• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/20

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

20 Cards in this Set

  • Front
  • Back

Types of prints

Plan, elevation, and section

Diameter symbol

Back (Definition)

B. C.

Bolt circle

N.S. & F.S.

Near side and far side

T.O.C.

Top of concrete

Front (Term)

Section line

Prints drawn by outside vendors are known as ?

Foreign Prints

How are rebar sizes expressed

In 1/8” increments

Do wiring diagrams show front or rear view?

Rear view?

How do you mark removals on a print?

Series of X’s over the wire and then shaded red

What are the two most common shapes for anchor bolts?

L & J

When are bell footings used?

When soil conditions do not provide sufficient support

Concrete formula

Length x width x depth (in feet)


———————————————


27

What other types of concrete joints?

Construction joints, control joints, isolation joints, and expansion joints

How long for concrete to reach full strength?

28 days

How are wire additions to a print marked?

Wires drawn in black pen and then shaded blue

What is a slump test used for?

To measure consistency of concrete

What is concrete composed of?

Fine aggregate, coarse aggregate, cement, and water

What is used to change direction of a pull, tigger, etc.?

Snatch block

What is your benchmark?

A permanent Reference point used for elevation