Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
12 Cards in this Set
- Front
- Back
Pitch Correction Amount for Deviation
|
1-2 times the deviation (100-200 fpm for a 100 ft deviation)
|
|
Leading a Level Off
|
Begin pitch change at 10% of VVI (100 ft prior at 1000 fpm)
|
|
Fixing a Heading Deviation
|
Bank angle should equal heading deviation in degrees, not to exceed 30 deg
|
|
Leading a Turn
|
Begin roll out at 1/3 the angle of bank (Lead by 10 deg for a 30 deg bank)
|
|
High Performance Level Off
|
For climbs/descents greater than 2000 fpm, cut pitch in half 1000 ft prior to level off
|
|
Vertical S- A
|
Continuous Rate Climb and Descents on a constant heading
|
|
Vertical S- B
|
Same as Vertical S- A but at a constant bank angle
|
|
Vertical S- C
|
Same as Vertical S- B but direction of turn is reversed at beginning of each descent
|
|
Vertical S- D
|
Same as Vertical S- C but direction of turn is reversed with each change in vertical direction
|
|
Wingover
|
Enter through continuous climbing turn, keep ADI wing on horizon, let nose drop at 60 bank angle, 90 through the horizon, opposite through level off
|
|
Aileron Roll
|
15-25 Nose Up, Adjust rate so that completely inverted as nose falls through artificial horizon
|
|
Unusual Attitude Recovery
|
Recognize-Confirm-Recover on Round Dials
|