What does the M character designate in the 2M0XX career field? |
Missile maintenance |
|
Where do the SNCOs in your career field derive the information to develop the SKT? |
Career development course |
|
Which of the following is not a function of the career field education training plan? |
Tracks ancillary training |
|
According to documentation in the CFETP what requirements must you meet to be awarded your 7-skill level? |
Be certified on all 7 level core tasks, and complete your craftsman CDC |
|
Who is responsible for inspecting troubleshooting and repairing hoists as well as certifying pneumatic and hydraulic components? |
MAPS |
|
Which statement best explains the authority to launch ICBMs? |
The president has the authority to launch a missile attack but AfGSC has the means of delivery |
|
Remove and replace maintenance performes at the LF and LCC minimizes the ICBM weapon system downtime and contributes to which strategic characteristic? |
High in commission rate |
|
What combination of LCCs and LFs make up one missile flight |
One LCC 10 LFs |
|
How many LFs can a LCC control? |
All those in it's squadron |
|
The necessary thrust to launch a MinuteMan 3 missile into a prescribed trajectory is provided by |
3 stage solid propellant booster |
|
What is used to drive the exhaust gas generator in the MinuteMan 3 second stage motor in order to accomplish missile roll? |
Solid fuel exhaust gases |
|
Which components aerodynamically join the MinuteMan 3 motor stages and provide stage separation? |
Aluminum alloy interstages |
|
The RS shroud assembly is separated by a rocket motor located in the |
Forward shroud |
|
What component in the MGS provides reports of missile and ground equipment status during ground operations? |
Missile guidance computer |
|
What feature prevents incorrect mating of the fill valves to the PSRE oxidizer and fuel storage tanks? |
Difference in the fill and drain fittings on each storage tank |
|
What area/facilities would you find in the missile support area? |
Weapons storage area, missile transfer building, and proofload test facility |
|
The primary method used for shipping missile downstages from depot to the missile transfer building is by |
Road or highway in a missile transporter |
|
What is the primary mission of a MAF? |
Housing the missile combat crew officers |
|
If personnel are requesting access to the LCC the |
SCC must positively identify and authorize all personnel |
|
All air that enters the MAF clean room must pass through a |
CBR filter |
|
How is vertical movement of the launcher closure door prevented |
Mated beveled edges and weight |
|
What design feature permits limited motion between the launch tube and equipment room without danger of major structural damage |
6-8 inch rattle space |
|
What component is lowered to gain access to the upper LER |
Secondary door |
|
What two activities merged together to form AFGSC? |
ICBM forces and longer range bomber assets |
|
The AFGSC mission supports the US |
President and combatant commanders |
|
The 8th AF plans and executes nuclear deterrence through the use of |
Long range bombers |
|
What combatant command does the 20th AF fall under as Task Force 214? |
USSTRATCOM |
|
What 20th AF logistics division section puts together maintenance data analysis and generates weapon system metrics? |
ICBM readiness |
|
What 20th AF unit operates the ICBM center of excellence? |
620th missile operations flight |
|
The first level of command where all of the subordinate levels of command are located on the same installation is known as a |
Wing |
|
A typical missile wing is comprised of |
Operations, mission support, and medical groups |
|
Each squadron in the operations group is responsible for |
Monitoring and controlling 50 LFs and 5 MAFs |
|
When a periodic maintenance schedule is set each year it should not deviate by more than |
60 days |
|
The plans and scheduling section holds daily meetings to |
Coordinate the next days actions |
|
The MMOC ensures maintenance teams do not exceed their timelines by |
Tracking teams arrival and departure times |
|
What section provides central oversight over all IMDS related functions? |
Data analysis |
|
What is MAPS responsible for regarding the proofload test facility? |
Operations and maintenance |
|
VES must maintain records of? |
Inspections and calibrations of equipment |
|
One purpose of a FMT team is to |
Replace brine chillers |
|
While on a LF an EMT might perform |
Repairs on emergency storage batteries |
|
The verification and checkout equipment course provides training on how to |
Operate specialized equipment that gathers data from an air launched cruise missile |
|
Who is in command of the LF and MAF at all times? |
Missile combat crew |
|
Who serves as the maintenance groups focal point for enlisted Manning? |
Maintenance group commander |
|
What must the NCOIC provide to VES for known maintenance dispatches? |
Equipment load lists |
|
To support US military operations and national security objectives spacelift operations are conducted to augment or reconstitute space based capabilities along with providing for their |
Deployment and sustainment |
|
Who is responsible for making sure assigned spacelift and support equipment remains safe serviceable and properly configured to meet mission needs? |
SMT |
|
What subsystem provides a mechanical base for the satellite vehicle? |
Structural |
|
What directs the exhaust plume of the launch vehicle away from sensitive ground support equipment |
Flame trench |
|
Final assembling of the satellite vehicle is performed in the |
Payload processing facility PPF |
|
What AFRL directorate finds new ways to strike the enemy through aerospace avenues? |
Air vehicles |
|
What is the period called when critical functions are in a state of readiness without dependence on normal environment control support? |
Emergency survival |
|
What would be an example of a hardness critical item that protects other equipment performing a hardness critical function |
Shock isolators |
|
A large percentage of energy from a nuclear detonation results in |
Air blast effects |
|
Which characteristic greatly influences EMP at the LER liner? |
Conduit shielding |
|
Over one third of the energy from a nuclear explosion is emitted in the form of |
Heat and light |
|
What circuit protection holds the operations of a mission critical circuit in a known operating mode until after EMP or radiation has subsided |
