all part numbers?
ERP.
What is a maintenance scheduler's main concern when dealing with the annual operational contract?
The capability of maintenance to support the contract.
During the development of the annual operational contract, who provides the unit with historical data from the previous flying months?
MDSA.
During the operational and maintenance planning cycle, quarterly planning begins with the...
quarterly allocation of flying hours.
As a minimum, the long-range plan shows the known maintenance requirements for the...
current month and next two months.
Scheduling forecasts and monitors the quarterly plan on an AF form...
2401.
When should additional requirements such as TCTO programs, PDM schedules, and scheduled inspections be added to the quarterly plan?
As requirements are received.
The monthly maintenance planning schedule will include will include all known "operational" events, such as...
Exercises, deployments, and surges.
When will the operations officer provide AMU supervision and PS&D with the estimated operational needs for the following month?
NLT the first weekly scheduling meeting.
NLT the third weekly scheduling meeting with the OG and MXG commanders, next month's plan must be finished prior to presenting it to the...
Wing commander.
A maintenance scheduler must be aware of the basic requirements necessary to support the flying schedule in order to...
Properly predict scheduled and unscheduled maintenance.
To allow for attrition, the maintenance scheduler overschedules the contracted sorties by the number of sorties indicated by the...
attrition factor.
How many days prior to the beginning of the effective month must the monthly maintenance plan be distributed if published?
5.
The purpose of the weekly utilization and maintenance plan is to...
refine the monthly maintenance plan and provide additional details to it.
Once published, the weekly schedule...
provides the final planning guide for maintenance and operations.
All weekly schedules should be developed to conform as closely as possible to the current...
monthly maintenance plan.
What staff agency is responsible for compiling the data to be incorporated in the weekly maintenance plan?
Scheduling (PS&D).
As early in the week as possible, but NLT two workdays before the weekly meeting, the OS operations officer gives the proposed schedule for the coming week to the...
AMU supervision.
Who measures each organization on its flying and maintenance scheduling effectiveness?
MAJCOM.
The OS operations officer and AMU supervision will review and coordinate the proposed weekly flying and maintenance schedule with OS, AMXS, and MXS prior to presenting it to the...
Operations and Maintenance Group Commanders.
After the group commanders approve the weekly schedule, it will be submitted to...
the MOF PS&D for completion.
Once the weekly schedule is reviewed and signed by the OG, MXG, and WG commander, it becomes the final planning guide for both...
Operations and maintenance.
When the weekly schedule is finalized and distributed, who develops specific procedures to record and coordinate changes to the printed weekly schedule?
MAJCOM.
Daily maintenance planning is necessary to...
incorporate unscheduled maintenance requirements into the daily portion of the weekly maintenance plan.
Who chooses the debriefing option your unit will use?
The MAJCOM.
A ground deviation is an event that occurs...
before aircraft takeoff.
An air deviation is an event that occurs...
after aircraft takeoff.
An airborne aircraft that cannot complete it primary or alternate mission is...
an air abort.
Who determines specific procedures to record and coordinate changes to the printed weekly schedule?
MAJCOM.
Who initiates the AF Form 2407?
The requesting agency.
Which means of communication is the most convenient and fastest for coordinating maintenance requirements?
Telephone.
Which AF form sequences required maintenance actions against a specific line number?
2409.
What management step is necessary to build a generation maintenance flow plan?
Coordination.
When a generation is finished, who will attend a post exercise/contingency "hot wash" meeting to evaluate flow plans for changes or improvements?
PS&D.
What does a UTC package normally represent?
Both personnel and equipment.
What is the last digit of a standard that is a HQ USAF - approved and distributed UTC?
0.
What IMDS routine loads codes to depict the intent, purpose, or function of a specific mission or exercise?
AUC table.
Which IMDS routine would you use to load the flying schedule for the following week?
OEL.
What IMDS routine is used to update, correct, reactivate, or delete the equipment's utilization?
OUU.
What IMDS routine lists all scheduled events for an equipment ID and gives a flying hour history report?
SAE.
Which IMDS background program displays scheduled events for each equipment ID in a weekly or a monthly plan format?
PMP.
Which IMDS program recaps operational performance of assigned aircraft?
AUR.
Additional areas to be included in local tracking of maintenance scheduling effectiveness (MSE) such as AGE and AME may be authorized by the...
MXG/CC.
A malfunction or deficiency on an aircraft or a piece of equipment that can't be corrected within a reasonable time after discovery due to non-availability of parts, manpower, facilities, or equipment is what type of discrepancy?
Docmented.
What are the two separate and distinct documented discrepancy files?
Awaiting maintenance / awaiting parts.
Who is responsible for COMSEC and OPSEC?
Everyone in the Air Force.
The two forms of security that are specifically related to our jobs as schedulers are...
communications and operations.
What classification designation is applied only to information or material for which unauthorized disclosure could reasonably be expected to cause serious damage to the national security?
Secret.
What classification designation is applied only to information or material for which unauthorized disclosure could reasonably be expected to cause damage to the national security?
Confidential.
The goal of COMSEC in the USAF is to ensure the security of...
telecommunications.
What is considered one of the weekest communications links in the United States?
Telephone system.