Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
40 Cards in this Set
- Front
- Back
WHAT IS CHAPTER 5.1 OF THE NAVAL AVIATION MAINTENANCE PROGRAM (NAMP)?
|
Maintenance Control Production Control Maintenance Material/Control
|
|
WHAT IS CHAPTER 5.2 OF THE NAVAL AVIATION MAINTENANCE PROGRAM (NAMP)?
|
Aircraft Logbook (Paper), Reports
Configuration Management (CM) Auto Log-sets (ALS's) |
|
WHAT IS HOT REFUELING?
|
An operational evolution where an aircraft is refueled while the engine(s) is (are)operating.
|
|
WHAT IS HOT SEATING?
|
An operational evolution where the pilot/crew of an aircraft is changed while the engine(s) is (are) operating and the aircraft is to be immediately relaunched.
|
|
WHAT IS PROJECT CODE BK0?
|
Assigned by the IMA when requisitioning material to repair SE that is inoperative and a workaround, redundancy, or local backup is available.
|
|
WHAT IS PROJECT CODE BK1?
|
Assigned by the IMA when requisitioning material to stop an AWP condition on a specific end item or component (other than aircraft engines) undergoing repair. (BK1 will not be used for material required for components undergoing EXREP for NMCS or PMCS requirements - see Project Code ZC8.)
|
|
WHAT IS PROJECT CODE ZC8?
|
Assigned by the IMA when requisitioning material to stop an AWP condition on components and aircraft engines undergoing repair when directly related to aircraft support, for example, components that are undergoing EXREP repair for NMCS or PMCS requirements and engines that are being repaired for bare firewalls.
|
|
WHAT IS PROJECT CODE ZF7?
|
"Broad Arrow" (SE inoperative)
|
|
WHAT IS PROJECT CODE ZQ9?
|
Engine maintenance work stoppages for all model aircraft engines. (ZQ9 will not be assigned for material required for engines being repaired for bare firewalls - see Project Code ZC8.)
|
|
PRIORITY 1
|
Support of NMC or PMC aircraft
This priority is also assigned to activities within 30 days of deployment. |
|
PRIORITY 2
|
Repair of critical LRCAs and SE. This priority is also assigned to O-level maintenance activity's work stoppage requirements.
|
|
PRIORITY 3
|
Repair of noncritical LRCAs and SE, and repair or manufacture of material for nonfixed allowance stock
|
|
PRIORITY 4
|
Processing of salvaged material and nonaeronautical work.
|
|
WHO is responsible for the overall management of the Material Control function?
|
MMCO.
This responsibility may be exercised through various Production Division officers, the Support Services Division Officer (if established), and supervisors as determined by the MO. |
|
WHAT DOES AMMRL STAND FOR?
|
Aircraft Maintenance Material Readiness List
|
|
WHAT DOES AIR STAND FOR?
|
Aircraft Inventory Records
|
|
WHAT IS OPNAV 4790/111?
|
The Aircraft Inventory Record (Equipment List)
|
|
How many parts are there in the AIR?
|
5
|
|
Who is the publisher of the AIR
|
MANUFACTURER
|
|
Upon completion of transfer what needs to be signed?
|
OPNAV Form 4790/104
|
|
OPNAV FORM 4790/109
|
BINDER/COVER
|
|
OPNAV FORM 4790/110
|
TITLE/AIRCRAFT INVENTORY RECORD
|
|
OPNAV FORM 4790/112
|
SHORTAGES
|
|
OPNAV FORM 4790/104
|
CERTIFICATION AND RECORD OF TRANSFER
|
|
If the aircraft is being transferred from a depot, how soon should a receiving activity receive items on the shortage list?
|
30 days prior to depot level completion
|
|
The following personnel are authorized to sign aircraft logbooks and records
|
CO
O-level MO I-level MO D-level Director of Operations. OMD Officer |
|
OPNAV 4790/23A
|
Repair/Rework Record
|
|
WHAT IS CHAPTER 9 OF THE NAMP?
|
MATERIAL MANAGEMENT
O LEVEL I LEVEL D LEVEL |
|
Issue Priority Group: 1
Priority Designator: 1-3 WHAT IS PROCESSING TIME? |
1 HOUR
|
|
Issue Priority Group: 2
Priority Designator: 4-8 WHAT IS PROCESSING TIME? |
2 HOURS
|
|
Issue Priority Group: 3
Priority Designator: 9-15 WHAT IS PROCESSING TIME? |
24 HOURS
|
|
WHAT IS CHAPTER 6.1 OF THE NAMP?
|
PRODUCTION DIVISIONS
|
|
WHAT IS CHAPTER 6.2 OF THE NAMP?
|
WORK CENTER SUPERVISOR
|
|
What is the governing instruction for the AMMRL?
|
NAVAIRINST 13650.1
|
|
AMMRL STAND FOR?
|
AIRCRAFT MAINTENANCE MATERIAL READINESS LIST
|
|
What fund is used to requisition IMRL items for intial outfitting?
|
OFC-09
|
|
What fund code is used for initial outfitting?
|
8X Fund Code
|
|
N?
|
Assigned to all items not coded
|
|
L?
|
items requiring calibration
|
|
HOW MANY SECTIONS ARE THERE IN THE IMRL? IDENTIFY?
|
5/
1. MAIN BODY 2. CROSS REFERENCE INDEXES 3. CHANGE LIST 4. EMPLOYMENT DATA 5. ACTIVITY INVENTORY RECORD |