What is OPNAV 4790/2L? |
Supplemental Form |
|
What is OPNAV 4790/2K |
Maintenance Action Form |
|
What is an OPNAV 4790/CK |
Configuration Change Form |
|
What is Layup Maintenance? |
Maintenance actions prepare the equipment for periods of prolonged idleness and are usually performed only once at the beginning of the inactive period. |
|
How many 13 week reports are maintained in the accountability log of the work center PMS manual |
13 plus current one |
|
When does the quarter start |
1st Monday of the quarter |
|
What does OMMS - NG stand for |
Organizational maintenance management system next generation |
|
How is the 13 week with accountability mark to show maintenance was completed |
MP signs in the signature block, dates, and enters tag out information and notifies the work center supervisor to have them X over the periodicity |
|
What department/division is responsible for editing work centers when adding parts, adding APL's or changing work centers |
Engineering/MSC |
|
How would you put the summary when reading a work candidate |
Brief description of the problem |
|
What is periodic maintenance |
Accomplished on a recurring basis during the inactive period to prevent equipment deterioration |
|
What priority codes require CASREP message when writing a work candidi |
Mandatory, Essential, highly desirable |
|
What case must all work candidates be written in |
Capital letters |
|
What is selected in the maintenance level block for a job that is to be accomplished by another work center on board |
Organizational |
|
What is selected in a maintenance level block for a job from TY COM |
Fleet technical support |
|
What display is customized to your user category and placed in the chain of command |
My task |
|
What is selected in the maintenance level block for a job that the regional maintenance center is to accomplish |
IMA |
|
What is selected in the Maintenance Level block for a job at the shipyard or contractor is to accomplish |
Depot |
|
What block is used to state what is needed to correct the problem with the equipment |
Recommended solution block |
|
What type of FBR is required when shifting maintenance from one work center to another |
Category be[ technical] |
|
What instruction is the NAVOSH safety manual |
5100.19 |
|
What are components that must be turn in prior to receiving the replacement component and then shipped to depot maintenance level for repair called |
Depot level repairable (DLR) |
|
6641/005 M-5 note 1 States "omit step not applicable", neither step 2 or step 3 apply to the work center configuration. Step one is the only maintenance requirement that applies. What is the responsibility of the WCS to correct this issue |
Line - out step 2 and step 3 on the MIP and MRC and have the HOD initial line - out |
|
Which symbol is used to mark scheduled maintenance that was accomplished by a higher - level system test |
The sent symbol with explaining of the part system test |
|
Each tag - out log shall contain |
TUM, Index sheet, Active TOR's, instrument log sheet, clear TOR's |
|
Each tag out log shall contain |
Tums index sheet, active tors, instrument log sheet, clear tours |
|
What does a warning note on the MRC indicate |
Death or injury may result |
|
What is the 1st step when a danger tagged component is found out of position or a danger tag is found on the wrong component |
Report The condition immediately to the authorizing officer and ra rep |
|
Who is responsible to ensure that all equipment owned by the work center has the correct PMS |
Work center supervisor |
|
How is the 13 week accountability marked to show maintenance was not accomplished |
X |
|
What is start up maintenance |
Maintenance that consist of performing turn on procedures and restoring the Equipment to its ready for service condition |
|
What is an LGL |
Location guide list |
|
When must a rating block be strictly adhered to |
DCPO, SPO, or lists a specific NEC |
|
What is operational test maintenance |
Conducted to determine the operational condition of the equipment, its ability to function as designed, and to be integrated with other equipment to form a system |
|
What program is used to create an LGL |
Sked 3.2 |
|
What is the CVN70 hazmat instruction |
5100.6E |
|
What is an AER |
Admin Edfectivness Review |
|
Who signs the 13 week accountability at the end of the week |
WCS/DIVISION OFFICER/LCPO |
|
What department or division is responsible for editing work centers when adding parts, adding APL's, or changing work centers |
Supply/S-6 |
|
How is the 13 week accountability mark to show maintenance was accomplished |
Mp signs in the signature block, dates, and enters tag out information and notifies the was to have them X over the periodicity |
|
Which of the following reports are generated in sked |
Technical feedback report |
|
Where is the reason documented if maintenance item is not complete |
Flip page Report |
|
When the hod approves the cycle and the quarterly schedules they must be printed out and inserted into the 43P1 |
False |
|
What is the purpose of signing the 13 week report at the end of the week |
Verifies the CSMP has been reviewed |
|
Who approves the quarterly schedule |
Department head |
|
What are the 4 sked views |
Cycle, Qauarterly, Weekly, List |
|
When creating an LGL, what is the maximum amount of equipment that can be assigned that LGL |
1 Work day |
|
Why dose the work center supervisor sign the record of change page after force revision has been installed to the 43P1 |
Verification of the LOEP,MIP,MRC,EGL is complete |
|
How many valids are to be completed each week by a work center in a large department |
10 |
|
How many valids are to be completed each week by a work center in a small department |
5 |
|
Who is responsible for approving the work center schedules after creation or administrative changes are made |
Department head |
|
How is the 13 week accountability marked to show maintenance was partially or non-accomplished |
MP writes the reason why on the reverse side and notifies the wcs to have them mark a circle around the periodicity |
|
What must be annotated on a MIP in regards to a split MIP where maintenance requirements are performed by another work center |
The maintenance requirements will be lined out in the responsible work center code will be written to the right of the item |
|
Who is responsible to ensure that all equipment own by the work center has the correct PMS |
Work center supervisor |
|
Urgent technical feedback reports are filed when |
PMS discrepancies could have a detrimental the fact on personal safety , could result in significant equipment damage |
|
Which symbol is used to mark schedule maintenance that was accomplished by a higher level system test |
The cent symbol with explanation of the parent system test |
|
What are components that must be turned in prior to receiving the replacement component and then shipped to depot maintenance level for repair called |
Depot level repairable (DLR's) |
|
What block is used to state what is needed to correct a problem with the equipment |
Recommended solution block |