Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
80 Cards in this Set
- Front
- Back
What does CART stand for?
|
Cammanders Assesment of Readiness and Training
|
|
For Risk Assessment, what are the 4 catagories of "Effect"?
|
Catastophic
Critical Moderate Negligible |
|
For Risk Assessment, what are the 5 catagories of "Probability"?
|
Frequent
Likely Occasional Seldom Unlikely |
|
What is the basis of a Det's C-2 rating?
|
Equipment
Personnel Qual's FXP-6 completion |
|
How is the overall risk level (on the ORM) determined?
|
By the highest residual risk level
|
|
How do you install a new Force Revision (FR) on SKED 3.1?
|
Use the Force Revision wizard
|
|
How long are red Danger tags good for?
|
24 hours
|
|
How long can red Danger tags be hung for?
|
8 hours
|
|
When is "IEM" used?
|
When equipment hasnt been used, or expected not to be used in more than 30 days
|
|
What is a Brown Line?
|
Equipment custody turned over to another Det or Dept
|
|
How do yo verify a PMS check?
|
Verify the MRC card to the MIP, then the MIP to the LOEP, and the LOEP to the Change page
|
|
How often is an audit done on the tag-out index?
|
Bi-weekly
|
|
How long do you keep "Cleared" tag-out record sheets?
|
Until the next audit
|
|
How often is the Instrument log audited?
|
Monthly
|
|
Define "SPMIG"
|
Special Purpose Materials Information Guide
|
|
What is a Feed Back Report (FBR)?
|
Used to report discrepencies OR deficiencies
|
|
What paperwork must be completed prior to hanging tags?
|
Tag-out record sheet
Tag-out Index Tag's themselves |
|
What pub covers everything about tag-outs?
|
Tag-out Users Manual (TUM's)
|
|
What is a "2L"?
|
Request amplifying instructions related to a maintenance action
|
|
What is a "2K"?
|
Request outside support for a maintenance action
|
|
What is a "CK"?
|
Request a ships' configuration change
|
|
What is a catagory "A" Feed Back Report (FBR)?
|
To replace a MIP or MRC
|
|
When are Quarterly Boards scheduled?
|
4-8 months in advance
|
|
What is your "local" chain-of-command?
|
Det
SBT-12 Group 4 WARCOM SOCOM CNO SECNAV SECDEF President |
|
What is your "deployed" (PACOM)chain-of-command?
|
Det
Squadron Unit SOCPAC PACOM CNO SECNAV SECDEF President |
|
What are the 12 sections of the 43P1?
|
1)SBt-12 inst.
2)PMS FBR's & responses 3)PMS Maint. notes, etc 4)PMS service briefs 5)3M/QA PQS's & Qual's 6)43P1 Record of changes 7)LOEP 8)MIP's 9)Cycle schedule 10)Quarterly schedule 11)Weekly schedule 12)13-week file |
|
What instruction deals with 3M?
|
4790
|
|
Define "AEL"
|
Allowance Equipage List
-Part of COSAL -How many on craft |
|
What is deferred maintenance action?
|
An entry into MicroSnap if unable to complete the PMS
|
|
What is a "Techinical" feedback report?
|
When there are problems with the proceedures in the MRC
|
|
What information is listed in the three columns on the PMS LOEP page?
|
1)Any changes made annoted with "-"
2)The MIP# ex:"5833/311-95" 3)Nomenclature ie; "11m NSW RIB" |
|
What are the four sections of the spot-check form?
|
A)Select maintenance requirement from PMS weeekly schedule
B)Safety requirement evaluation C)MRC steps evaluation D)Gradin the Maintenance Requirement |
|
What are the basic equirements a crewman must have to perform maintenance?
|
Be Craftsman & Maintenance-man qualified
|
|
How often are spot checks performed?
|
once a week per workcenter
|
|
Who isthe 3M program coordinator?
|
Sr. Paulo
|
|
Who is the 3M program manager?
|
XO
|
|
What are the two MIP#'s for NVG's & Electro-optics?
|
7621
& 7971 |
|
What is the MIP# for weapons?
|
7611
|
|
What are the four MIP#'s for comm's equipment?
|
4415
4416 4461 & 4552 |
|
What does the MRC deck contain?
|
(MRC) cards & TGL's
|
|
What is an accountability log also called?
|
13 week report
|
|
What does SORTS stand for?
|
Status Of Resoureces & Training System
|
|
Define SODARS
|
Special Operations Debriefing And Retrievel System.
