The variable cost is $1 per flange for materials, and $2 per flange ($20 per hour divided by 10 flanges per hour) for direct manufacturing labor. 2. The inventoriable (manufacturing) cost per unit for 5,000 flanges is $3 × 5,000 + $20,000 = $35,000. Average (unit) cost = $35,000 ÷ 5,000 units = $7 per unit. This is below Fred’s selling price of $8.25 per flange. However, in order to make a profit, Graham’s Glassworks also needs to cover the period (non-manufacturing) costs…
However, the large drop in PalmKid’s contribution margin per unit combined with a decrease in the actual number of PalmPro units sold as well as a drop in the actual contribution margin per unit below budget, led to the total contribution margin being much lower than budgeted. Other factors could be discussed here––for example, it seems that the PalmKid did not achieve much success with a three digit price point––selling price was budgeted at $149 but dropped to $102. At the same time,…