• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/15

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

15 Cards in this Set

  • Front
  • Back

Who can activates warble tone and 10 second tone for RIC/Mayday activation

IC


Fire Dispatch Supervisor


Fire Dispatcher


ECDC BC

What is announced over command and tactical channel when there is RIC/Mayday activation?

ECDC announces: “Clear the channel for emergency traffic”

What does ECDC say when they become aware of a “Cover Now”?

“Keep radio traffic to a minimum” , followed by 10 second tone.

Who initiates 10 second time for “Cover Now”?

IC


ECDC BC


Fire Dispatch Supervisor

What tones are initiated for a “Life Hazard”

3 short beeps followed by announcement of the hazard


Initiated by IC, ECDC BC, fire Dispatch Supervisor

What tones does dispatch use to cancel units

2 short beeps

What is the purpose of the Warble and 10 second tone?

Distinctive tones intended to alert personnel to an emergency and to remind all to maintain strict radio discipline

Who does ECDC notify for home unit inspection?

Battalion 36


Logistics BC


Heavy Fleet supervisor

What hours do you return loaner equipment(SCBA, radio, medical aid equipment)

Between 0700-1600 hours

What number needs to be included in PSTrax if apparatus sustained damage related to an incident?

Include the “S” number

What hours are home unit inspections completed? And how long do they take?

Completed between 0600-2000


Lasts 1-2 hours

What happens with light vehicles upon return?

Remains in service unless OOS criteria is met


B36 arranges home unit inspection

What happens when Type 3 return from strike team?

Remain in service unless OOS criteria discovered during demobilization inspection

What happens when Type 1 returns from Strike Team?

Apparatus placed OOS, until home unit inspection is complete.


Backfill crew remains available until unit inspection is complete

When is home unit inspection completed if returning after 1600 hours?

Home unit inspection is done the next day