• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/96

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

96 Cards in this Set

  • Front
  • Back

If in the inspector discovers that the work of a subcontractor is deficient, he or she should direct the subcontractor to make the necessary corrections, then tell the general contractor what was done.

False

Inspectors diary may be in looseleaf warm as long as the pages are numbered in ink

False

An inspector should always try to get the contractor to give the owner of the highest quality materials and workmanship, regardless of what specifications call for.

False

Front loading of a contractors bid is not always an illegal form of unbalancing a big.

True

On grant-funded projects and public works projects and states requiring the specifier to allow or equal products, if the specifier list two or more brand-name products, he or she does not have to add the words “or equal.“

False

The rivers and harbors act of 1899 applies to both public and private projects.

True

As an excepted standard of quality, Acceptance by the engineer of a supplier certificate is a valid substitute for manufactures Mills test certificate

False

Has a mean of minimizing conflicts between the inspector and the contractor, it is better to set absolute Dimensions rather than an allowable range, so that the inspector has a specific value to enforce

False

A change order can be issued anytime after execution of the agreement.

True

The authority to make design changes in the field during construction can be exercised by which of the following person's?

The design engineer

The basic responsibility for planning construction operations is that if the:

Contractor

Evaluation of a contractor's construction schedule should be limited to which of following considertions

Completion date , network logic, beginning date

Supervision of the construction work is the responsibility of

The contractor

If a soils report for a potential construction site was prepared under a contract with the owner prior to advertising for bids, indicate which of the following may be properly included in the contract documents without excessive risk:

Log of borings

When you received the contractors monthly partial payment request on a unit price project, the engineer resident project representative should

All the contractors field quantities accurately, with all materials delivered to the site, and the contractors claims to percentages of the various parts of work completed.

Is generally considered as being responsible for dimensions on shop drawings?

Contractor

The sequence of construction operations on a project involving a single general contract is usually established by the

General contractor

Under the construction specifications institute format (CSI format) the three parts of a technical specifications section

General provisions, materials, and execution

Under the construction specifications institute format (CSI format) the three parts of a technical specifications section

General provisions materials and execution

The contractor has subcontracted the cement finishing and shortly after troweling a slab , it begins to rain. Whose responsibility is to see that the slab is protected

Public agency /owner of the project

Unless otherwise specified, the specifications normally take precedence over:

Drawings

A resident project representative may direct a change in the work when such change is authorized in writing by

The owner

Which of the following statements is true if a subcontractor works one of its crews forty four hours in one week and does not pay the workers overtime

Both the contractor and subcontractor may be held accountable according to the contractor documents and the labor laws

If you are employed as the resident project representative on a project, upon being given specific instruction as too special quality control methods on a type of material you have worked with for many years without special controls YOU should:

Follow them faithfully, even if you do not understand the reasons for such special requirements

With regard to inspecting of onsite tests, the engineer or inspector should:

Require reasonable notice

The types of Bonds traditionally required on public works contracts are which of the following

Payment bond, bid bond, & performance bond

The inspector usually communicates with subcontractors through

The contractors super intendent

Bidder A wrote it's proposal as follows "concrete 300 cu. Yds. @150.00 - $40,000" in the bid evaluation the controlling price would be.


45,000

The principal steps (not necessarily in proper order) for bidding and contracting for construction are:

Award, agreement, advertising, notice to proceed, open bids

The inspector may make inspections and tests:

Anytime he or she desires

The inspector may make inspections and tests:

Anytime he or she desires

The method of performing work is the province of the

Contractor

The inspector may make inspections and tests:

Anytime he or she desires

The method of performing work is the province of the

Contractor

A preconstruction conference should be held

After agreement but before notice to proceed

The inspector may make inspections and tests:

Anytime he or she desires

The method of performing work is the province of the

Contractor

A preconstruction conference should be held

After agreement but before notice to proceed

In field testing, the inspector should

Take field sampled to check on materials on the job.

The inspector may make inspections and tests:

Anytime he or she desires

The method of performing work is the province of the

Contractor

A preconstruction conference should be held

After agreement but before notice to proceed

In field testing, the inspector should

Take field sampled to check on materials on the job.

The final decision regarding additions, deductions, and alternates in the contract tests with

None of the above

A section of concrete formwork erected by an approved sub-contractor fails and damages previous work. Who is responsible to the owner for this act?

The contractor

A section of concrete formwork erected by an approved sub-contractor fails and damages previous work. Who is responsible to the owner for this act?

The contractor

On a project that supports a full time on site resident project representative and a project manager who is based in the home office to whom should contractor submittals (including all shop drawings) be submitted first?

The contractor

A section of concrete formwork erected by an approved sub-contractor fails and damages previous work. Who is responsible to the owner for this act?

The contractor

On a project that supports a full time on site resident project representative and a project manager who is based in the home office to whom should contractor submittals (including all shop drawings) be submitted first?

