- Front
- Back
By what name do we refer to the space between any points A and B |
Line Segment |
|
The ratio of size of drawn objects compared to their actual counterparts is called |
Scale |
|
A basic orthographic projection shows an object from how many different views |
FOUR |
|
What name do we give to a roofless cutaway of a build from a bird’s eye view? |
Floor plan |
|
What is the web address for the computer-aided drafting-building information modeling (CAD-BIM) library? |
HTTPS://cadbimcenter.erdc.dren.mil |
|
Which technical drawing set contains a general layout of the construction project? |
Civil |
|
Which engineering discipline is concerned with the circulation of liquids or gases, such as water or air? |
Mechanical |
|
In the modeling file naming convention, what comes last just before the file extension? |
Sheet sequence number |
|
Which of these is NOT found in the project code portion of the model file naming convention? |
Initials of project draftsperson |
|
At a minimum, the title block includes all the following EXCEPT |
Storage index |
|
What type of detail identifier marks the location of general sections or typical methods of construction? |
Section |
|
Who completes the constructability review? |
Engineering flight |
|
When does a construction inspector begin recording construction progress data? |
As soon as a project awards |
|
Which document contains the start date and duration/performance period of contract |
Notice to proceed |
|
What document does the base civil engineer (BCE) use to clear execution of work on an Air Force Base? |
Air Force Form 103 |
|
Which contract type allows the base civil engineer (BCE) to have a construction contractor already under contract? |
SABER SIMPLIFIED AQUISITION OF BASE ENGINEER REQUIREMENTS |
|
What does the army call there SABER? |
JOC Job order contracts |
|
Who decides if a project goes competitive bid, indefinite delivery indefinite quantity or SABER |
Engineering flight chief |
|
Which part of the statement of work provides a detailed statement of what we expect to be done during the project? |
Scope of work |
|
Where in the statement of work are the quality expectations and team descriptions? |
Work requirements |
|
Who usually fills out and submits the Air Force Form 332? |
Facility manager |
|
Who approves the department of defense (DD) form 1391 |
MAJCOM commander |
|
When receiving an Airforce form 3000 from a contractor, which of these do you NOT do |
Record submittal on AF form 66 |
|
Which specifications format does the department of defense use instead of the Construction Specifications institute master format? |
Unified Facilities Guide Specifications |
|
In which unified facilities guide specifications division would you find fire suppression categories |
21 |
|
What is your main source of information when creating a bill of materials |
Construction drawings |
|
Which government handbook gives detailed instructions for properly completing government estimates? |
UFC 3-740-05 |
|
Which tool allows contractors to divide a project into work elements over a given period? |
Contract progress schedule |
|
What tool does base contracting use to authorize release of payment to the contractor for a period of performance? |
Contract progress report |
|
What Air Force information management tool, completed by an instructor, is used to prove or disprove contractor performance |
AF IMT 1477 |
|
Which form provides an accurate accounting of the changes made to each system after construction completion? |
DoD form 1354 |
|
What guides government employees and defines limitations and areas of responsibility for all parties involved in a contract? |
FAR FEDERAL ACQUISITION REGULATION |
|
Which component of the federal acquisition regulation provides guidance on the solicitation or acceptance of gifts favors from contractors |
Gratuities |
|
What system is used to classify soils based on the size of individual particles? |
Unified soils classification system |
|
When sieve sizes have openings smaller than 1/4 inch, how are they identified? |
Number of openings per inch |
|
What is the name of the bulky soil subdivision most often found near streambeds or beaches? |
Rounded |
|
What quality of gradation is a soul with a good range of all particle sizes between the largest and smallest for that sample |
Well |
|
What factor has varying effects on the cohesion of soil? |
Moisture |
|
What do we call the moisture content at which a soil stops being rigid and becomes moldable? |
Plastic limit |
|
Which name do we refer to souls passing the number 200 sieve |
Fines |
|
Which test compares the level of material settled at the bottom of a water-filled jar? |
Sedimentation |
|
What does the soil sample roll test measure? |
Plasticity |
|
Performed on materials passings the number 40 sieve, which test helps determine whether a soil is clayey (C) or silty (M) |
Dry-strength |
|
When conducting the shine test, a definite shine indicates what type of clay? |
Highly plasticity |
|
The equation, w= (Ww/ Ws) x 100, used in conjunction with the oven-dry method, determines which soil characteristic? |
Moisture content |
|
What soil characteristic does the dynamic Cone Penetrometer measure? |
Soil shearing resistance |
|
Which of these is not an element of an asphalt mix? |
Rocks |
|
Upon what factor is the volume of a given sample of asphalt most dependent? |
Temperature |
|
Which of these is NOT a concrete test method |
Marshall |
|
What kind of depiction of a building provides a better picture of the final product? |
Three-dimensions |
|
Building information modeling combines the best of two-dimensional and three dimensional drafting with the best of |
GIS |
|
What do we call the relationship between the parts of a project and their environment? |
Scale |
|
What is the name given to the ability to highlight or subdue aspects of a drawing? |
Exaggeration |
|
Which tool allows you to select an object or overall model and rotate it throughout the X,Y, and Z-axes? |
Three dimensional orbit |
|
What do we add to change a four-dimensional building information modeling design into five- dimensional? |
Cost estimates |
|
What do we add to change a five-dimensional building information modeling design into a six dimensional? |
Maintenance |
|
In building information modeling what name do we apply to rules that determine an objects geometry? |
Parametric Modeling |
|
Which form of solid modeling represents a shape by a set of mathematical functions? |
Constructive Solid Geometry |
|
What do we call the applications used to create estimates, model an object, or create a schedule? |
Tools |
|
What do we call a group of applications produced by a vendor or vendors that interact to create a model? |
Platforms |
|
Who is currently the primary source for construction document creation, storage, and maintenance at an installation? |
Engineering |
|
What is a flexible, adaptable model of a building or building parts already modeled and ready for use? |
Dynamic prototype |
|
Which department of Defense standard do spatial validation report space naming conventions follow? |
Facility space utilization conventions |
|
What work structure is a common environment that we use across agencies? |
Architectural engineering and construction |
|
Which file extension is the suffix for a revit template file |
.rte |