Deliverable

Decent Essays
Improved Essays
Superior Essays
Great Essays
Brilliant Essays
    Page 2 of 46 - About 455 Essays
  • Decent Essays

    Project Scope Statement

    • 461 Words
    • 2 Pages

    will help the project manager control whether deliverables are being produced to an acceptable quality level and if the project developments used to manage and generate deliverables are current and accurately applied. Project Deliverables Deliverables are dependent on the project, customer…

    • 461 Words
    • 2 Pages
    Decent Essays
  • Great Essays

    logical to meet the project’s scope. WBS contains the facilitation, estimation, resources requirements, point of control, system and network, and assigned responsibilities for plans, development, and implementation to a project. Scope objectives, deliverables, and work packages are the framework to a WBS (Venkataraman & Pinto, 2008). Failure to identify those aspects can lead to false expectations or an unnecessary waste of time and resources (Venkataraman & Pinto, 2008). The scope…

    • 2016 Words
    • 8 Pages
    Great Essays
  • Great Essays

    Rickley Cottage Case Study

    • 1231 Words
    • 5 Pages

    The purpose of this project is to develop an outline for the construction process necessary to complete the remodeling of the Rickley cottage. The outline will provide information of essential resources, a schedule of the project consisting of deliverables and tasks. The outline will guide contractors through the remodeling of the Rickley cottage. This will make sure the project is completed on time, on budget and to the satisfaction of our client. The project will include gathering information…

    • 1231 Words
    • 5 Pages
    Great Essays
  • Improved Essays

    Bottom Up Estimation Essay

    • 1147 Words
    • 5 Pages

    techniques are used in different projects. Two of them are explained below Bottom up estimation Bottom up estimation, as the name implies entails judging the cost and schedule of a whole project by aggregating the cost and time required by individual deliverables as specified in the work break down structure. Work break down structure already decomposes the project into smaller tasks, therefore bottom up estimation works by calculating the resources required by each task and finally summing…

    • 1147 Words
    • 5 Pages
    Improved Essays
  • Great Essays

    Congratulations on acceptance to the university with focus being on three main objectives. The first objective is to ensure they have visited the university in person or virtually. The deliverable training information stressed the importance of the students emotionally connecting to the institution to begin their vision of enrolling and being in the college culture without fear. The second objective is to ensure they had all the necessary…

    • 1502 Words
    • 7 Pages
    Great Essays
  • Great Essays

    Procurement Management In view of the fact that RMLEB is a non-profit entity, some of the elements of the lean six sigma approach will be integrated within the AAE project. The combination of lean and six sigma methods establishes an inclusive toolset that can enhance the speed and effectiveness of processes within an organization (Sunder & Shah, 2016). One of the tools that will be utilized during the undertaking is the DMAIC (define, measure, analyze, improve, and control) methodology in…

    • 1274 Words
    • 6 Pages
    Great Essays
  • Great Essays

    A detailing of the design development and its requirements of the project are set forth in the following section. 2.1 Background The site location’s address for the design project is 2764 Cedar Avenue - Penticton, British Columbia (see Figure 6). The terrain itself poses challenges for the team that is attributable to the unique steep topography the site location is situated on. 2764 Cedar Avenue is classified as a hillside development and requires adherence to strict guidelines set out by the…

    • 644 Words
    • 3 Pages
    Great Essays
  • Great Essays

    critical concepts for review and continuing through page 64 with the final submission. Prepare for this project by reviewing the prior units’ lab assignments and the prior units’ material covering the course objectives and learning outcomes. Deliverables You will submit an MS Word document with the answers to the three questions integrated within the project at key points. Questions 1 and 2 are on p. 62 and Question 3 is on p. 63 of the lab manual. This MS Word document will be named…

    • 7891 Words
    • 32 Pages
    Great Essays
  • Decent Essays

    HIV-human interactions for lack of data for the other viruses. DeNovo is the first model to allow predicting the interactions between human and any virus, even if that virus has no known interactions with human. In DeNovo-II, the output of this deliverable, we developed the prototype DeNovo to a full working prediction model with data bias eliminated as follows: • We used a larger data set (HPIDB) in training our model, comprising of 24K unique virus-human PPIs. • We changed the similarity…

    • 2256 Words
    • 10 Pages
    Decent Essays
  • Improved Essays

    the complexity of the project in addition to the effort involved or that needed to be involved. Performing the necessary planning to address the risk of not having the necessary knowledge resources in place and involved in the appropriate project deliverables and decisions that were made is a key factor. For example, proper risk planning would have helped the PMT realize that more time would need to be built into the schedule to allow the automated baggage handling system to be…

    • 531 Words
    • 3 Pages
    Improved Essays
  • Page 1 2 3 4 5 6 7 8 9 46