Analysis of a Tragically Engineered System: The Interstate 35W Bridge Collapse
Antonio Larios
SYST 505
Professor Rochelle Jones
February 6, 2017
George Mason University
2
Background
The Interstate 35 West (I-35W) Mississippi River Bridge was a steel truss bridge built by the Industrial Construction Company and Hurcon Inc. between 1964 and 1967. Located in downtown Minneapolis, the bridge spanned over 1,900 feet across the Mississippi River and had a width of eight lanes (Minnesota, 2007). As early as 1991, the I-35W Bridge had already been labelled “structurally deficient” by inspectors. Despite the deteriorating condition, it was not legally necessary to place any load restrictions on the bridge. Throughout the bridge’s 40 years of service,
…show more content…
The contractor should have requested permission from the state’s project engineer to place heavy machinery on the bridge, but “lack of guidance . . . with regard to the placement of construction loads on bridges during repair” led to an overload of weight being placed on the bridge on August 1, 2007 (NTSB, 2008). There were over 100 vehicles on the bridge as it collapsed. “As a result of the bridge collapse, 13 people died, and 145 people were injured”
(NTSB, 2008).
In summary, the primary hazard, incident, and accident at the I-35W Bridge are:
 Hazard: Gusset plates supporting the trusses were only half an inch thick, but should have been a full one inch thick.
 Incident: A fracture in one of the gusset plates was triggered by heavy machinery and rush hour traffic positioned on the bridge.
 Accident: Steel beams at the fractured gusset plate node crumpled under pressure.
The remaining nodes could not withstand the deficiency and the bridge fell.
Economic Impact
The I-35W Bridge supported over 144,000 vehicles per day, including 5,000 commercial trucks, as commuters travelled to and from downtown Minneapolis. The bridge connected the northern suburban neighborhoods directly to the industrial business regions across
…show more content…
(2007, August 2). The economic cost of the bridge collapse. Retrieved from http://www.mprnews.org/story/2007/08/02/commercecosts Lilley, S. (2009, September). A Half-Inch to Failure. NASA System Failure Case Studies, 3(6).
Retrieved from https://sma.nasa.gov/docs/default-source/safety-messages/safetymessage-2009-09-01- minneapolis-bridge-collapse.pdf?sfvrsn=4
Minnesota Department of Employment and Economic Development [DEED]. (Undated).
Economic Impacts of the I-35W Bridge Collapse. Retrieved from http://www.dot.state.mn.us /i35wbridge/rebuild/pdfs/economic-impacts-from-deed.pdf
Minnesota Public Radio. (2007, August 3). I-35W bridge fact sheet. Retrieved from http://www.mprnews.org/story/2007/08/03/bridge_background National Transportation Safety Board [NTSB]. (2008, November). Highway Accident Report:
Collapse of I-35W Highway Bridge, Minneapolis, Minnesota, August 1, 2007
(NTSB/HAR-08/03). Washington, D.C. Retrieved from https://www.ntsb.gov/investigations/AccidentReports/Reports/HAR0803.pdf Xie, F., & Levinson, D. (2011). Evaluating the effects of the I-35W bridge collapse on roadusers in the twin cities metropolitan region. Transportation Planning and Technology,
34(7), 691-703.

Related Documents

  • Improved Essays

    There was much debate about whether or not to keep them. The bridge was originally operated by Massachusetts Port Authority. The original plan was to only have the tolls to pay back the $27 million it took to build it. However, the plans were not fulfilled. Instead, the tolls were increased to 25 cents to cover the closing of the Northbound toll plaza in the 1980s.…

    • 452 Words
    • 2 Pages
    Improved Essays
  • Improved Essays

    Narrow Bridge Case Study

    • 1063 Words
    • 5 Pages

    A good number of trials had been carried to test the chains of the suspension bridge while noting down all the yield and possible failure loads by Thomas Telford. Too much time was taken on testing of the chains that little attention was paid to how the light and flexible roadway might react during strong and fats winds. A large number of remedial measures were to be applied which included tying down cables that snapped soon after installation, bumpers and inclined stay cables that all seemed to bare no fruits. The oscillations it received in relatively light winds was attributed as one of the major causes of its collapse. The oscillations were due to the wind vortex shedding in the bridge deck.…

    • 1063 Words
    • 5 Pages
    Improved Essays
  • Improved Essays

    130h Brigade History

    • 757 Words
    • 4 Pages

    The 130th Engineer Brigade has a storied history from the time it was established in the U.S Army as the 1303rd Engineer General Service Regiment and activated on July 15, 1943 at Camp Ellis Illinois. The 130th played a pivotal role during WW II with campaigns in Normandy, Northern France, Rhineland, Ardennes-Alsace, Central Europe and the Asian-Pacific theatre. The regiment was deactivated in 1955 and elements of the 130th were allocated to the regular Army. For a short time the 130th Engineer Brigade was re-designated as the 130th Engineer Aviation Brigade in Japan until it was deactivated in 1956 (130th Engineer Brigade Lineage, n.d.).…

    • 757 Words
    • 4 Pages
    Improved Essays
  • Improved Essays

    Imagine you’re 600 feet in the air, looking down at the little world below you. The itty bitty cars and teeny tiny people. It is hard to believe you were once down there, that the world shrunk or that you grew. The Mississippi River and beyond on one side, St Louis on the other. That's right, you're at the top of the western hemisphere's tallest monument, the Gateway Arch!…

