• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/57

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

57 Cards in this Set

  • Front
  • Back
1. The boom angle indicator shows boom angle and:
A. Is used along with boom length to determine radius and boom height.
2. Telescopic booms are raised and lowered by:
C. Hydraulically powered cylinders attached to the bottom of the boom base section and the crane structure activated by hydraulic motors, pumps and valves.
3. The construction and breaking strength of wire rope determines:
D. Safety factor and safe working load
4. Regular constructed crane hoist wire rope shall be taken out of service when any of the following conditions exist:
D. All of the above
5. What is the safety factor for rotation resistant hoist wire rope?
C. 5.0 to 1
6. What is the safety factor for regular lay hoist wire rope?
B. 3.5 to 1
7. What is the safety factor for rigging gear (chokers and slings)?
C. 5.0 to 1
8. What is the safety factor of hoisting chain?
C. 4

9. What grade alloy steel chain should be used for hoisting slings?
C. 80
10. What is the SWL of RRL 6x25 IWRC Hoise Wire Rope?
A. 3.5 to 1
11. What is the SWL of boom hoist wire rope?
A. 3.5 to 1
12. What is the Nominal Strength of Wire Rope?
B. The published catalog strength calculated by a standard procedure.
13. What is a two-leg bridle?
C. Two wire rope slings attached by lifting ring
14. Standing wire ropes must be replaced if they have more than how many broken wires in one strand?
D. All of the above
15. According to OSHA regulations, what is the minimum number of full wraps of wire rope that must remain on the hoist drum in all service conditions?
C. Two
16. By order of hitch strength, which is the correct answer?
B. Basket, vertical, choker
17. When the number of layers of rope on a drum increases the:
A. Maximum line pull decreases
18. How many randomly broken wires in one lay must there be to remove a running wire rope from service?
D. 6
19. What is the safety factor required when using non-rotating wire rope and lifting a personnel platform?
D. 10
20. What is the minimum design factor required for a right regular lay main, boom or auxiliary hoist rope?
B. 3.5
21. If the SWL of a cranes wire rope is 10,000 lbs using one part, what is the SWL when using 4 parts?
D. 40,000 lbs
22. How many broken wires must be present in one strand of one lay for running wire rope to be removed from service?
A. 3
23. What is the standard hoist rope used on most American made cranes?
A. Right regular lay
24. When using cable or nylon Bridle it is important to remember:
B. The lower the spreader angle the greater the tension
25. What is the minimum number of broken wires acceptable before replacement on a standing wire rope away from end socket?
C. 2
26. When a lattice boom truck crane is operating on properly set outriggers, the tipping axis is located at the:
D. Point where the outriggers touch the ground
27. A crane loses stability when its leverage or moment on the load is:
A. Less than the load's leverage or moment on the crane.
28. Each outrigger pad and its blocking should be sufficient to support:
B. The total weight of the crane and its load
29. How many broken wires are permitted at the end connection of a pendant before it must be taken out of service?
D. 1
30. When a lattice boom truck crane that is properly set up with no front outrigger and the boom is positioned over the front, the combined center of gravity of the carrier and upper works will move:
B. Closer to the axis
31. How does the effective weight of a stowed jib/extension relate to the actual weight of the jib/extension?
A. Lower than the actual weight
32. According to ASME B30.5 mobile crane standard, how many randomly distributed broken wires in rotation-resistant hoist wire rope are cause for considering replacement of the rope?
D. 2 broken wires in 6 rope diameters
33. Using the preferred method of installing wire rope from a reel onto a hoist drum, the rope runs from the:
C. Top of the reel to the top of the drum
34. The tipping axis of a crawler crane is:
A. at the centerline of the idler or sprocket
35. Eccentric main boom tip reeving causes which of the following:
C. Twisting or distortion of the boom
36. How many broken wires must be present in one strand of one lay for running wire rope to be removed from service?
A. 3
37. A frequent inspection is:
B. Daily to monthly
38. A periodic inspection is:
A. Monthly to annually
39. Cranes idle for more than 6 months must have ____ inspections performed.
A. Frequent and periodic
40. Crane hooks must not be twisted in excess of:
A. 10 degrees
41. A crane hooks throat open must not exceed:
B. 15% of its original size
42. What is the "jib offset"?
A. Jib angle to the boom
43. You are required to pass a physical exam every ____ years according to ASME B30.5?
C. 3 years
44. When operating a mobile crane you inspect your running wire rope at least:
A. Daily
45. Line pull is:
A. The amount of weight a drum will hoist for a given layer
46. It is important to inspect rotation resistant wire rope more frequently because:
B. Internal damage will occur more frequently.
47. It is important to know when lubricating wire rope that the lubricant must:
A. Not hinder visual inspection
48. Breaking strength divided by the design factor equals:
A. Safe working load
49. How often should all running ropes in service be visually inspected?
A. Once each working day
50. Referring to the standard format of sling load charts, the angle between the top of the load and the sling leg is called the:
D. Horizontal angle
51. During disassembly of a long boom, the Pendant lines are connected at the maximum cantilever point and the Pendant lines have taken appropriate weight of the boom. Which pins should be removed first?
C. The bottom pins ahead of the cantilever point
52. On a lattice boom crawler crane, the main boom length is measured from the:
C. Center of the boom heel pins to the center of the boom tip sheave.
53. Manufacturer specifications permit only a certain amount of boom to be suspended out past the connection point of the pendants during assembly or disassembly of the boom. The portion of boom that is suspended in this way is called the:
C. Cantilever length
54. According to OASHA maximum jib backlash is how much?
C. 5 degrees
55. Wire clips used in conjunction with wedge sockets must be attached to what?
A. The dead end of a rope
56. Which of the following is classified as a standing wire rope?
D. Pendant line
57. The dead-end of a wire rope above the wedge socket must extend a minimum of 6 times the rope diameter or:
B. 6 inches