Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
94 Cards in this Set
- Front
- Back
WHO DO YOU IMMEDIATELY REPORT A FIRE TO?
|
OOD, AND THEN EXTINGUISH IT RAPIDLY
|
|
WHAT ARE THE THREE COMPONENTS REQUIRED FOR A FIRE
|
1.combustable material 2. sufficiently high temperature 3. supply of oxygen
|
|
WHAT IS OXIDATION
|
when oxygen combines chemically with a burning substance
|
|
WHAT TYPES OF MATERIALS ARE PARTICULARLY SUBJECT TO SPONTANEOUS COMBUSTION
|
rags or papers soaked with animal fats, veggie fats, painst or solvents
|
|
WHAT IS FLASHPOINT
|
the lowest temperature at which a substance will give of vapors that will burn when a flame has been introduced
|
|
WHAT IS FIREPOINT
|
THE TEMPERATURE AT WHICH THE FUEL WILL CONTINUE TO BURN AFTER IT HAS BEEN IGNITED
|
|
SPONTANEOUS COMBUSTION OF OIL SOAKED RAGS OCCURS AT WHAT TEMPERATURE
|
the lowest temperature at which the vapors will burn without a spark or flame as the ignition source
|
|
WHAT IS THE FLAMMABLE RANGE OR THE EXPLOSIVE RANGE
|
inbetween smallest and largest amounts of vapor in air that will burn or explode
|
|
WHY IS CO2 AND HALON PREFERED FOR CHARLIE FIRES
|
it leaves no residue
|
|
WHEN IS CARBON MONOXIDE PRODUCED BY A FIRE
|
when there is not enough oxygen present to complete combustion of all the carbon in the burning material
|
|
WHAT HAPPENS WHEN 12%-74% BY VOLUME OF CO IS INTHE AIR
|
An open flame or spark will set off a violent explosion
|
|
WHEN IS CO2 PRODUCED BY A FIRE
|
When there is complete combustion of all the carbon in the burning material
|
|
WHAT PERCENT OF H2S IS NEEDED FOR AIR TO BECOME EXPLOSIVE IN THE PRESENCE OF A FLAME
|
4.3-46
|
|
WHAT GAS IS EMITTED BY FIRE RETARDANT PAPER WHEN EXPOSED TO TEMPERATURES OF 200 DEGREES
|
Hydrogen chloride (HCI)
|
|
WHAT GAS IS EMITTED BY FLEXIFLOOR TILE MT 202 WHEN EXPOSED TO TEMPS OF 400 DEGREES
|
Hydrogen chloride (HCI)
|
|
WHAT IS HCI AND WHAT IS THE AUTHORIZED SAFE LEVEL
|
hydrogen chloride, 5 ppm
|
|
WHAT GAS IS COLORLESS AND HAS AN ODOR OF DECAYING FISH
|
phosphine (PH3)
|
|
WHAT IS PH3, AND WHAT IS THE AUTHORIZED SAFE LEVEL
|
phosphene, .3 PPM
|
|
WHAT PERCENT OF OXYGEN IS NORMALLY PRESENT IN THE AIR
|
20.8
|
|
WHAT IS THE MOST COMMON WAY OF FIGHTING A FIRE
|
cooling, like with water
|
|
WHAT FIRE FIGHTING AGENT DISPLACES OXYGEN OXYGEN BY USING IT IN FOG FORM
|
water
|
|
WHAT SHOULD YOU DO BEFORE ENTERING A BURNING COMPARTMENT
|
reduce the heat and flame by liberal application of water fog
|
|
WHAT FIRE FIGHTING AGENT CAN BE USED IN TANDEM WITH AFFF
|
dry chemicals (PKP)
|
|
HOW DOES CO2 EFFECTIVELY EXTINGUISH A FIRE
|
by smothering
|
|
WHAT FIRE FIGHTING EXTINGUISHMENT CAN CAUSE ASPHYXIATION
|
CO2
|
|
WHAT CO2 EQUIPMENT IS LOCATED ON MOST SHIPS
|
15 pound bottles, 50 pound hose and reel stations, and 50 pound installed flooding system
|
|
HALON 1301 CHARACTERISTICS
|
colorless odorless gas with a density approximeately 5 x of air
|
|
WHAT MUST OCCUR FOR HALON 1301 TO FUNCTION EFFECTIVELY AS AN EXTINGUISHING AGENT?
|
it must decompose
|
|
WHAT PART ON THE NFTI CLOSES IF YOU POINT IT AT 140 DEGREES OR HIGHER
|
the automatic iris
|
|
IF YOU WANTED TO MAKE A DETAILED ASSESSMENT OF A FIRE, WHAT MODE WOULD YOU CHOOSE?
|
chop
|
|
WHERE IS THE QUICK BLOW FUSE LOCATED AT ON THE NFTI
|
in the core of the battery cartridge
|
|
WHAT DO YOU RECORD NFTI IMAGES WITH
|
You record the NFTI images by using the external monitor cord.
|
|
WHERE IS THE BATTERY STATUS INDICATOR LOCATED ON THE NFTI
|
The viewing screen has a battery status indicator on the left.
|
|
WHICH MODE ALLOWS YOU TO MAKE RAPID ASSESSMENTS OF THE SITUATION ON THE NFTI
|
The pan operating mode allows you to make a rapid assessment of the situation.