    • 873 Words
    • 4 Pages
    Improved Essays
  • Improved Essays

    Introduction The I-35W bridge was fully constructed and opened in November 1967 over the West Mississippi River in Minneapolis, Minnesota. According to Federal Highway Administration (FHWA), the length of the bridge was 1907 feet and its maximum span length was 458 feet. It had 8 traffic lanes and a height of 64 feet above the water. On the evening of August 1st, 2007 this steel arch deck truss bridge collapsed during rush hour.…

    • 894 Words
    • 4 Pages
    Improved Essays
  • Improved Essays

    The quake was set at 6.9 magnitude, one of the more notable earthquakes to hit San Francisco. Various reports state the quake lasted for 15 seconds, but seemed as if it was an eternity. Approximately 3000 citizens were injured, and 42 died from the collapse of the bridge. The bridge was reportedly scheduled for a retrofitting next week, which would’ve possibly prevented the incident from becoming this severe.…

    • 822 Words
    • 4 Pages
    Improved Essays
  • Improved Essays

    Ninth Ward Levee Analysis

    • 575 Words
    • 3 Pages

    It was the failure of the levees on the Industrial channel that caused devastating flooding to the surrounding Ninth Ward neighbourhood leading to many social implications within the community. The levee failure caused a torrent of water to pour into the neighbourhood with buoyancy forces that caused 125 structures to float onto the roads (Green et al. 2007), with more structures requiring demolition due to damage. It was the Ninth Ward district that also experienced the greatest loss of life due to the failures of the levees. Before Katrina, the Ninth Ward in New Orleans was a low to moderate-income African-American residential neighbourhood.…

    • 575 Words
    • 3 Pages
    Improved Essays
  • Improved Essays

    Engineering Feat: Hoover Dam One of the largest dams in the world, the hoover dam provides hydroelectric power thanks to the Colorado River and forms Lake Mead. This dam was completed in 1935 and has the world’s largest reservoir of water. This dam is an engineering feat due to its ability to control the Colorado River’s flooding problem, contain such high quantities of water, and provides water and electricity to Los Angeles and Southern California. This project also resulted in a new kind of concrete admixture. Hoover Dam is named for Herbert Hoover, the 31st President of the United States.1 Construction of Hoover Dam began in 1931, and the last concrete was poured in 1935 - 2 years ahead of schedule.2 Hoover Dam's authorized purposes are:…

    • 752 Words
    • 4 Pages
    Improved Essays
  • Improved Essays

    Tapan Zee Bridge Analysis

    • 411 Words
    • 2 Pages

    In my teaching career, I have taught at two schools that have a very mobile population. In elementary about 60-75 percent of my students grew up or have once lived in the Chicago area. I was surprised by how well they responded to learning about the bridge and wanting to know more (Gallagher & Downs, 2012). The biggest trace that we…

    • 411 Words
    • 2 Pages
    Improved Essays
  • Improved Essays

    Andrew Carnegie My Hero

    • 461 Words
    • 2 Pages

    But a bridge that can hold a train across the four mile span of the Mississippi river? He could not think of a cheap and strong material to do this. But loyal and wanting to fulfill his boss’s dream,…

    • 461 Words
    • 2 Pages
    Improved Essays
  • Improved Essays

    Essay On Twin Towers

    • 939 Words
    • 4 Pages

    Thousands witnessed the collapse live and in person and one of those people was Dr. Thomas Edgar. Dr. Thomas Edgar, a witness of the collapse, told Nova online, “All buildings and most bridges have what we call redundant design. If one component breaks, the whole thing will not come crashing down” (Tyson). Reading this statement may have confused many. One might ask themselves: “If all buildings have this ‘redundant structure’ how could the building collapse on the bottom if the explosions happened on the top?”…

    • 939 Words
    • 4 Pages
    Improved Essays
  • Improved Essays

    The first known covered bridge in America crossed the Schuylkill River at Philadelphia with a length of 550 feet Covered bridges are nostalgic pieces of the past and the essence of romance. They make people think about to what life was like in the past.…

    • 294 Words
    • 2 Pages
    Improved Essays
  • Improved Essays

    The bridge looks like it’s ready to crumble. This photo was taken in the wee hours of the morning, in a forest with very tall trees looming. The bridge was built very long ago, and it was a means of getting across from one side of the river to the next, but has been abandoned for quite some time. Anyone who came across this bridge would be scared,…

    • 813 Words
    • 4 Pages
    Improved Essays
  • Superior Essays

    Since, the prison is the major employer of Mainville, this bad condition of the bridge can be considered quite critical for the employment status of the city. Bad conditions of the bridge is indicating that it would be washed away in the coming rain which would disconnect prison with the rest of the city. It would lead to harm economic viability of the city. Moreover, in comparison to the road construction projects, the repair of the bridge would be less expensive. This project would also be less time consuming which make it more attractive for the commissioners to be accepted.…

    • 1560 Words
    • 7 Pages
    Superior Essays
  • Great Essays

    Factors causing the occurrence of damage to the surface or parts of the bridge. ii. Maintenance works which are often carried out in maintenance management. iii. Case studies in Jambatan Kedua Sdn.…

    • 1086 Words
    • 5 Pages
    Great Essays