Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
10 Cards in this Set
- Front
- Back
Name three subsystems of ATC netword |
AtP,ATS,ATO |
|
This system monitors system status and provides the appropriate controls to direct the operation of trains. Maintain adherence to the operating schedule |
Automatic train supervision |
|
This system provides safe train separation |
AtP |
|
What is mode 1 |
Automatic train operation |
|
What is mode 2 |
Manual operation with Atp and speed commands |
|
What is mode 2 lvl 2 |
Man operation with atp and no speed commands |
|
What is mode 3 |
Man operation with no speed commands and no atp |
|
Purpose of gap trains |
To help with overcrowding, to help maintain schedule, to replace bad trains |
|
Name the train numbers for each line |
100=red 300=yellow 400=blue 500=green 600=silver 700= non revenue, transport 800= training train 900=orange |
|
Name beginning and end of each line |
Red=shady Grove to Glenmont Yellow= Huntington to greenbelt Blue= Franconia to largo Silver= wiele Reston to largo Orange=Vienna to new carrolton Green=branch to greenbelt |