• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/6

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

6 Cards in this Set

  • Front
  • Back

_____planning is tied to resources, while____ planning is not.

Strategic, comprehensive

A weakness of the rational planning model is that it:

Assumes that public mangers can predict the future

A weakness of logical incrementalism is that it:

can be overly cautious and path dependent

The three essential steps in crisis management are prevention, preparation and____

containment

Which of the following is NOT an advantage of the rational planning model

Builds on the premises of logical incrementalism

A proposed set of specific actions intended to implement a plan is called a

Program