• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/183

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

183 Cards in this Set

  • Front
  • Back
ZLD1.2
Zero Liquid Discharge Chemical Feed-
ABR1.1
Aux Boiler-Use this system for aux boilers producing 50,000 lb/hr steam or less.
ACC1.1
Air Cooled Condenser-Power plant with a steam turbine will have either an ACC or a Condenser (CDN). Include the condensate receiver tank in the ACC package. There should be no CDN package if project has an ACC.
ACC1.2
Air Cooled Condenser - Fans-
ACH1.1
Air Cooled Heat Exchanger/Fans-Fin fan coolers. Used for many CT projects but can be used for other cooling applications. Base cost for ACH System is for F Class CTG
ACW1.1
Aux Cooling Water-
AHA1.1
Anhydrous Ammonia Unloading/Storage/Forwarding System-
APH1.1
Air Preheating System-Added for Naughton Secondary Air Duct Coil System-coal plant
APH1.2
Glycol Circulating Loop-
APH1.3
Duct Coils/Outage Tie-In-
APH1.4
Steam Supply to Heater-
AQA1.1
Aqueous Ammonia Unloading/Storage/Forwarding System-19% Aqueous Ammonia System. 19% aqueous is typical but ammonia system can also be urea (URE) or anhydrous ammonia (ANH).
ARM1.1
Condenser Air Removal-This system removes non-condensable gases from steam condensers
ASH1.1
Waste Ash Blowers/Exhausters-
ASH1.2
Waste Ash Hoppers and Transport Piping-
ASH1.3
Waste Ash Silo-Includes fluidizing blowers, bin vents, and hopper isolation valve
ASH1.4
Waste Ash Silo Unloading/Disposal-
ASH1.5
Outage Tie-ins/Other-
AXS1.1
Auxialiary Steam System-Steam system supplying steam to turbine seals, air ejectors, heat. Steam may be fed from either auxiliary boilers or from let down stations taking steam from the process.
BAS1.1
Bottom Ash System-Includes both wet and dry bottom ash systems. Includes removal, transport, dewatering, unloading, storage, etc. Added to capture costs for the Ghent Project. Include economizer ash system in this package too. Include subsystems as needed.
BAS1.2
Hydraulic unit-
BFW1.1
Unit 1 Boiler Feed Water System-Base system includes 2 pumps
BFW1.2
Unit 1 Boiler Feed Water Pump LO Unit & Piping-
BGH1.1
PJFF - Side A-Base system includes both halves of the baghouse.
BGH1.2
PJFF - Seal Air Blowers-
BGH2.1
PJFF - Side B-
BLR1.1
Unit 1 Boiler-Use this for boilers producing steam for power or process. These boilers are larger than an auxliary boiler.
BLR1.2
Unit 1 Boiler - Air/Gas Side-If required.
BLR1.3
Unit 1 Boiler - Water/Steam Side-If required.
BLR1.4
Unit 1 Boiler - Fuel Prep/Combustion-If required.
CAP1.1
Cathodic Protection-Impressed current cathodic protection. Does not include passive system. If system serves specific equipment go ahead and scope the cathodic protection panel into an existing package and eliminate CAP System.
CCF1.1
Boiler Chemical Feed-Steam cycle chemical feed. Indcludes chemical feed to condensate and boiler feedwater
CCW1.1
Closed Cooling Water 1-CCW system circulates water through the CTG and STG auxiliary skids. For AQCS projects the CCW is typically used to cool the air compressors.
CCW2.1
Closed Cooling Water 2-Use CCW2 for an additional closed cooling water loop if required. For example, at Haynes CCW was used for the LMS-100 cooling water system. The air compressors at Haynes had a separate CCW system that we do not want to get counted into CPA-01.
CDN1.1
Condenser-There will be no condenser TO package if there is an air cooled condenser (ACC). Include the condensate receiver tank in the ACC package.
CEM1.1
CEMS -Stack CEMS
CEM1.2
CEMS - U1 CTG (if bypass with 2 CEMS)-Use CEM-01.02 if there is bypass stack on combined cycle plant. Add CEM-02, CEM-03 for multiple stacks.
