• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/10

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

10 Cards in this Set

  • Front
  • Back
  • 3rd side (hint)

When are tradesman responsible for informing NCOIC?

-When each stage of a maintenance task is complete.



-When close supervision is necessary.



-when they have any doubt about correct methods or techniques being used



-whenever they discover or suspect a fault.

4



FC DC

When are pre installation inspections required?

-Approved documentation


- certification of serviceability


- identifying details


- life details my


- physical characteristics


-damage


- software

Acid lps

When are progressive inspections required?

Located


Locking


Reconnect


Hiding work


completion of work



New procedure


Fod


New procedure being implemented


Training being recieved

L,L,R,C,H,F,N,T

Define supervision?

Supervision is the control exercised over a tradesman during the maintenance activity.

Supervisor are responsible for ensuring ?

Publication are


-in good repair


-fully amended


-applicable


-complete



Personnel are


-briefed


-approved methods being used


-corrected


-allocated sufficient time



Work PROCEEDs as scheduled



SS and RPs are read



GSE is


-correct for task


- serviceable



Hazards are identified and





P,P,P,S,G,H



I,F,A,C and BACT

When is close supervision required?

When the publication calls for it



When not authorized on 125



When tradesman request it



When the supervisor request it.

Two books , two people

The process of inspection and supervision are separately defined as

Inspection is directed towards the quality of work



Where as supervision is directed towards the tradesperson.

Tradesman signature certifies

Publications


SSandRPs


Pre installation



Briefed


Loose articles


Refitt and close


Tool control


Disconnect and removed



GSE




9, PSP BLRTD G

Counter signature certifies

Correctly supervised


Inspected at appropriate times


Quality of work is acceptable


Done all work


IIVAS raised

CIQDI

Define Technical Competency

Technical Competency is defined as the ability to perform a particular skill, correctly and safely, to a prescribed standard.