• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/40

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

40 Cards in this Set

  • Front
  • Back

Items developed in Plan Phase of Task- Based Curriculum Development

Training Project Plan

Item developed in Analyze Phase

Duties, tasks and/or skills needed for training are organized in the Course Training Task List (CTTL) which is the output of the Analyze Phase.

Items developed in the Design Phase

Training Course Control Document (TCCD) is made up of :


1. Front Matter


2. Curriculum Outline of Instruction


3. Annexes

6 Phases of the Task Based Curriculum Development (PADDIE)

1. Plan


2. Analyze


3. Design


4. Develop


5. Implement


6. Evaluate

Items developed in the Development Phase

Curriculum Materials:


1. Lesson Plan


2. Trainee Guide


3. Test Items


4. Instructional Media Material

Purpose of Implementation Phase

Resolve any discrepancies identified in the pilot course and implement the course

Purpose of the Evaluate Phase

Internal assessment of training methods, materials and external feedback from fleet

What is a Letter of Promulgation

Approves Navy materials for use in support of Navy Training.


What is Training Objective Statemnt (TOS)

They describe skills and knowledge to be learned by the individual.

What is Training Level Assignments(TLAs)

Lists specific PPP line items to be taught, where they will be taught and the level of training for each line item.

Table Assignment Matrix (TAM)

Summarizes training requirements for PPP tables listed on the Training Path Chart (TPC)

What is a Training Path Chart

Graph that that shows training path for category of people by listing course in its path.

What a Training Objective Statement (TOS) Code

Letter or number identifier placed by each TOS which can be used as a shorthand method of referring to each TOS.

Skill TOS Codes

1. TO/S: Skill (Background)


2.TO/ J: Skill (Task/Function)


3. O: Operation


4. P:Preventative Maintenance


5. C: Corrective Maintenance


6. M: Maintenance

TOS Codes for Knowledge

1. F: Familiarization


2. T: Theory


Three Task Sets

1. Coordinator: who has overall authority (CO/ XO, system manager)


2. Director: Direct Supervisor (DH, DIVO, LPO)


3. Performer: one who does hands on work. ( Tech/ Operator)

Types of Course in the Training Path Chart

1.Background Training


2. Replacement Training


3. Advanced Training


4. Conversion Training


5. On board Training

When does Job Sheet Development begin

As soon as Training Path System (TPS) is done, this makes sure that skills drive, or force content of curriculum.

What triggers the process to convert a PPP based development to a Task Based development

Revision or outdated system in a course where only training needs to be on knowledge or task Based.

Three types of training materials provided by Integrated Learning Environment (ILE)

1. Instructor Led Training


2. Interactive Multimedia Instruction (IMI)


3. Blended

Seven Phases to develop a course with ILE

PADDIE plus Life Cycle Maintenance

What is the outcome for the Instructional Media Design Package (IMDP)

Detail and demonstrate the design for a courses modules and lessons.

Three Variations of Course Hierarchy developed with ILE

1. Instructor Led Training


2. IMI Module NeL- LMS delivered


3. ILT Lesson IMI Module NeL-LMS delivered

Purpose of of Instructional Media Materials(IMM)

Present a body of info and are largely self supporting.

Minimum sections of a Lesson Plan

1. Front Matter


2. Lesson Topics

Minimum sections of a trainee guide

1. Front Matter


2. Instruction Sheets

Purpose of a Course Task Training List (CTTL)

Lists duties and tasks for a course, sources for the duties and tasks and associated KSATR. It is also used to develop LOs during Design Phase.

What is KSATR

1. Knowledge


2. Skills


3. Abilities


4. Tools


5. Resources

What does a CTTL give a curriculum developer?

CTTLs are used to develop LOs, Instructional Strategies, techniques and methodologies.

Purpose of Testing

It's a primary tool for determining trainee attainment of the Training Objectives/Enabling Objectives.

Purpose of a Pilot Course

Validates a curriculum and it's supporting materials.

7 Personnel Performance Profile(PPP) Based devopment

1. Planning


2. STAGE ONE


3. STAGE TWO


4. STAGE THREE


5. STAGE FOUR


6. STAGE FIVE


7. Evaluation

PPP PLANNING PHASE

Identifies resource requirement and developmental sequence of events

PPP STAGE ONE

Determines job tasks, supporting skills and knowledge amd level of performance

PPP STAGE TWO

Determines skills and knowledge being taught and produces Learning Objectives

PPP STAGE THREE

Produces instructional materials

PPP STAGE FOUR

CCA approves course for pilot and submits Pilot Course Monitoring Report

PPP STAGE FIVE

Begins after incorporation of results of the pilot course and ends with CCA Letter of Promulgation

EVALUATION

Surveillance, evaluation, change and revision based on performance of graduates in the fleet

Triggers for developing, revising, or canceling a course

(AARRDT)


1. Addition of new course


2. Addition or deletion of course(course data processing)


3. Revision change toinstructional strategy or delivery method


4. Revision to a courses length


5. Deletion of course


6. Transfer of a course between CCAs