CHM1.1
Chemical Clean (Third Party)-Third party chemical clean of HRSG or power boiler using acid, ETDA or other process. Use this package only when EPC/Owner requires a thrid party chemical cleaning in lieu of the typical high pH chemical flush.
CIP1.1
NERC CIP Measures-Items in this package include physical portions of the work, or any pre-requsite testing, required to implement security of the control room and other areas covered by the North American Electric Reliability Council Critical Infrastructure Protection program. Additional features of existing systems required to meet NERC CIP (..IE additional relay scope in SWGR) will be included with the normal TO system.
CMG1.1
H2 & CO2 Compressed Gas System-Hydrogen & Carbon dioxide systems
CMG1.2
N2 Compressed Gas System-Nitrogen system
CMP0.1
Compressor Piping-
CMP1.1
Compressor -Large compressor for LNG, or other refrigeration loops. High Voltage Motor. Fuel gas compressors for CTG's carreid in the FGA system.
CMP1.2
Compressor - Lube Oil-Lube oil system for compressor
CND1.1
Condensate System-
CNV1.1
Conveyors-Include entire conveyance system. Include screens, samplers, etc. Include destination (IE coal silos, pile area, holding bin) in the package with the conveyor that discharges into it.
CPA1.1
Air Comp, Dryers, and Receiver -Base CPA system includes 2 air compressors, 2 dryers and an air receiver.
CTG1.1
Unit 1 Combustion Turbine & Generator-
CTG1.2
Unit 1 CTG Oil/Hydraulic System-Include lube, hydraulic flushes
CTG1.3
Unit 1 CTG Evap Cooler/Inlet Filter-
CTG1.4
Unit 1 CTG Waste Water Drain System-
CTG1.5
Unit 1 CTG Condensate recovery-LMS-100 machines have condensate recovery equipment. This subsystem is reserve for condensate recover if subsystem turnover is required. If possible, scope the condensate recovery system into the base CTG-01.01 package
CTG1.6
Unit 1 CTG Inlet Air Preheating-This can be system with a closed loop system using pumps to circulate glycol through heating coils at the CTG inlet and heat exchangers/heaters. Scope this as .05 if there is no condensate recovery system.
CWS1.1
Circ Water System-If plant has an ACC there will be no CWT system. Include cooling tower blowdown system in CWT-01. Simple cycle plants can have cooling towers, but not always.
CWS1.2
Circ Water - Fans & Superstructure Only-If plant has an ACC there will be no CWT system
CWS1.3
Circ Water Chem Feed-If plant has an ACC there will be no CWT system
DBU1.1
Unit 1 HRSG Duct Burners-Use 02DBU, 03DBU, for multiple units
DCS1.1
DCS Hardware - Pre-Outage-Break DCS system into further subsystems .03, .04, if system is to large for only two subsystems.
DCS1.2
DCS Hardware - Outage -
DCU1.1
DC & UPS Systems-DC Batteries and UPS. If connecting to existing Owner supply, then suggest putting those cables in DCS system or ELE system depending on the "TO" equipment for the cables rather than creating a book just for couple cables.
DSC1.1
SDA Unit 1-
DSC1.2
SDA Unit 1 Atomizers-Alstom has 3 atomizers per SDA, BTW has 1 per SDA.
DSC2.1
SDA Unit 2-
DSC2.2
SDA Unit 2 Atomizers-Alstom has 3 atomizers per SDA, BTW has 1 per SDA.
DWS1.1
Demineralized Water Storage, Forwarding Pumps & Piping-Does not include equipment or systems that "make" demin water. Includes forwarding pumps. Include demin storage tank
DWT1.1
Water Pre-Treatment-Includes equipment and systems to produce demineralized water from service water. May also take input water from city water or raw water. Does not include equipment required to make or store service water.
DWT1.2
Water Pre-Treatment Chemical Feed-
EEL1.1
HVAC and Misc.-120/208V Panels, Welding Recepts, Area Cranes & Hoists, Lighting, and Communications.