- Used following deployment visit to each country, when demonstrations of foreign capabilities are observed |
|
When is a SORTS message sent out?
|
Within four hours of an operational change in training, and monthly
|
|
When is a CASREP message sent out?
|
When a boat casualty can't be fixed within 48 hours (degrades det readiness)
|
|
What monthly reports are required?
|
Crypto (CCI) inventory
Weapons inventory SORTS Engine hours/fuel consumption RAR, 13-week, & spot checks |
|
Define SPMIG?
|
Standard PMS material Index Guide
-#'s for material needed to complete PMS. This # will give you an NSN# for alt. equipment that can be used |
|
Define COSAL
|
Coordinated Shipboard Allowance List
-All parts of a boat fall under this list |
|
Define ACR
|
Allowance Change Request
|
|
Define QDR
|
Quality Deficiency Report
|
|
Define ROD
|
Report Of Descrepency
|
|
Define ASG
|
Afloat Shopping Guide
|
|
Describe the five steps to putting in a "Job"
|
1)Logon>Select WC>deferred maintenance
2)Put in APL# for whatever your part falls under (it will ask what day you want it, reason, description, how many, how many hrs it will take) 3)After, you recieve the JSN 4)Order as many parts as you need - each will get a requisition # (proof you ordered it) 5)Annotate JSN & Requisition # in RPPO log -Verify CSMP every month |
|
Define CK
|
Configuration Change (4790/CK)
-for additions, updates, alterations or making something new |
|
What falls under 3M?
|
PMS: SKED
Maintenance: MicroSnap 2K, 2L, CK |
|
Define CSMP
|
Current Ships Maintenance Projects
|
|
Define APL
|
Allowance Parts List
-Every boat comes with this - has NSN's for every part on boat |
|
Define ACN
|
Advance Change Notice
|
|
Define TUM's
|
Tagout Users Manual
-NAVSEA Inst 3120 -SBT Inst 5101 |
|
What is TYCOM?
|
Type-Commader
-Ours is WARCOM |
|
Define AEL
|
Allowance Equipage List
-Part of COSAL (how many on craft) |
|
Whats in the DIVO's notebook?
|
Page 2's
Qual's Evals Counselings Supply - tech edits PMS - send reports every week when deployed Underway - Sal plan, ORM |
|
Define MVO
|
Money Value Only
|
|
Define JSN
|
Job Sequence Number
|
|
List some of the responsibilities of the workcenter supervisor - pertaining to 3M
|
Maintan a working knowledge of all equipment deficiencies
Review the CSMP Schedule weekly PMS Ensure status of planned PMS is correct Keep DIVO & MSTO updated on current PMS Keep a supply of 3M material in WC Ensure deficiencies have jobs Verify all paperwork is corect Train new guys in 3M |
|
Name the seven parts contained on a LOEP
|
Report date
Force Revision number Type commander Unit, UIC Workcenter number MIP # Nomenclature (description of the system/equipment) |
|
Name the eleven parts of a MIP
|
Ship system, sytem, subsystem or equipment
Reference number Date Configuration SYSYCOM MRC control number Maintenance requirement Periodicity code Rate Man hours Related maintenance Schedualing aids |
|
What are some of the sections of the RPPO binder?
|
Copy of CSMP
Supply Requisition log APL list Hazmat Autherized users list DDP contents list |
|
What is a catagory "B" feddback report?
|
Request technical or
TYCOM assistance |
|
When are the "Weekly's" schedules?
|
3 - 6 weeks apart
|
|
What reports are due to the 3M Coordinator every week?
|
RAR report
13-week report Spot check sheets |
|
What does the work center supervisor manage (w/3M)?
|
The CSMP
PMS Manuals Tagout log MRC decks 43P1 |
|
What does a cycle schedule consist of?
|
Monthly schedules
Quarterly schedules Situational requirements |
|
What is a COSAL?
|
Tells how many parts to order or should be in stock
|
|
Who can authorize Tagouts?
|
DIVO
Dept. Head 3M coordinator CDO XO CO |
|
What are some of the contents of the 43P1?
|
3M instructions
PMS feedback reports/responses PMS maintenance notes, msg's, etc. PMS service brief 3M PQS matrix & Quals 43P1 record of changes LOEP MIP's Weekly Sched. 13 week file Cycle schedule Quarterly schedule |
|
What does the MRC binder contain?
|
MRC's
TGL's |
|
What are some of the contents of the DIVO binder?
|
All curent inventories
Det evals LOI's Most recent EOM ORM inst's Command phone listings Reciepts for custody of fuel cards |
|
What is a Deferred Maintenance action?
-Where is it entered? |
If unable to complete PMS
-Entered in MicroSnap |
|
List the five sections of a tagout log
|
Danger / caution tagout index
"Active" tagout section "Cleared" tagout sheet section Instructions Instrument log |