Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
72 Cards in this Set
- Front
- Back
Front (Term) What type of signals are at interlockers |
Absolute |
|
List four examples of non-vital codes in electrocode? |
Back (Definition) 01 05 06 M Leading to trailing |
|
Front (Term) How are vital codes measured in electrocode? |
Back (Definition) Leading to leading |
|
What battery voltage does electrocode send to the tracks to run correctly? |
10-13 volts. |
|
Shunt foulings or not fail safe and need to be tested on the mainline. Shunt must be ____ of normal |
10% NTE. .1 |
|
Does shunt fouling detect a short or an open? |
Short |
|
Insulated joint stagger on mainline |
19'6" |
|
Insulated joint stagger on mainline
|
19'6"
|
|
Insulated joint stagger on turnout |
4'6" |
|
How often do you need to do a grounds test at a crossing and what release value are you looking for? |
75% 30 days |
|
How often do grounds test need to be performed at an intermediate signal |
90 days |
|
At what distance is a quick release circuit placed in front of hand throw switch on mainline |
50' |
|
How often do you need to test a 9B if it is a forced drop type switch lock |
4years
2 if not forced type switch lock |
|
How often does an electric switch lock need to be inspected |
90 days |
|
And electric switch lock will need to indicate at what measurement |
1/4" |
|
In a switch circuit which relay will tell you the exact position of the switch |
NWPR OR RWPR
the repeater |
|
What does NWCR or RWCR indicate |
If switch is in correspondence |
|
Will an m23b lock in indicate while in hand |
No |
|
Front (Term) Will a GRS lock and indicate while in hand |
Back (Definition) No |
|
Front (Term) Will an m23a lock and indicate while in hand |
Back (Definition) Yeswill |
|
What does sectional release allow for in route locking |
Quicker follow up moves |
|
How many flashes per minute must a light at the highway grade crossing flash |
35-65 |
|
At a highway grade crossing how many seconds should the lights flash for before the gates drop |
3 seconds |
|
At a highway grade crossing how many seconds should the lights flash for before the gates drop |
3 seconds |
|
At a highway grade crossing how much time should pass before the gates fully to descend |
10-15 seconds |
|
Once I had a highway grade crossing system activates how long before the gates are descended |
20 seconds |
|
Rounders on front mast |
30-15 |
|
Roundouls on back |
70-0 |
|
HGXR LIGHTS ON front CANTILEVER |
20-32 |
|
HGXR BACK OF CANTILEVER |
20-32 |
|
What is the purpose of the gate circuit controller |
Open and close contacts on relays |
|
In a predictor what affects the phase angle |
Ballast. |
|
In a predictor what affects the phase angle |
Ballast. |
|
RX increase or decrease as train approaches |
Decreases |
|
Yellow/green |
Advanced approach 50 mph |
|
Yellow/flashing green |
Approach limited 60 mph |
|
Dark/yellow |
Approach. 30 prepared to stop |
|
What signal controls the bowl tracks |
Trim |
|
Coupling speed |
3-4 |
|
What is needed to clean scanner lenses |
Anti fog solution. No rainex |
|
Warm bearing detectors alert desk at what temperature and how many before the desk calls |
100-169
3 times |
|
And integrity he test fail temps are between blank and blank |
0-99 |
|
Front (Term) How far below the top of rail should transducers be installed |
Back (Definition) 1 3/4 inch. +or- 1/8 inch |
|
Why would you get a hot journal nothing found alarm |
Loose connection |
|
How far should transducers be spaced |
24" center to center |
|
At what gauge are movable rails on a bridge measured at |
3/8. Fail at 3/8 |
|
PTC was designed to prevent |
Train to train collisions overspeed on train roadway worker limits protect the train from going through a switch left in the wrong position prevent movement past limits |
|
List the four main components that are required for PTC |
One office two communication three locomotive four wayside |
|
List the three types of hardware required for communication of the PTC system |
1 radio 2 WIU 3 IMG-2 |
|
Bnsf started prior to PTC implementation a different type of system what was it called |
ETMS electronic train management system |
|
Signal and track employees have four responsibilities outlined in EI 25 what are they |
Ensure that new signal and track assets are located maintain signal and track as set locations report any changes in signal and track affect locations with the CMP perform audits of signal and track assets as described in EEI 25 |
|
On what tracks PTC have to be installed according to FRA |
More than four passenger trains a day 15,000,000 tons any TIC and PIH |
|
When is a bridge considered properly locked |
When locking bar is within 1 inch of fully driven |
|
List the five different types of rail joints on movable bridges |
1 mitered 2 fixed easer 3 sliding easer 4 Conley 2 5 Conley 3 |
|
List the three different types of bridges |
1. Buscule 2. Lift span 3. Swing span |
|
How often are bridges tested |
Once a year except for sliding easer bar that is inspected monthly |
|
What are the three types of end bearings used on the bridges |
1. End lifts 2. Rollers 3. Wedges |
|
Name four locations where it is acceptable to have the same polarity on each side of an insulated joint |
Number one DC track circuit battery to battery locations number to DC circuit Electrico track if circuit has lots of shot number three DC track relays in the center of a crossover that has to track circuits number four at insulated joints in the center of crossovers that are designed with Shunt fouling |
|
How often are Bond wires in the interlocking inspected |
Monthly |
|
How often are Bond wires outside of an interlocking inspected |
6 months |
|
On and M 23 how often is the clutch inspected |
2 years Installation or modified. |
|
Can you use an emery cloth on a DC motor commutator |
NO |
|
What is the signal instruction for batteries |
10.1 |
|
When does an ATS inductor need to be installed |
When trains travel faster than 79 mph |
|
How often is an ATS and Inductor gauged. |
Monthly |
|
ATS inductors are to be installed how many feet from the signal it governs |
50 |
|
An inert ATS Inductor. is either always open or always closed |
Open |
|
ATS inductor insulation must be tested how often |
6 months |
|
What does a stick really prevent at a highway grade crossing |
Receding ring |
|
On a tunable joint coupler what part allows AC through |
Capacitor |
|
What will happen on a hotbox detector both polarities or backwards |
You will have the wrong temperature |
|
Name one gay man in 2015 signal class.
|
SETH HALE
Seth Hale Seth hale |