Resident project representative

A resident project representative should be aware of project safety and if he or she observes a hazerdous condition while inspecting the work, the first thing he or she should do is:

Order any workers to move out of the hazerdous area

If the resident project representative is verifying the contractors estimate of work done to date, which of the following is true?

Material delivered but not Incorporated into the work should be verified and may be included

Which of the following listed tasks is not recommended to be performed by the architect or engineer:

Recommend to the contractor the method of performing the work

Progress payments are made to the contractor based upon

An estimate of the work done as submitted by the resident project representative.

The responsibility for coordinating the installation of mechanical and electrical work so as to avoid conflicts with the architectural or structural elements belongs properly to the

General contractor

The document referred to as federal specifications refers primarily to

Materials

A dispute between subcontractors regarding material storage or access to the work should be settled by

The general contractor

Of the following , the primary consideration in the timing / scheduling of inspections should be:

To avoid costly delay for the builder

By definition, free float is

The amount of time that an activity canbve delayed without adversely affecting the early start date of the following activity.

A resident project representative may permit the use of substitute materials if:

They have been approved by the architect/engineer

Which of the following is most directly involved in project safety

Contractor

If two subcontractors come to the resident project representative or inspector with a heated argument about priority of their work the resident project representative or inspector should

Refer them to the general contractors superintendent

The main purpose of construction inspection is to

Assure compliance with contract documents

Many reference standards exist today that still carry the designation "ASA". Which bid the following is the current designation for ASA standards?

ANSI

Which of the following person's has the final authority to accept or reject faulty work?

The owner

Which of the following is the most commonly used reference work on the subject of testing materials?

ASTM

Contract documents usually include

Trade standards and federal specifications

Due to several illnesses among it's workforce a contractor was short several workers for concrete placing and requested the assistance of the resident project representative. To what extent may the resident project representative be permitted to help?

None of these

The provisions of ASTM refer primarily to

Materials and testing

When there are questions by the general contractor to the inspector, the inspector should

Resolve them if they are within his or her authority

The inspector may reject materials or work if

It does not comply with specifications

All documents are of concern to the resident project representative and his or her inspector; however which of the following contract documents is probably of least direct concern to the inspector?

The agreement

A resident project representative should be held responsible for

Keeping the architect engineer informed as to the progress of the work.

If a public works specifications cites an item of equipment by it's manufacturer name and catalogue number, is it generally allowable for a different brand or your of equipment to be installed if it is of equal quality and utility

Yes with approval of the architect and engineer

Authorization to the contractor to perform work which involves a deviation from the requirements of the contract documents is called a

Change order

The term substantial completion unless redifined in the contract documents normally means that

The contractors obligations under the contract have been satisfied even though some minor items of pickup work remain

If there is a conflict between the following DOT contract documents, which all normally control

Special provisions

Prior to completion of the work, all materials incorporated in the building during construction become the responsibility of the

Contractor.

The inspector's relationship to the contractor is like that of

None of the above

Before going on the job a resident project representative should:

Understand the plans and specifications for the project

Upon receiving your copies of the contractors CPM diagram and regular updated printouts of scheduling data, the engineer or owner should:

Review the schedules for logic, task durations, and ability to meet specified dates.

A resident project representative should:

Supervise the activities of the inspection on the project

Which of the following Qualities in a resident project representative is More important

Decisive

When an owner starts to use a project before completion of the work, it is called "beneficial use." In the following list, indicate the item that is not true after an owner takes beneficial use

Owner may continue to charge liquidated damages for delay in achieving final completion of the work

While some variation in the number of inspections necessary for structures can be expected, generally the amount of inspection needed for a structure will be most dependent upon the:

Complexity of the structure or project

The architect engineer relies on whom for assurance that the monthly estimate of work performed as submitted by the contractor is valid

The resident project representative

A bonding company is most concerned with the work of the

Contractor

What relationship should the project representative maintain with the contractor?

Business like

In which document is the most likely to find the requirements for the type of material required to be used in the work ?

Specifications

Unsatisfactory progress of the work should first be reported by the resident project representative

To the project manager

In most States the parties to a construction contract can agree to resolve disputes through binding arbitration

At the time of signing the contstruction contract

Construction inspection is necessary to

Assure compliance with plans and specifications

Except for federal contracts, if a change is required in the contract documents after signing a contract for construction, the type of documebt used to implement that change is called

A change order

A subcontractor reports that the approved material is no longer in production. The sub contractor then brings in data claiming the superiority of a new substitute product. The resident project representative should:

Leave the decision to the design engineer of record

A resident project representative's principal responsibility on the project is to:

Assure that the contractor performs per approved plans and specifications.

In practice a construction inspector is primarily supposed to play the part of a

Competent observer

A modification in the contract should be covered by a

Change order