• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/10

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

10 Cards in this Set

  • Front
  • Back

Name three subsystems of ATC netword

AtP,ATS,ATO

This system monitors system status and provides the appropriate controls to direct the operation of trains. Maintain adherence to the operating schedule

Automatic train supervision

This system provides safe train separation

AtP

What is mode 1

Automatic train operation

What is mode 2

Manual operation with Atp and speed commands

What is mode 2 lvl 2

Man operation with atp and no speed commands

What is mode 3

Man operation with no speed commands and no atp

Purpose of gap trains

To help with overcrowding, to help maintain schedule, to replace bad trains

Name the train numbers for each line

100=red


300=yellow


400=blue


500=green


600=silver


700= non revenue, transport


800= training train


900=orange

Name beginning and end of each line

Red=shady Grove to Glenmont


Yellow= Huntington to greenbelt


Blue= Franconia to largo


Silver= wiele Reston to largo


Orange=Vienna to new carrolton


Green=branch to greenbelt