* The CM could either be: a member of the staff of the
Owner, an independent individual, or a firm hired by t Owner to manage the Construction of the Project with regards to Quality, Workmanship and Cost. |
1.5 - 3 % of
Project Construction Cost |
|
SERVICES:
1. Coordination and Supervision 2. Cost and Time Control 3. Quality Control of Work 4. Keeping of Records CONDITIONS: |
null
|
|
CONDITIONS:
A. The CM may hire the CSG under his employ or may supervise the CSG hired directly by the Owner. B. The CM shall not involve himself directly with the work of the Contractor. C. The CM shall not impose methods, systems or designs that will substantially affect the Contruction schedule and impair the design concept of the Architect. D. The CM is directly responsible to the Owner on all aspects of the Construction work: Programming, Coordination, quality & cost control and time management. E. No Liability in case equipment fail to function or if a portion of the building collapses due to: a. deficiencies in plan / design PROVIDED the CM did n participate in the plan / design review. b. deficiencies in the manner of Construction PROVIDED the CM faithfully discharged his functions during the Construction / Project Implementation. |
null
|
|
QUALIFICATIONS:
a. RLA with Managerial capabilities & extensive experience in the field of Construction. b. RLA who are Contractors or who have already been in responsible charge of Construction. |