Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
37 Cards in this Set
- Front
- Back
what happened to the USS thresher and when |
piping failure April 10 1963 |
|
when was the SS Challenger accident? |
jan 28 1986 |
|
USS IWO JIMA accident date |
OCT 30 1990 |
|
What does QA ensure? |
provides procedures and guidance to ensure with a reasonable level of confidence the work preformed on navy ships is accomplished with first time quality |
|
What are the two types of a DFS? |
Major-departure that affects preformance,durability,reliability must be approved by NAVSEA or tycom Minor- must be approved by tycom or ISIC |
|
What is the form for a dfs? |
QA form 12 |
|
What two ways can a dfs be approved? |
permanant or temperary |
|
all dfs for submarine must be approved prior to what? |
going underway |
|
FME shall be |
Fire resistant no brittle non melting no tearable |
|
covers and plugs of fme will be made of what? |
rubber, metal, ridgid plastic |
|
what must a controlled job site be marked |
physical barrier marked sign |
|
when may a controlled material not have a QA tag? |
on a CWS |
|
A fwp must contain the following? |
material initial conditions procedure test and inspections system restoration May also include loep general info responsibilities precautions |
|
FWP must be approved by who? |
PEO planning and estimating officer LWC lead work center sup AWCS assistant wcs awc div officers repair officer does final review before he approves it for oppening |
|
CWP is... |
same as fwp but with additional steps must be approved by qa officer prior to repair officer |
|
maintenance certification record re entry control form is what qa form? |
QA form 12 |
|
cwp=? |
fwp+oqe |
|
rivision criteria for FWP/CWP? |
scope of work changes bountry of work changes change in test requirements change in material requirements if radcon is insufficient mcr/rec revised |
|
what block and form must the craftman verifies is signed? |
block 15d of the QA form9 |
|
QA form 2 |
non nuclear material id tag |
|
qa form 3 |
controlled material reject tag |
|
qa form 11 |
cwp/rec log |
|
qa form 17 |
test and inspect record |
|
QA FORM 34 |
joint conponent torque assembly record |
|
what are the tourque criterias? |
breaking running required final |
|
rework is defined as? |
the unplanned repitition of a step in a FWP |
|
who does the wcs take a problem to if there is a disprepensy in the FWP? who assigns the addendum serial number and who signs it? |
planning and estimating (R-7)-to create rework addendum R-8 div-o for fwp PEO and QAO for CWP |
|
R margin sybols S C I CI Q |
(R) radiological (S)ships force (C)cleanliness (I) QAO or NDT (CI) RCI reactor cleanliness inspector (Q) critical quality control points (V) verification by craftsman (G) government notification required |
|
what are q points? |
quality control points, require skillz,proficiency,strong knowledge, narrow tolerances |
|
things to consider with q points |
when in doubt its a q appropriate supervision not tired |
|
pen and ink changes to FWP's |
Only for minor changes not affecting scopre or intent of FWP |
|
who must approve pen and ink changes to OQE must be approved by who? |
QAO/QAS or a QAI |
|
what must be next to a pen and ink change? |
approving authority/date/craftsman initial |
|
quality assurance is defined as what? |
a sysytematic review of Quality maintenance records which provide proof that work was preformed |
|
what does waf stand for? |
work requiring formal authorization |
|
what does a MIC stand for and do? |
Material id and control number (like a ssn) |
|
deep |
sea |