Capacity building

Decent Essays
Improved Essays
Superior Essays
Great Essays
Brilliant Essays
    Page 1 of 50 - About 500 Essays
  • Improved Essays

    Non-Cohesive Non-cohesive subsoils are sandy in nature and they present less of a problem for building on. They are composed mainly of sand and gravel, and they are closely compacted together which means that they are not affected by water. Therefore, their load bearing capacity does not change with the various seasons, summer or winter, drought or flood, it makes no difference. This means that they are unchanging. Cohesive Cohesive subsoils are predominantly clay they rely on water for their strength and to bond the very fine particles together. They will be particularly affected by drought and the clay is the most…

    • 1270 Words
    • 6 Pages
    Improved Essays
  • Great Essays

    Building structure is a combination of several aspects that act as a building. The information about the building structure is significant to assess the structural vulnerability of a building from various hazards. The construction materials, style and type of the buildings depends on the usage such as residential, commercial, light industrial and special buildings. The building construction types for the residential buildings are separate houses, semi-detached and apartment buildings.…

    • 1344 Words
    • 6 Pages
    Great Essays
  • Improved Essays

    Washington DC: 11th Street [The Need] Bridges are no different than any other form of infrastructure, eventually they break down and need to be either repaired or replaced. Inspection occurs at least every two years, yet bridges are often pushed to their absolute limits of usability. In Washington DC, the 11th Street Bridge Project aims to replace two bridges built in the 1960s with three new bridges. With these bridges having been in place for nearly 50 years, there were numerous issues. For…

    • 1360 Words
    • 6 Pages
    Improved Essays
  • Improved Essays

    Montgomery Civic Center

    • 353 Words
    • 2 Pages

    they called a space roof. The 300 by 360 ft. roof frame consisted of top and bottom square grids with joints 30 feet on center, connected by diagonal bars that caused staggered nodes on the top and bottom grid bars, resembling pyramid trusses when they were finished. This non-standard design was intended to save on costs and additionally provide some other features such as better drainage and the elimination of bending stresses. The construction of this unique roof design was done entirely on…

    • 353 Words
    • 2 Pages
    Improved Essays
  • Improved Essays

    Part 3: Preamble and Justification of the Four Policies Part 3.1: Policy Safety 1: Rebuilding, Monitoring and Assessments of Building Safety The council will grant planning permission for the development where safety will be maintained and enhanced, with its main focuses on:  Rebuilding damaged buildings by flooding or other disasters which improve their quality of safety to live in, and to ensure safety is valued during the development.  Ensuring that the quality of buildings will be…

    • 909 Words
    • 4 Pages
    Improved Essays
  • Great Essays

    suitable also for providing sufficient seismic resistance to single-storey buildings. Although in the last decades several studies were carried out on CSEB, to the best of the authors’ knowledge, no literature is available on the structural use of CSEB masonry subjected to earthquakes of different intensity. The implementation of structural analysis tools able to support the assessment of the existing earthen buildings and the design of new earthen buildings is crucial. A key point is related to…

    • 1732 Words
    • 7 Pages
    Great Essays
  • Great Essays

    Theatre Architecture Essay

    • 1472 Words
    • 6 Pages

    theatre but it was demolished in 1971 in order to accommodate for a new dramatic arts space. The growing city needed a more modern approach to theatrical design and so the city council appointed Architects, Law & Dunbar-Naismith to commission a much larger and practical public realm for Inverness: Eden Court Theatre. The project consists of a new, modernist building that connects directly onto the existing Episcopal Palace that is situated on the beautiful banks of the river Ness. The palace…

    • 1472 Words
    • 6 Pages
    Great Essays
  • Improved Essays

    Introduction Off-site construction is part of modern methods of construction (MMC) and relates to construction activities that are carried out in a high quality controlled factory environment away from the site. Subsequently, the building components fabricated in the factory, are transported to the site location in order to be assembled on-site. This leads to a greater degree of finish than in traditional piecemeal on-site construction due to elimination of on-site work and rapid site assembly.…

    • 812 Words
    • 4 Pages
    Improved Essays
  • Improved Essays

    I am making this maintenance plan for Preston valley, Dallas. Maintenance is defined as the work that is done to keep your building in good working condition. This is done on a regular basis. Most of the maintenance tasks are done by the building’s super, but some of the tasks can be done by officers, maintenance and repairs committee, outside contractors or the tenants themselves. Maintenance policy is a statement of principle used to guide maintenance management decision making. The purpose…

    • 966 Words
    • 4 Pages
    Improved Essays
  • Great Essays

    Apart from relating the underground buildings with technology, underground space could be designed into an interesting space to be appreciated. (People’s perception on underground space – relating to the real world, imaginative world is mentioned.) Underground space in the imaginative world will be discussed, for instance, the film makers’ perspective on underground space and how their film was projected to the audience about underworld. The quality space discussed will show the dynamic balance…

    • 1135 Words
    • 5 Pages
    Great Essays
  • Previous
    Page 1 2 3 4 5 6 7 8 9 50