• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/12

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

12 Cards in this Set

  • Front
  • Back

HSW SECTION 6


Risk management


Q1) List the 5 stages of risk managenent process.

A1)


haz id


Risk assses


Risk control


Review and monitor controls


Evaulate the risk management process

Q2) What are the 3 critical risk areas.

A2)


Physical safety ( burns , fractures, loss of consciousness)


Work related health. ( hep b, asbestosis, cancers, heart disease)


Psy wellbeing

Q3)


Give the 10 critical risks that most endanger fenz personnell.

A3)


Moving vehicles


Fire and explosive mat


Haz subs


Heights


Water and weather


Unstable footing, overhead objects and structures.


Respirable and absorbable pathogens/carcenogins


Acute/ post psy stress and trauma


Cardiovas disease


Fatigue



Q4)

A)4

Q4) FENZ CLASSIFIES

A)4

Q4) FENZ classifies hazards into 7 types. What are they?

A)4


Physical


Environment


Chemical


Biological


Ergonomic


Psycological


Mobile plant.


Q5) SPC includes

A5)


Maintain sit aware


Aware of haz


Elim min risk


Acceptable risk


DRA


UneXpexted changes


Op procedures


training


Ppe


Right tools

Q6) SPC uses 3 simple statements , what are they?

A6) will-may-will not

Q6) SPC uses 3 simple statements , what are they?

A6) will-may-will not

Q7) When must a hazard identification survey be done?

A7)


New procedures


Training activity


Special projects


Procurement projects.

Q8) DRA uses what matrix.

A8). Liklihood x consequence = risk rating.

Q9) HSW


SECTION 17 Deals with what ?

A9) SUPPORT SERVICES.