Construction aggregate

Decent Essays
Improved Essays
Superior Essays
Great Essays
Brilliant Essays
    Page 42 of 50 - About 500 Essays
  • Improved Essays

    Monument is a kind of the architecture for people to memorize the history and understanding the relationship between the past and the present. It records the history from the past, and present it to the future. The purpose of building the monument in the city is for reminding us what we have right now is depends on how many effort they (historical personage) did in the past. Monument is not only for people to memorize something, it also could be educational and motivational to the audience.…

    • 752 Words
    • 4 Pages
    Improved Essays
  • Improved Essays

    Document Management: One of the other communication practice is related to document management. The documentation or its management was traditionally done by paper and prints. Technological advances in the construction sector has changes this old practice. Now availability and access to different digital software has changed the way the industry use to work. One of such collaboration practice is cloud collaboration. Cloud collaboration helps to manage the project data under a single cloud-based…

    • 848 Words
    • 4 Pages
    Improved Essays
  • Superior Essays

    Northern Coast; The important region in Egypt contains important and luxury resorts (8.4km), Borg El-Arab City A new community in the Alexandria Governorate (18.5km). 5-3-1 The first level of design: cityscape scale: According to the stadium location; its main approach is the journey from Alexandria City; Cairo is too far, Northern Coast equipped only in the summer, Borg El-Arab City is new residential with small population “108.000 inhabitants ("Borg El Arab", 2013).” A- Stadium as an…

    • 931 Words
    • 4 Pages
    Superior Essays
  • Superior Essays

    The main trunk railway of North Island was completed in 1908, during that time to be able to provide housing to workers, a factory was established in Hamilton in 1922 to build relocatable houses. For this reason, this type of houses is called Railways Cottage. ("Bungalow | BRANZ Renovate", 2017) To be able to get the best result of refurbishment of this house, study towards the plan and features to construct the house must be done thoroughly to identify and rectify the mistakes that had been…

    • 1832 Words
    • 8 Pages
    Superior Essays
  • Improved Essays

    No building can survive without a strong and sturdy foundation. Considering that, any problem with your home’s footing necessitates immediate foundation repairs from the reliable experts at Stan Young Drainage. Their sound expertise in structural repairs and waterproofing has earned them a loyal clientele across Kentucky and Ohio. They draw on their extensive experience and knowledge in the field to explain how foundation repairs can save you from the following issues: Compromised Structural…

    • 401 Words
    • 2 Pages
    Improved Essays
  • Improved Essays

    control is imposed by the relatively high cost of the materials employed for construction of erosion-control structures. The most commonly employed materials for coastal protection structures used in populated coastlines (e.g., seawalls, revetments, groins, and detached breakwaters) are concrete (new or recycled), limestone, granite, other stones, and steel. In the State of Louisiana, the material used for dike construction and as riprap is mostly limestone extracted from mines located in…

    • 582 Words
    • 3 Pages
    Improved Essays
  • Great Essays

    The Villa Savoye is one of the most important modern buildings of the 20th century which incorporated the Le Corbusier’s five principal points of architecture, and it could be the perfect realization of Le Corbusier's principles. This building is located outside of Paris and offers a space for occupants to escape from the crowded Paris. The location of the villa helped Le Corbusier to have freedom in design in order to create a masterpiece which would truly stand the test of time. This building,…

    • 1897 Words
    • 8 Pages
    Great Essays
  • Improved Essays

    and system development life cycle are the same but they are not. Project management life cycle includes four major areas, initiation, planning, execution and closeout. On the other hand, system development lifecycle includes requirement, design, construction and implementation. This paper is a literature reviews of two articles which have been previously selected. This first one, is talking about integration of the project management lifecycle (PMLC) and the systems development life cycle…

    • 962 Words
    • 4 Pages
    Improved Essays
  • Improved Essays

    important part of the structure for the Chinese. V. Arches that are in a straight line are called an arcade. • Recent Methods and Materials: I. The structures and materials used in past centuries are different from today’s generations. II. Steel frame construction made building taller buildings easier to…

    • 928 Words
    • 4 Pages
    Improved Essays
  • Great Essays

    Alarm Fatigue

    • 1614 Words
    • 7 Pages

    Alarm Fatigue and the Design of the Legacy Way Control Room Introduction The design of a control room is a critical aspect of ensuring the safety in many industries where data and sensors are prevalent, and having pure human monitoring is difficult or impractical. The national energy grid, petroleum refinery facilities, and railways are a few of the industries that rely on a control room to ensure the smooth and safe functioning of the system. In Brisbane Australia, the Legacy Way tunnel has a…

    • 1614 Words
    • 7 Pages
    Great Essays
  • Page 1 39 40 41 42 43 44 45 46 50