• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/15

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

15 Cards in this Set

  • Front
  • Back

Processes of erosion

Processes of transportation

Stages of a river

What is in the upper part of the river



Ox Bow Lakes are in the lower section, what features does each part have


Meanders are in the lower section, what features does the cross section have have



What does a hydrograph do

It tells you how long it takes for the rain to get to the lakes

It tells you how long it takes for the rain to get to the lakes

Name the characteristics of a flashy hydrograph

Frozen Ground


Heavy Rain


Urbanisation


Deforestation


Up and Down Ploughing


Impermeable Rock

Name the characteristics of a subdued hydrograph

Normal ground


Light Rain


Countryside


Lots of Forest


Permeable Rock

CASE STUDY


Water taken from lake ______ to Liverpool

V ery


Y ummy


R aisins


N ice


W ith


Y oghurt

CASE STUDY Lake Vyrnwy

2 chapels, 3 inns, 10 farmhouses and 37 houses were lost


The dam was expensive to build and requires annual maintenance

Case Study Mississippi

Year- 1993


Deaths- 43


Evacuated- 50000


Land Flooded- 26000 KM


Crops Lost $2.44 Billion


Total Cost- $12 Billion

Case Study Bangladesh

Year- 2004


Deaths- 750+


Homeless- 7 Million


Crops Destroyed- 2 Million Hectares


Homes Destroyed- 2.6 Million


Total Cost- £7 Billion

Case Study Mississippi Solutions

Levees

Concreete Lined Channels


River Straightening


Dams on Tributries


Repair Levees


Sand bags




Overall Hard Engineering

Case Study Bangladesh Solutions
Cyclone Shelters

Mega Phones/ Radio Transmitions for Warnings


Better Forecasting




Overall Soft Engineering