|
|
TO USE THE NFTI WITH AN OBA,WHERE DO YOU POSITION THE COLTAGE STABILIZER TO AVOID CUTTING OFF BREATHING DURING SOME MOVEMENTS
|
To use the NFTI with an OBA, you need to position the voltage stabilizer behind the breathing tubes to avoid cutting off the breathing path during some of your movements.
|
|
HOW MUCH VOLUME OF CO IN THE AIR IS NEEDED FOR AN EXPLOSION
|
12%-74%
|
|
WHEN IS HCI EMITTED?
|
BY FLEXIFLOOR TILE MT 202 WHEN EXPOSED TO TEMPS OF 400 DEGREES
|
|
in a dc diagraph what do heavy lines show
|
watertight or oil tight bounderies
|
|
in a dc diagram what do lighter lines show
|
airtight , fumetight, or nontight bounderies
|
|
what do dotted lines show in a dc diagram
|
hidden bounderies, piping and valves
|
|
how is visible piping shown by in a dc diagram
|
solid lines
|
|
how is piping going through a bulkhead shown in a dc diagram
|
circle showing the point of penetration.
|
|
is there circling at the point of deck penetration
|
no
|
|
in compartments having dual egress routes through the space do both routes have to be marked
|
yes, if they lead eight to the hanger or flight deck it must be noted on top =of the arrow.. must be no lower than 12 in above the deck and no higher than 36 in above the deck
|
|
who maintains a master copy of the CCOL HARD COPY AND BACK UP DISC
|
DCA
|
|
what is the order of CCOL
|
access, misc closures, drainage
|
|
who approves changes to the CCOL
|
DCA
|
|
WHERE are ccols located
|
at each entrance of the space, marked duplicate to show completion
|
|
where are partial ccols located
|
in alcoves or areas seperate but without an exit.
|
|
what is condition watch I
|
1st complete readiness of immediate action
|
|
what is condition watch IA
|
ready to conduct amphib assualt
|
|
what is condition watch IM
|
mine ops
|
|
what is the 2nd degree of readiness or condition IE
|
temp. relaxation for meals and rest at battle stations
|
|
what is degree of readiness 3 or condition II
|
partly ready for immediate action, the rest on short notice
|
|
what is degree 4 or III
|
part read for action, part prolonged notice
|
|
what is degree 5
|
peacetime cruising
|
|
what is degree 6 or V
|
IN PORT PEACE
|
|
WHAT DIMENSIONS ARE BULLSEYE
|
2 inch lettering over a 12 by 15 inch wide label photo
|
|
x ray
|
no danger of attack, in a well protected harbor or secured at home in fiar weather or during normal working hours
|
|
yoke
|
at sea, entering exiting port,
|
|
midified yoke
|
yoke below waterline in closed
|
|
zebra
|
general quarters, leaving or entering port during war or when the hsip is in danger. red Z
|
|
modified zebra
|
higher survivabilty than than yoke, less restrictive than zebra.
|
|
circle x and y
|
without special permission by personell proceeding to or from battle stations to vital spaces. isolation valves
|
|
dog z
|
darken ship
|
|
william
|
ventilation
|
|
circle william
|
always open except cbr
|
|
fitting N S
|
normally shut
|
|
tightness OT
|
OILTIGHT
|
|
tightness WT
|
WATERTIGHT
|
|
AIRTIGHT
|
AT
|
|
FUMETIGHT
|
FT
|
|
WEATHERTIGHT
|
WEAT
|
|
FIRE ZONE
|
FZ
|
|
WHAT ARE SOME causes of leakage in degrees of tightness
|
corrosion, loose boundaries and joints
|
|
where is a common point of leakage
|
around the dog spindles
|
|
what is the purpose of casualty power
|
provides temporary transmission of power to damaged ares,
|
|
how are drainage systems actuated
|
power or gravity or combo
|
|
how is power used in drainage system
|
by positive pressure or suctions, elctric steam internal combustion or water driven . gravity glow and then pump through discharge system
|
|
where is the main drainage system located
|
main machinery rooms, either single pipe or loop
|
|
what is drainage system piping made out of
|
galvinaized or copper nickel, 2 1/2 in hose fittings instqalled in the main
|
|
hwat 3 things are installed in main drainage
|
steam reciprocatin gpumps, turbine motor driven centrifugal pumps, and eductors
|
|
where are secondary drainage systems located
|
drain spaces foward and aft of main machinery comp.
|
|
what 3 things are installed in secondary drainage
|
electric pumps, their own eductors, and portable ESPS
|
|
when a portable pump is used for dewatering, the _____ pressure is ______ than required for firefighting
|
discharge, lower
|
|
what are the 5 classifications of circuits
|
primary, auxiliary, supplementary, emergency, and misc
|
|
JA/NET 51
|
primary, captain circuit
|
|
2JZ
|
DAMAGE AND STABILITY CONTROL
|
|
3JZ
|
REPAIR 1, each primary circuit is identified by adding 2, so repair 2 would be 4 jz
|
|
how is an auxiliary circuit identified
|
with the letter x in front of the circuit name
|
|
where is the wiring for auxiliary circuits locaeted
|
as far away as possible form the primary
|
|
6jv
|
ballast control circuit
|
|
X40J
|
CASUALTY COMMUNICATION CIRCUIT
|
|
X50J
|
AFFF
|