12 Cards in this Set

  • Front
  • Back

Essential equipment for visual inspection (3)

Torch


screw driver


mirror

Equipment to remain in enclosure to aid inspection 1/4 stepladders..

And or scaffolding

Equipment to remain in enclosure to aid inspection (2/4) Lig..

Lighting (a torch is used to supplement the lighting not replace it)

Equipment to remain in enclosure to aid inspection (3/4) Vac..

Vacuum cleaner and other materials for minor cleaning

Equipment to remain in enclosure to aid inspection (4/4)

Buckets of water, sponges, wipes in airlock to aid preliminary decontamination

Wet enclosures



The area should be clean and dry


(1/4)



Ground...

Groundwater seeping in - it may not be possible to get the area completely dry - consider use of pumps to prevent flooding - record information.

Wet enclosures The area should be clean and dry (2/4)



Leaking...

Leaking pipe - sort the problem before a full certificate of reoccupation can be given.

Wet enclosures The area should be clean and dry (1/4)



If indent....

If identified prior to work - may require use of small enclosure to strip area so that leak can be repaired.

Wet enclosures The area should be clean and dry (4/4) If occurs during work..

If occurs during work, area cleaned to enable plumber wearing suitable RPE / PPE to repair leak - then proceed with normal clearance when area dry.

Sprayed sealent - should not be used before visual inspection (1/3) May be used...



May be used to seal surfaces that may release non asbestos dust, but only analyst's discretion.

Sprayed sealent - should not be used before visual inspection (2/3) If already applied...

If already applied but still wet Stop the clearance. Issue failed certificate of reoccupation, indicating the reason. Sealant must be washed off and the area dried.

Sprayed sealent - should not be used before visual inspection (3/3) if already dry...

If already dry, issue failed certificate, consider way forward probably need to remove all dried sealant.