29 Cards in this Set

  • Front
  • Back

1.How is site access and usability identified an evaluated?

D.Job site inspection,taking measurements and comparing measurements to crane specs

2.Construction site hazards an restrictions such as electric power lines an piping are located by:

D.A pre-operational work site inspection and questioning the job site supervisor

3.What is the best procedure to follow when underground utilities may be present?

B.Contact local utility company

4.When arriving in the crane at the job site, the operator should first determine the condition of the:

B. Access roads

5. When preparing to set up a mobile crane for operation, the following steps must be taken by the operator?

D. All of the above

6.when working at ground level near a cellar wall,the cranes outrigger pads or tracks should be placed where?

B. At least as far back as the depth or height of the wall below ground

7. According to OSHA, accessible areas of the operating crane must always be barricaded within:

C. The swing radius of the rear of the rotating superstructure

8. If an operator is working in a new construction area, confirmation of the surfaces ability to support anticipated loads should be confirmed by what means?

C. Seeking advice from qualified engineer or site supervisor

9. What effect does the the proper use of mats,blocking or cribbing,an outriggers or crawlers have to the suitability of the supporting surface?

E. Better distributes an lessens loads on the supporting surface.

10. Pre-operational inspections are necessary and required:
D. To enhance crane safety by discovering discrepancies prior to operating.
11. When assembling or dismantling lattice booms, it is safe to work under the boom:
D. None of the above
12. Why use mats or cribbing?
B. To reduce ground pressure
13. When installing the boom pins, the pin should be pointing:
A. out away from the boom center
14. The proper way to calibrate a boom angle indicator is:
C. Using a level, raise the boom to horizontal and set the indicator at 0 degrees
15. During setup how do you determine machine clearances (counterweight, boom, and outrigger)?
B. Measure for correct distance.
16. What is not a good location for crane setup?
C. Above utilities
17. All hazards and potential problems should be discovered during the:
A. Pre-lift site inspection
18. The purpose of placing mats or cribbing under outrigger floats is to:
B. Distribute the downward force of the float over a large area.
19. Operating a crane with a long boom, on uneven ground, you should:
C. Block under the pad and keep a 90 degree angle between cylinder rod and pad.
20. When operating a T/T/ and extending outriggers from the upper, you should:
C. Make visual contact or post a signalperson.
21. Blocking (cribbing) may be placed under outrigger beams:
D. Never
22. When setting a crane up on outriggers, the wheels of the crane should:
B. Be just high enough off the ground to relieve the tires of crane weight
23. Timer mats work best when they are:
A. Bolted together
24. Work area access by unauthorized personnel is restricted by:
A. Barricades that shall be erected to prevent personnel from entering hazardous areas of the swing radius.
25. The crane operator determines working height, boom length, load radius and travel clearance by:
A. Identifying the responsible site supervisor and reviewing with him the planned working height, boom length, radius and travel clearance.
26. Which is the proper way to get on and off the crane?
A. Face the machine when climbing on or off, using 3-point contact.
27. When entering a site for the first time, what is the biggest concern?
C. Compaction of access roadway
28. What is the first thing an operator should do before going under a low pipe rack?
D. Post a signal person to check clearance.
29. Which of these conditions could be dangerous when operating a crane around newly constructed building?
B. Uncompacted soil.