• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/58

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

58 Cards in this Set

  • Front
  • Back

What is OPNAV 4790/2L?

Supplemental Form

What is OPNAV 4790/2K

Maintenance Action Form

What is an OPNAV 4790/CK

Configuration Change Form

What is Layup Maintenance?

Maintenance actions prepare the equipment for periods of prolonged idleness and are usually performed only once at the beginning of the inactive period.

How many 13 week reports are maintained in the accountability log of the work center PMS manual

13 plus current one

When does the quarter start

1st Monday of the quarter

What does OMMS - NG stand for

Organizational maintenance management system next generation

How is the 13 week with accountability mark to show maintenance was completed

MP signs in the signature block, dates, and enters tag out information and notifies the work center supervisor to have them X over the periodicity

What department/division is responsible for editing work centers when adding parts, adding APL's or changing work centers

Engineering/MSC

How would you put the summary when reading a work candidate

Brief description of the problem

What is periodic maintenance

Accomplished on a recurring basis during the inactive period to prevent equipment deterioration

What priority codes require CASREP message when writing a work candidi

Mandatory, Essential, highly desirable

What case must all work candidates be written in

Capital letters

What is selected in the maintenance level block for a job that is to be accomplished by another work center on board

Organizational

What is selected in a maintenance level block for a job from TY COM

Fleet technical support

What display is customized to your user category and placed in the chain of command

My task

What is selected in the maintenance level block for a job that the regional maintenance center is to accomplish

IMA

What is selected in the Maintenance Level block for a job at the shipyard or contractor is to accomplish

Depot

What block is used to state what is needed to correct the problem with the equipment

Recommended solution block

What type of FBR is required when shifting maintenance from one work center to another

Category be[ technical]

What instruction is the NAVOSH safety manual

5100.19

What are components that must be turn in prior to receiving the replacement component and then shipped to depot maintenance level for repair called

Depot level repairable (DLR)

6641/005 M-5 note 1 States "omit step not applicable", neither step 2 or step 3 apply to the work center configuration. Step one is the only maintenance requirement that applies. What is the responsibility of the WCS to correct this issue

Line - out step 2 and step 3 on the MIP and MRC and have the HOD initial line - out

Which symbol is used to mark scheduled maintenance that was accomplished by a higher - level system test

The sent symbol with explaining of the part system test

Each tag - out log shall contain

TUM, Index sheet, Active TOR's, instrument log sheet, clear TOR's

Each tag out log shall contain

Tums index sheet, active tors, instrument log sheet, clear tours

What does a warning note on the MRC indicate

Death or injury may result

What is the 1st step when a danger tagged component is found out of position or a danger tag is found on the wrong component

Report The condition immediately to the authorizing officer and ra rep

Who is responsible to ensure that all equipment owned by the work center has the correct PMS

Work center supervisor

How is the 13 week accountability marked to show maintenance was not accomplished

X

What is start up maintenance

Maintenance that consist of performing turn on procedures and restoring the Equipment to its ready for service condition

What is an LGL

Location guide list

When must a rating block be strictly adhered to

DCPO, SPO, or lists a specific NEC

What is operational test maintenance

Conducted to determine the operational condition of the equipment, its ability to function as designed, and to be integrated with other equipment to form a system

What program is used to create an LGL

Sked 3.2

What is the CVN70 hazmat instruction

5100.6E

What is an AER

Admin Edfectivness Review

Who signs the 13 week accountability at the end of the week

WCS/DIVISION OFFICER/LCPO

What department or division is responsible for editing work centers when adding parts, adding APL's, or changing work centers

Supply/S-6

How is the 13 week accountability mark to show maintenance was accomplished

Mp signs in the signature block, dates, and enters tag out information and notifies the was to have them X over the periodicity

Which of the following reports are generated in sked

Technical feedback report

Where is the reason documented if maintenance item is not complete

Flip page Report

When the hod approves the cycle and the quarterly schedules they must be printed out and inserted into the 43P1

False

What is the purpose of signing the 13 week report at the end of the week

Verifies the CSMP has been reviewed

Who approves the quarterly schedule

Department head

What are the 4 sked views

Cycle, Qauarterly, Weekly, List

When creating an LGL, what is the maximum amount of equipment that can be assigned that LGL

1 Work day

Why dose the work center supervisor sign the record of change page after force revision has been installed to the 43P1

Verification of the LOEP,MIP,MRC,EGL is complete

How many valids are to be completed each week by a work center in a large department

10

How many valids are to be completed each week by a work center in a small department

5

Who is responsible for approving the work center schedules after creation or administrative changes are made

Department head

How is the 13 week accountability marked to show maintenance was partially or non-accomplished

MP writes the reason why on the reverse side and notifies the wcs to have them mark a circle around the periodicity

What must be annotated on a MIP in regards to a split MIP where maintenance requirements are performed by another work center

The maintenance requirements will be lined out in the responsible work center code will be written to the right of the item

Who is responsible to ensure that all equipment own by the work center has the correct PMS

Work center supervisor

Urgent technical feedback reports are filed when

PMS discrepancies could have a detrimental the fact on personal safety , could result in significant equipment damage

Which symbol is used to mark schedule maintenance that was accomplished by a higher level system test

The cent symbol with explanation of the parent system test

What are components that must be turned in prior to receiving the replacement component and then shipped to depot maintenance level for repair called

Depot level repairable (DLR's)

What block is used to state what is needed to correct a problem with the equipment

Recommended solution block