Circumvention/reset |
|
What type of shock isolators do the Wing 3 and 5 LCCs use |
Air filled pendulum |
|
What do penetrating lines act as to direct EMP into the LCC? |
An antenna |
|
How is installed equipment that generally considered to be fragile or of high value to the weapon system installed? |
Shock mounted |
|
Who can provide technical assistance for all installation hardware or maintenance requirements not specifically covered in TOs or CE manuals? |
Ogden air logistics complex |
|
When installing an ESA vault RFI gasket what percentage of the gaskets width must be in contact with the hatch cover |
75% |
|
Which deficiency report classification would be appropriate if the reported defect is likely to result in failure? |
Major |
|
Which is an example of a product quality deficiency? |
When a component is installed and fails right away |
|
What deficiency report category is used for deficiencies that might hinder the maintenance process but allows job completion? |
Category II |
|
What step in the deficiency reporting process reviews deficiency reports for proper categorization validity correctness of entries and accuracy? |
Screening point |
|
Which operational event phase of the IMDS subsystem provides the capability for periodic reports of mission accomplishment? |
3 |
|
What process provides maintenance managers at all levels with information on jobs performed by each workcenter |
Maintenance data documentation process |
|
What term is annotated in the cert status of the MNCL |
Nuclear or design |
|
At what organizational level are operating instructions developed for use? |
Unit |
|
What information does a an inspection work card contain? |
Specific pass or fail criteria |
|
Before a preliminary TO can be used for maintenance on the weapon system it must |
Have it's procedures verified with oversight from the technical content manager |
|
What determines how a technical order will be numbered? |
The first set of numbers/letters that identify the category |
|
What information is located in the bottom right hand corner of a TOs title |
The latest change number and the date it was published |
|
What important information is contained in the component replacement and adjustment table of a TO? |
What mode of operation the system must be in |
|
What two types of CE manuals are used together? |
System and equipment |
|
What information is provided in a civil engineering manual master change log? |
Procedures for performing one time inspections |
|
CE manual improvement reports are submitted for all except |
Temporarily bypassing system components |
|
What information is entered into block 2 of an AFGSC form 272? |
TODO or TMCM office symbol and mailing address |
|
What information is entered into block 6 of a AFGSC form 272? |
Page or range of pages that will be changed |
|
What information is entered into block 9 of a AFGSC form 272? |
A description of the deficiency |
|
Who completes block 11a of a AFGSC form 272? |
QA evaluator |
|
Upon what principle does a hydraulic system operate? |
Force is distributed equally throughout a contained body of liquid |
|
PT hoist has a maximum lifting capacity of |
3000 lbs |
|
The inch button lowers how much of the hoist |
0.030 inch |
|
The TE tractor PTO unit |
Drives the auxiliary hydraulic pump |
|
The TE APU preheated elements need to be energized for 30 seconds prior to starting in cold weather to preheat the |
Intake air |
|
What is the purpose of the TE rail restraints |
Secure the downstage during transport |
|
The TE emergency flow limiter manifold prevents the |
Container from freefalling if a hydraulic line fails |
|
Identify the purpose of the MT semitrailers front and rear access doors |
Provide for missile loading and unloading |
|
The MT semitrailer winch is used for |
Loading and unloading a downstage from the semitrailer |
|
The purpose of the hydraulic pressure charging set is to service the |
Shock isolators and the MSS with silicon fluid |
|
Select the purpose of the hydraulic purge set |
Collect fluid samples from or decontaminate the TE hydraulic system |
|
Identify the purpose of the CVA control unit |
Direct the flow of nitrogen gas from the regulator to the LC actuator cylinder |
|
The PAC controls the temperature and humidity of the |
MT and TE |
|
Why is the missile grounded during downstage handling operations |
Components are sensitive to ESD |
|
Identify the purpose of the shipping links that are installed on the first stage nozzles during transit |
Keep nozzles in a fixed position to avoid possible damage |
|
The missile sensaphone monitoring system monitors the environment inside the container the missile is stored in and automatically |
Dials a phone number if the temperature is out of tolerance |
|
Identify the purpose of the leveling jacks used by MHT |
Adjustment of TE and MT containers prior to a roll transfer |
|
The optical alignment set used by MHT ensures the |
Alignment of the TE and MT containers prior to a roll transfer |
|
The skirt umbilical provides |
A pathway for electrical signals and power to flow between the D-Box and the first and second stage missile boosters |
|
When the lower umbilical is disconnected from the missile the MCC will |
Receive a missile away indication from that LF |
|
What is the first step of a LF shutdown |
Verify the SCS is locked and the safe arm indicator shows S |
|
Identify the first step of LSB electrical isolation |
Place the MPP power switch to off |
|
What is the recovery strap used for when accomplishing forced entry procedures following a b plug lockout |
Prevent the cable pin from falling onto the missile |
|
How is the down stage lowered and raised |
Through the use of four sling rods that are bolted to the downstairs adapter ring in the TE |
|
What does the first stage motor consist of |
Steel case with aft closure, 4 nozzles, and solid propellant 6 point hollow core design |
|
What does the second stage motor consist of |
Titanium alloy motor case. One nozzle, thrust vector control system |
|
What does the 3rd stage motor consist of |
Fiberglass two nozzles and thrust termination ports |
|
AFTO 22 emergency priority is when |
If not corrected would result in a fatality or serious injury to personnel or extensive damage |
|
How many gallons in the TE hydraulic reservoir |
115 main 10 auxiliary |