ELS1.1
Low Voltage SUS -SCR only project may have power fed from existing MCC's
ELM1.1
Low Voltage MCC's, (use a, b, etc)-SCR may or may not have ELE-03.
EMB1.1
Medium Voltage Bus (13.8/6.9/4.16kV)-SCR only project may have power fed from existing MCC's
EMG1.1
Emergency Generator-
FDF1.1
Fan A & Ductwork-
FDF2.1
Fan B & Ductwork-
FDF1.2
Fan A LO/Hyd System-
FDF2.2
Fan B LO/Hyd System-
FGS1.1
Fuel Gas System-Include main gas line and branch lines to CTG, Compressors, or final load. Include fuel gas separators, scrubbers in the CTG system, not FGS. Include .02, .03, etc. subsystems as needed.
FGS1.2
Fuel Gas to Building Heat-Include branch lines to building heat or other incidental loads.
FOA1.1
Fuel Oil System-Include for dual fuel CTG projects
FPA1.1
Fire Protection AG-Includes deluge, pre-action systems, fire detection, or any type of system providing Fire Protection or suppression.
FPU1.1
Fire Protection UG-This package is for the underground piping including hydrants. This may also include the fire water tanks and pumps if needed to flush the UG piping system.
GRD1.1
Ground Grid -This package includes all ground grid checks. Including those done in GRD-01.02.
GRD1.2
Ground Grid - Backfeed/Energization-This subsystem includes only ground grid necessary to energize electrical system
GSU1.1
Generator Step-up Transformer-Use 01GSU, 02GSU, for multiple units.
GYP1.1
Gypsum Processing-Use this for gypsum processing on wet scrubber
HLI1.1
Hydrated Lime Injection System-S03 removal system - Use same estimating quantities as PAC system
HLI1.2
Hydrated Lime Injection/Outage Tie-ins-
HOS1.1
Hot Oil System-Includes circulating pumps, heaters, piping and controls
HOS1.2
Hot Oil System-Storage, Makeup, and Fowarding-
HPS1.1
HP Steam-
HPS1.2
HP Steam - Drain Tank-Drain tank system recovering drains from the HP steam system. If provided. HPS/CRHHRH drains typically go to STG1.4
HRG1.1
HRSG 1-
HRG1.2
HRSG 1 Blowdown-
HTT1.1
Heat Trace-Area 1-
HTT1.2
Heat Trace-Area 2-
HTT1.3
Heat Trace-Area 3-
HTT1.4
Heat Trace-Area 4-
HTT1.5
Heat Trace-Area 5-
IDF1.1
Fan 1-
IDF1.2
Fan 1 LO/Hyd System-
IDF2.1
Fan 2-
IDF2.2
Fan 2 LO/Hyd System-
IDF1.3
Outage Duct Tie-ins-
INA1.1
Instrument Air System-Use this subsystem for equipment producing instrument quality air. If instrument air branches off of service air, use this subsystem for the first area.
INA1.2
Inst Air - Area 1-Include .03, .04, etc for more areas as required. Typically, each HRSG, each CTG, the STG, and WT will have their own INA1.x packages.
LHN1.1
Limestone Handling Unloading/Storage-
LNB1.1
Low Nox Burners-Row 1-May be part of AQCS Project. Base system is for one row with 8 burners per row
LMD1.1
Dry Lime Unloading/Storage/Transport-Includes sotrage silo and unloading. Can unload lime to the silo when this packages is commissioned.
LMD1.2
Dry Lime Transport Blowers to Bins-Includes transport blowers from storage to day bins. Include day bin for slaker (SDA) in this package. For NID this package includes blowers and piping necessary to commission blowers.
LMD1.3
Day Bins and Transport Piping -Side 1-Include day bins for 1/2 (side 1) of the NID. Can move lime to day bins when this package is commissioned.
LMD1.4
Day Bins and Transport Piping -Side 2-Include day bins for 1/2 (side 2) of the NID. Can move lime to day bins when this package is commissioned.
