Reserve requirement

Decent Essays
Improved Essays
Superior Essays
Great Essays
Brilliant Essays
    Page 4 of 50 - About 500 Essays
  • Improved Essays

    Poka Yoke Case Study

    • 844 Words
    • 4 Pages

    A frame work for assesing poka-yoke device According to this article the framework assesses the processes of the design, operation and maintenance of poka-yoke devices. The framework includes a scoring system; background in both lean production and human factors is required to apply the framework. (https://www.sciencedirect.com/science/article/pii/S0278612512000313) Enabling Poka-Yoke Workflows with the AristaFlow BPM Suite This tool gives idea into the AristaFlow BPM Suite – a next generation…

    • 844 Words
    • 4 Pages
    Improved Essays
  • Great Essays

    processes and tools used”. Emphasis is placed on collaboration between the client and the developers as aiding in the requirements definition process reduces unknowns and increases efficiency (Dawson, 2015). Continuous attention to technical excellence and good design is a third advantage (Haunts. S, 2014). The developer creates what is needed to satisfy the client’s requirements and limits him to design simpler, reliable and testable systems. Lastly Haunts. S, (2014) explains how regular…

    • 2337 Words
    • 10 Pages
    Great Essays
  • Superior Essays

    Structural joints: 1. Inter modular joints: SFT is a structure that is made up of prefabricated modules assembled in situ though it would be a complicated but it can have to do if the segment is not possible for the single one. So therefore, the joints between the modules. This part is sensitive because of waterproofing and safety of people inside the tunnel. Nowadays, the inter modular joints are used for immersed tunnels (IT) in the form of flexible joint that performs many tasks such as: to…

    • 1162 Words
    • 5 Pages
    Superior Essays
  • Improved Essays

    According to the “Ariane 5 Flight 501 Failure: Report by the Inquiry Board”, the failure that caused the Ariane 5 was a design error, namely of an Operand Error. The report says, “The exception was detected, but inappropriately handled because the view had been taken that software should be considered correct until it is shown to be at fault” (Lions, 1996). This view manifested itself in the use of extant software from Ariane 4 that was used for Ariane 5 because, to simplify, it worked well for…

    • 489 Words
    • 2 Pages
    Improved Essays
  • Decent Essays

    Sprint Planning 1) Goal: a. Create the sprint backlog based on the top items in the team product backlog. b. Effort at the PBI level will be estimated with story points. c. Create tasks for each PBI that will get that PBI to “done”. i. Each task will be estimated in hours. ii. Review DOD document to ensure that all DOD tasks have been created for each PBI. 2) When: a. First day of each sprint. 3) Attendees: a. Scrum Master i. Ensures the meeting occurs. ii. Ensures attendees understand meeting…

    • 285 Words
    • 2 Pages
    Decent Essays
  • Great Essays

    Agile Adoption Case Study

    • 1563 Words
    • 7 Pages

    The authors of Risks of Rapid Application Development lead off their discussion with this salient point (Agarwal, Prasad, Tanniru, & Lynch, 2000). They argue that management should not force the change through the organization but rather build a cultural shift that is accepting of what the process is looking to accomplish (Agarwal, Prasad, Tanniru, & Lynch, 2000). Ensuring that their is top down support doesn’t guarantee success however, without the support of management the process will not…

    • 1563 Words
    • 7 Pages
    Great Essays
  • Decent Essays

    Nnwc Case Analysis

    • 361 Words
    • 2 Pages

    Critical Elements: 1) I have provided exceptional performance in managing the NNWC ASI/Change Management Process and Support in accordance with critical element one by carrying out processes to include but not limited to 328 EMR's, 188 Power Outages, 3,415 DISA ASIs, 1,764 TACPLANS ASIs, 2 Maintenance Moratoriums with 7 Moratorium Waivers processed, 9 PONDs, 18 UABs, and 119 UC's. In addition, I have added new features to the SIPR ASI SharePoint Portal to include: Color coding for better…

    • 361 Words
    • 2 Pages
    Decent Essays
  • Superior Essays

    interactions are emphasized rather than process ad tools. Working software is delivered frequently so there is always progress made and improvements to be made. Close, daily cooperation between business side and developers. And even late changes in requirements can be made. Disadvantages of Agile But Agile is not perfect with all the above said about Agile SDLC, there are some disadvantages wit Agile and these include: In case of some software deliverables, especially the large ones, it is…

    • 1729 Words
    • 7 Pages
    Superior Essays
  • Improved Essays

    to promote the goal of the early separation of concerns from the implementation level towards other software development process phases, including the specification, analysis and design requirements. The Aspects-Oriented technology premise is the division of crosscutting concerns, where certain design requirements tend to cross the central functional entities group. However, some research groups have worked to introduce the use of linguistic divider mechanisms to modulate and compose…

    • 846 Words
    • 4 Pages
    Improved Essays
  • Improved Essays

    new tender specification requirements and to enhance their chances in getting new tenders they need comply with the new specifications. The new specification requires those working with the data to be qualified and be registered with PLATO as a GISc technician. The current stuff has the required experience and has been doing a great job, and has assisted in the bringing the company new contracts and enhancing the company reputation in the past but do not meet the requirements. 1.1 Martha’s…

    • 2000 Words
    • 8 Pages
    Improved Essays
  • Page 1 2 3 4 5 6 7 8 9 50