LPS1.1
LP Steam-
LPS1.2
LP Steam - Drain Tank-Drain tank system recovering drains from the LP steam system. If provided. LPS drains typically go to STG1.4
LQS1.1
Liquifaction System-Inludes the cold box
LQS1.2
Liquifaction System-Gas Conditioning-External conditioning skid and connecting piping
LQS1.3
Liquifaction System-Piping-Piping (including controls) that connects the cold box to compressers, expanders, and coolers. Separate package to facilitate cleaning.
LQS1.4
Liquifaction System-Drains and Vents-Package for drains and vents not required until hot commissioning.
LQS1.5
Liquifaction System-Loadout-
LVS1.1
LNG Vaporization-Inludes LNG piping, vaporizer and piping
LVS1.2
LNG Vaporization-Heating Loop-Includes system to provide heat to LNG vaporizer
NaC1.1
Sodium Carbonate Injection-URS sells this as SBSTM. Includes water tanks, reagent mixing tanks, forwarding pumps, and atomizers to inject in the flue gas. Typically injected upstream of the air heater, ammonia injection grid, and PAC injection. Mitigates SO3 like a Trona system.
NaC1.2
Manifold and Supply Piping-
NaC1.3
Reagent Storage and Skid-
NaC1.4
Softened Water System and Tank-
NEM1.1
NOx Emission Monitor-Includes emission monitors to monitor NOX and provide control signals to ammonia flow for injection in front of SCR. Very similar to a CEM but with fewer analyzers and less stringent QA requirements. Does not require certification activities like a CEM does.
NID1.1
NID Fluidizing Blowers-
NID1.2
NID Modules, as needed-
NID1.3
NID Modules, as needed-
NID1.4
NID Modules, as needed-
NID1.5
NID Modules, as needed-
NID1.6
NID Modules, as needed-
OFA1.1
Overfire Air -Row 1-May be part of AQCS Project. Base system is for one row with 4 ports per row
OWW1.1
Oily Water Waste-Use this for oil water separator and all underground piping that delivers fluid to it. Include the funnels in the UG piping. If the OWW serves as the plant drain system, then do not use the OWW system code rather than the PDR system code. If UG drains go directly to OWW, then include the UG drains in OWW and do not use PDR.
PAC1.1
Powder Activated Carbon-Mercury removal system
PAC1.2
Powder Activated Carbon/Outage Tie-ins-
PAF1.1
Unit 1 Fan A & Ductwork-
PAF2.1
Unit 1 Fan B & Ductwork-
PAF1.2
Unit 1 Fan A LO/Hyd System-
PAF2.2
Unit 1 Fan B LO/Hyd System-
PCP1.1
Electro-static Precipitator-For the most part, Electro Static Precipitators have been replaced by baghouses but use the ESP package for any projects where we are replacing or rebuilding ESP's.
PDR1.1
Plant Drains-Miscellaneous sumps for plant drains, including all underground piping and drain funnels. Typically discharges to an OWW, city sewer, or treatment. Use .02, .03 for subsystem on an extensive drain system with pumps as needed. If using this for a storm water sump use PDR-2 if there is a separate plant drain system. If UG drains go directly to OWW, then include the UG drains in OWW and do not use PDR.
PLT1.1
Plant - NOT SYSTEM SPECIFIC-This line item is for P6 use only.
PWS1.1
Potable Water-Typically has showers and eyewash stations. Use .02, etc. if there need to be more subsystems for larger systems.
RCA1.1
Recycle Ash Transfer/Storage-
RCW1.1
Recycled Water-This system handles recycled water, grey water, or other re-used water system. The operational function, quantities, equipment and P6 activities for this system are expected to be similar to a service water system. Use the RCW system if calling the water system SWT would cause confusion. If recycled water is used as input to water pretreatment use RAW.
RCW1.2
Recycled Water - Chemical Feed Skids-
RCW1.3
Recycled Water - Clarifier-Include clarifier as subsystem.
RHS1.1
Reheat Steam-
RWS1.1
Raw Water - Includes Tank/Pumps-Includes system to receive, filter and store raw or grey water that will be used as feed for service water. If there is a clarifier in this package include it in RAW-01.02 to capture those costs separately. If additional equipment to process grey water into service water is included additional .0x packages may be used if required.
RWS1.2
Raw Water - Chemical Feed Skids-In general, create a separate system for chemical feed skids, however, it is OK to include the skid in the .1 or .3 package if the skid is small and it makes sense to combine.
RWS1.3
Raw Water- Clarifier-Not all raw water systems will have a clarifier but use a separate system to reflect the extra effort to commission lime feeders, dewatering euqipment, etc.
SBS1.1
Steam Blow Temporary Piping-Include quantities, mhs, and costs to set up and restore from steam blow in this system.
SCR1.1
SCR-Includes dilution air fans, vaporizers, steam line, and tempering fans on combustsion turbine projects.
SCR1.2
Ammonia Flow Control System-On coal jobs, plan for separate package to allow checkout of dilution air fans, vaporizers, steam line, and tempering fans before the tie-in outage.
SCR1.3
Outage Tie-ins-Use this subsystem for outage tie-in at existing coal plant
SDR1.1
Sanitary Drain-
SLD1.1
Dry Lime Slurry Prep/Storage-
SLD1.2
Slurry Feed SDA 1-
SLD1.3
Slurry Feed SDA 2-
SLS1.1
Limestone Slurry Prep/Storage-Includes reclaim conveyor.
SLS1.2
Slurry Feed Scrubber Vessel 1-
SLS1.3
Slurry Feed Scrubber Vessel 2-
SMP1.1
Boiler Sampling System-Use 2.1, 3.1 etc when there are multiple sample panels. IE…...Use 1.1 for HRSG1 panel, 2.1 for HRSG2 panel, etc and SMP3.1 for a shared sample panel.
STG1.1
Steam Turbine & Generator-
STG1.2
Steam Turbine Oil/Hydraulic System-
STG1.3
Steam Seals and Drainage-
STG1.4
Blowdown Drains Tank-Drains tank taking drips from STG, Stop valves, and Main/HRH/CRH/LPS steam systems
STR1.1
Steam Turbine Drive-Use for back pressure turbines, pump drivers, etc
STR1.2
Steam Turbine Oil/Hydraulic System-Use for back pressure turbines, pump drivers, etc
SVA1.1
Service Air-Service air for general use. Service air is not dried air.
SWS1.1
Service Water Common/Subsystems-Service water system, general water use. The service water tank can also provide water for fire protection use. Pumps that forward water from the raw water tank to the service water system are included in SWT system.
SWT1.1
Service Water Treatment-Typically filtration and forwarding systems used to condition raw water before the service water tank. Include any chemical feed skids reuired for SWT in the SWT1.1 package.
SYD1.1
Switchyard-Use this code for switchyard commissioning if required, if required
UAT1.1
Auxiliary Transformer -Use AUX-02, AUX-03 for multiples. Same quantities and costs as GSU-01 and GSU-09. Gas plants may have all equipment scoped into GSU and my not require Aux packages.
ULF1.1
Ultrafiltration-Use this package for an ultrafiltration system. Funtionally ultrafiltration is part of the water treatment (WTM) system, but typically ULF can be turned over and as a functional sub-system and commissioned before the rest of the WTM system is ready. Include any chemical feed skids reuired for ULF in the ULF1.1 package.
URE1.1
Urea Unloading/Storage/Mixing-19% Aqueous Ammonia System. 19% aqueous is typical but ammonia system can also be urea (URE) or anhydrous ammonia (ANH).
WSA1.1
Wet Surface Air Cooler (WSAC)-
WSA1.2
Wet Surface Air Cooler (WSAC) - Fans Only-
WSA1.3
Wet Surface Air Cooler (WSAC) - Chemical Feed-
WSC1.1
Wet Scrubber and Recycle System-
WWT1.1
Waste Water Treatment/Disposal-Treatment of waste water before it leaves site. Use only if there is additional water treatment equipment above and beyond the equipment normally included in WTM-1.
WWT1.2
Waste Water Treatment/Disposal Chemical Feed-
ZLD1.1
Zero Liquid Discharge-Includes crystallizers